SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

17Live Radars 300Maritime Tools
24/7Intelligence Focus
GlobalIndustry Coverage
RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…

Ship HVAC Cooling Load, Chiller Capacity & Airflow Tool

Accommodation Cooling Load • Moist-Air Ventilation Load • Chiller Duty • N+1 Capacity • Supply Airflow • AHU Capacity • Chilled Water Flow • Ambient Sensitivity

Ship HVAC Cooling Load, Chiller Capacity & Airflow Tool

Size and stress-test shipboard accommodation HVAC from the cooling load outward. Simple mode gives a fast summer capacity and airflow screen. Advanced decomposes each zone into transmission, solar, occupants, lighting, equipment, ventilation, infiltration and latent load, then checks chillers, AHUs, N+1 redundancy, chilled-water flow, condenser heat rejection and hot-weather sensitivity.

Figures represent
↑
Fast accommodation HVAC screen.The default summer basis uses ISO 7547:2022 values of 35°C / 70% RH outdoors, 25°C indoors and 8 L/s-person outdoor air. Adjust the inputs for the vessel specification, route and project design basis.
CoolingSensible + latent design load
AirflowSupply and outdoor-air demand
PlantChiller margin and CHW flow

Summer Design Case

m² of accommodation / conditioned spaces.
m.
°C.
% RH.
°C. Simple mode assumes 55% indoor RH.
persons.
L/s-person. ISO 7547:2022 default basis is 8.
W/m² planning factor. Advanced mode decomposes this.
°C leaving AHU / design supply air.
kW available at the entered design condition.

Plant Design Basis

°C.
%.
W/person, project input.
W/person, project input.
% effective. Enter zero if none.
% effective.
% applied to summed zone load. Project-specific.
% added after diversity.
% of design requirement after loss of largest unit.
°C.
°C.
K, for indicative heat-rejection flow.
% of estimated supply fan input reaching conditioned air.

Conditioned Zone Register

Boundary temperature can represent outside structure or a hotter adjacent space such as an engine room. Outdoor air is the greater of occupancy ventilation and exhaust make-up. Total supply airflow is the greater of sensible-load airflow, outdoor-air demand and entered minimum supply ACH.

UseZoneArea m²Height mPeopleIndoor °CRH %Boundary area m²Boundary °CU W/m²KSolar area m²Solar W/m²Shading %Lights W/m²Equipment W/m²Outdoor air L/s-pExhaust L/sInfiltration ACHSupply °CMin supply ACH

Chiller Register

Enter usable cooling capacity at the relevant evaporating/condensing design point or apply a user-entered derate. N+1 removes the largest available effective unit.

UseAvailable?UnitDesign capacity kWDerate %Max duty %Rated input kW

AHU / Supply Fan Register

Fan input is estimated from airflow × static pressure ÷ fan and motor efficiency. Available airflow is derated and limited by the entered maximum duty percentage.

UseAvailable?AHU / FanSupply m³/sDerate %Max duty %External static PaFan eff %Motor eff %
Engineering boundary: this is a load, airflow and plant-capacity planning tool. Vessel specification, flag/class requirements, fire-zone and smoke-control arrangements, equipment manufacturer selection data, duct pressure calculations, noise limits, hazardous-area requirements and commissioning measurements remain controlling.
By the ShipUniverse Editorial Team — About Us | Contact