S-100 ECDIS Upgrade, Bridge Integration & Crew Transition Cost Tool
Plan an S-100 ECDIS transition without treating 1 January 2029 as a fleetwide retrofit deadline. Screen station upgrades or replacements, bridge integration, testing, commissioning and crew familiarization. Advanced mode separates S-101/S-57 dual-fuel capability, bridge interfaces, optional S-100 data products, class/flag work, training roles, recurring data/service cost and lifecycle fleet budget.
Fast S-100 Upgrade Cost Screen
The 2029 date applies to new ECDIS installations under the revised IMO performance standards. Existing installed ECDIS are not automatically assigned a universal 2029 replacement deadline by this tool.
Program & Regulatory Timing Basis
ECDIS Hardware, Software & Type-Approval Cost
S-100 Capability & Data-Service Goals
S-101 is the next-generation ENC. During the transition, S-57 and S-101 may both be relevant. Additional S-100 products can be project goals where supported and available; this tool does not state that every listed product is mandatory on every ship.
Bridge Interface Revalidation Register
Use one row per external system or interface family. Labels are excluded from Ship Universe Tool Data.
| Interface / system | Qty / vessel | Integration hours / item | Engineering cost / hour | Hardware / licence / item | Re-test hours / item | Needs protocol / gateway change? |
|---|
Bridge / Navigation Integration Checks
FAT, HAT, SAT & Operational Transition
Crew Transition & Familiarization Register
Use role counts for people needing transition training. Role labels are excluded from Ship Universe Tool Data.
| Role | People / vessel | Training hours / person | Course fee / person | Loaded labour / hour | Travel / relief / person |
|---|