Bilge Generation • Holding Capacity • OWS Throughput • 15 ppm Readiness • Sludge Interaction • N-1 Redundancy • Port / Polar Retention • Reception Planning

Engine Room Bilge & Oily Water Capacity Tool

Model engine-room oily bilge water as an inventory-and-treatment problem instead of a single separator rating. Simple mode checks generation, holding-tank endurance and planned OWS capacity. Advanced adds source-by-source bilge and sludge generation, multiple tanks, multiple oily-water separators, 15 ppm alarm/automatic-stop readiness, N-1 capacity, voyage operating legs, shore reception and separated-oil residue into the sludge system.

Figures represent
Capacity screen, not a discharge authorization.Select OWS overboard use only when the vessel has independently confirmed that the planned discharge is permitted and all MARPOL, flag, coastal-State, equipment and operating conditions are satisfied.
GenerationDaily oily bilge inflow
TreatmentOWS effective m³/day
EnduranceTime to planning ceiling

Bilge Holding & Generation

m³/day.
m³.
m³.
days.
% of usable holding capacity.

OWS Capacity Basis

m³/h.
% of rated throughput.
h/day.

Planning Limits

% of usable capacity.
% of usable capacity.
% of baseline oily-bilge generation.
L of separated oil/residue per m³ bilge processed. User-entered planning factor.

Oily Bilge Water Source Register

UseSourceGeneration m³/dayDuty %

Oil Residue / Sludge Source Register

Sludge is kept separate from oily bilge water. OWS-separated oil is added automatically from the entered residue-yield factor.

UseSourceGeneration m³/dayDuty %

Oily Bilge Water Holding Tanks

UseAvailable?Capacity m³Current fill %Usable %

Oil Residue / Sludge Tanks

UseAvailable?Capacity m³Current fill %Usable %

15 ppm Oily Water Separator Register

A unit contributes overboard-treatment capacity only when it is marked available and its 15 ppm alarm / automatic-stop or recirculation readiness is marked ready.

UseAvailable?Rated flow m³/hDerate %Max planned h/day15 ppm alarm + auto-stop ready?

Voyage / Operating Leg Register

“OWS planned” means the user has independently verified discharge conditions for that leg. Polar mode always sets overboard OWS handling to zero. Shore quantities are removed at the start of the leg, limited by onboard inventory.

UsePhaseDaysBilge factor %Sludge factor %Handling modeOWS h/dayBilge shore reception m³Sludge shore reception m³

Pollution-Prevention / Record Checks

Regulatory boundary: this tool never decides that an overboard discharge is lawful. MARPOL Annex I conditions, the ship’s approved equipment/certificates, flag-State requirements, coastal/port-State rules and the actual 15 ppm alarm/automatic-stop system control. Sludge is modeled as a separate retention/disposal stream and is not credited as OWS overboard throughput.
By the ShipUniverse Editorial Team — About Us | Contact