Cruise Ship Wastewater Treatment Capacity & Cost Calculator
Size a cruise-ship sewage and greywater treatment plant from people onboard and wastewater streams, test peak hydraulic capacity and holding-tank endurance, then estimate electricity, chemical, sludge, shore-reception and lifecycle treatment cost. Advanced mode separates individual wastewater streams, plant availability, peak-hour flow, storage, utility sources and retrofit economics.
People & Wastewater Generation
Use average persons onboard and representative blackwater/greywater generation for the operating profile being screened.
Treatment & Cost Basis
People & Operating Profile
Wastewater Stream Register
Use only streams routed to the treatment/holding system being analyzed. Values are planning inputs, not regulatory generation factors.
| Use | Stream | Population basis | L/person-day | Treatment share % | Daily m³ |
|---|
Treatment Plant & Hydraulic Capacity
Holding & Sludge Storage
Treatment Utilities & Variable Cost
Sludge, Shore Reception & Service
Retrofit / Replacement CAPEX
Lifecycle Assumptions
Compliance / Operating Readiness Checks
Planning checks only. They do not certify MARPOL compliance or treatment-plant performance.
Stress Cases
| Use | Case | Persons | Flow | Availability | Cost |
|---|
Results update live as inputs change. Calculate records the structured result.
| Year | OPEX | Renewal | Discounted cost | Cumulative PV |
|---|
| Case | Peak m³/day | Capacity util. | Required m³/day | Annual OPEX |
|---|