Bulk Carrier Cargo Liquefaction, TML & Moisture Margin Tool | ShipUniverse
IMSBC Group A • TML • Moisture Content • Hold-by-Hold Acceptance • Rain Exposure • Dynamic Separation • Cargo Survey

Bulk Carrier Cargo Liquefaction, TML & Moisture Margin Tool

Screen whether a solid bulk cargo presented for loading remains below its certified Transportable Moisture Limit, how much moisture headroom exists, whether certificates and sampling remain current, and how rain or hold-by-hold variation can consume that margin. The tool deliberately prevents a dry-looking can test or a calculated average from overriding certified TML, representative moisture testing and the Master’s stop-loading authority.

Currency
Currency selector changes display only. No exchange-rate conversion is performed.

Cargo & IMSBC Basis

Use the cargo’s actual IMSBC schedule and signed shipper documentation. Presets below are descriptive only and do not assign a legal TML.

Certified TML & Current Moisture

% by mass, wet basis. Enter the signed certificate value.
% by mass, wet basis.
Optional cross-check only. Certified TML controls.
tonnes, used for moisture-mass and commercial calculations.
percentage points. Owner/company planning screen only, not an IMO substitute threshold.
t/m³, optional operational context.

Hold-by-Hold Moisture Register

Any failed hold / parcel controls the overall acceptance signal. The tool does not average a wet hold into compliance with drier holds.

Hold / parcelCargo tTML %MC %MC age dRain since sampleRetestedCan-test observation

Certificate, Sampling & Moisture-Control Status

months since the TML test. IMSBC maximum is six months unless characteristics/composition change sooner.
days before commencement of loading. IMSBC maximum is seven days.

Rain / Water-Ingress Scenario

This is a sensitivity model only. It estimates how additional water could erode the certified moisture margin; it cannot replace re-sampling and laboratory testing after a material change in moisture condition.

m² of stockpile, barge or open hatch area exposed.
mm.
% of incident rainfall retained by the cargo. User estimate only.
tonnes. If above zero, this overrides rainfall-area calculation.

Field Observations & Voyage Indicators

A favorable can test never proves cargo is safe. A suspect result is a stop-and-investigate flag.

Delay / Survey Cost Exposure

per day.
hours.
Optional exposure context only.
Safety limitation: This tool does not authorize loading or carriage. The certified TML, representative moisture-content testing, shipper declaration, competent-authority approvals, applicable IMSBC cargo schedule, Master’s judgment, independent survey advice, flag/port requirements and ship-specific procedures control. A can test is only a field indication and must never be treated as a laboratory pass. Calculated rain sensitivity cannot replace re-sampling and testing after a material change in moisture condition.
By the ShipUniverse Editorial Team — About Us | Contact