S-100 ECDIS, S-101 / S-57 Dual Fuel, Bridge Interfaces, Crew Familiarization, Rollout Cost & 2029 Transition Planning

S-100 ECDIS Upgrade, Bridge Integration & Crew Transition Cost Tool

Plan an S-100 ECDIS transition without treating 1 January 2029 as a fleetwide retrofit deadline. Screen station upgrades or replacements, bridge integration, testing, commissioning and crew familiarization. Advanced mode separates S-101/S-57 dual-fuel capability, bridge interfaces, optional S-100 data products, class/flag work, training roles, recurring data/service cost and lifecycle fleet budget.

Data type
Currency
Currency selection changes display only. No exchange-rate conversion is performed.
↑
Need a full bridge transition plan? Click Advanced above. Add S-101/S-57 dual-fuel readiness, S-100 product goals, bridge interface revalidation, route-plan exchange, testing, class/flag effort, crew-role training, recurring chart/data cost and lifecycle fleet budget.

Fast S-100 Upgrade Cost Screen

The 2029 date applies to new ECDIS installations under the revised IMO performance standards. Existing installed ECDIS are not automatically assigned a universal 2029 replacement deadline by this tool.

Selected currency / station.
Interfaces, configuration, tests and documentation.
Selected currency / officer-hour.
Selected currency / vessel.

Program & Regulatory Timing Basis

years.
years.
%.

ECDIS Hardware, Software & Type-Approval Cost

Used when path = full replacement.
Fleet-level allowance.

S-100 Capability & Data-Service Goals

S-101 is the next-generation ENC. During the transition, S-57 and S-101 may both be relevant. Additional S-100 products can be project goals where supported and available; this tool does not state that every listed product is mandatory on every ship.

Incremental recurring cost.

Bridge Interface Revalidation Register

Use one row per external system or interface family. Labels are excluded from Ship Universe Tool Data.

Interface / systemQty / vesselIntegration hours / itemEngineering cost / hourHardware / licence / itemRe-test hours / itemNeeds protocol / gateway change?

Bridge / Navigation Integration Checks

FAT, HAT, SAT & Operational Transition

h/vessel.
h/vessel.
Selected currency / hour.
% on non-recurring project cost.

Crew Transition & Familiarization Register

Use role counts for people needing transition training. Role labels are excluded from Ship Universe Tool Data.

RolePeople / vesselTraining hours / personCourse fee / personLoaded labour / hourTravel / relief / person
Upgrade-planning screen only: this tool does not determine ECDIS type approval, establish carriage compliance, verify IHO product availability on a specific route, approve bridge interfaces, replace a flag/class survey or establish crew competency. Existing ECDIS do not become universally non-compliant on 1 January 2029 solely because they are not S-100 capable. Confirm the applicable installation date, equipment approval basis, flag requirements, vendor support and company procedures for each vessel.