Marine Electrical Distribution • Cable Derating • Voltage Drop • Breaker Window • Fault Duty • Route Capacity

Shipboard Cable Ampacity, Voltage Drop, Breaker & Retrofit Route Capacity Tool

Screen whether an existing or proposed shipboard cable circuit can carry a retrofit load without exceeding derated cable ampacity, voltage-drop limits or breaker protection windows. Simple mode answers the core circuit question quickly. Advanced adds starting drop, detailed derating, breaker fault duty, route fill/weight, multiple retrofit circuits and installation readiness.

Figures represent
Need much more depth? Click Advanced above.Advanced adds separate derating factors, starting drop, reactance, parallel runs, fault duty, route fill and support weight, multiple circuits and engineering readiness.
Fast10 primary inputs
Core answerAmpacity + VD + breaker
TransparentDefaults disclosed below

Fast Circuit Screen

Use approved manufacturer/project data for base ampacity and conductor resistance. Simple mode assumes one cable run and tells you when one run is not enough.

V.
kW.
m.
A from approved cable data.
Ω/km.
A.
% project/company limit.

Retrofit Power & Route Basis

Route fill is only a planning screen. Segregation, EMC, fire boundaries, transits, supports, bend radius and pull access can govern earlier.

%.
%.
mm.
mm.
%.
kg/m.
kg/m. 0 disables.
currency/cable-m.

Advanced Circuit Electrical Load

V.
kW.
%.
%.
m.
%.
%.

Cable Ampacity & Impedance Basis

Do not infer shipboard ampacity from conductor size alone. Use applicable manufacturer/class/project current-carrying data.

A.
Ω/km at operating temperature.
Ω/km.
mm.
kg/m per physical cable.

Breaker & Fault-Duty Screen

A.
kA.
kA.

Additional Circuits Sharing This Route

Optional. Add only other retrofit circuits that share this cable route. The primary circuit above is already included automatically and must not be entered again here.

CircuitSystemVkWPFEff %LengthMargin %ParallelBase ADerateRXMax VDBreaker AFault kABreak kAOD mmPhys/runkg/m

Engineering & Installation Readiness

Calculation inputs may be stored to improve Ship Universe tools. Benchmark participation is separate. Privacy Policy.
Electrical engineering screen only: this is not a class-approved cable-sizing, protection-coordination, short-circuit, arc-flash, harmonics, EMC, fire-safety, hazardous-area or selective-tripping study. Breaker acceptance also requires trip characteristics, making/breaking duty, selectivity and cable short-circuit withstand.
By the ShipUniverse Editorial Team — About Us | Contact