Port Berth Productivity, Crane Deployment & Vessel Turnaround Tool
Translate vessel move counts into a practical berth plan. Test ship-to-shore crane deployment against yard and transport constraints, simulate vessel arrivals and competing berth calls, and compare the departure effects of an additional crane or fewer nonproductive hours.
Port Call & Working Capacity
Vessel Call & Berth Queue Register
ETA is hours from the planning start, not an absolute calendar date. Requested cranes are constrained by the available crane roster. Vessel-specific move factors capture stowage and workload complexity.
| Use | Vessel / call | ETA h | Moves | Requested cranes | Priority | Berth preference | Setup h | Idle h | Closeout h | Work factor % | Target port h | Time cost USD/h | Remove |
|---|
Ship-to-Shore Crane Roster
Each crane has its own productive moves per working hour, availability factor and technical status. The simulator shares serviceable cranes across concurrently berthed ships.
| Use | Crane ID | Operating moves/h | Availability % | Work factor % | Status | Equipment notes | Remove |
|---|
Timed Yard / Truck / Crane Disruptions
Within each event window, multiply yard and transport capacity by the entered percentages and reduce active crane count by the specified number. Overlapping events apply cumulatively, capped at zero.
| Use | Disruption | Start h | End h | Yard capacity % | Truck capacity % | Cranes unavailable | Remove |
|---|