Air Draft & Bridge Clearance Tool
Calculate vessel air draft, current or projected overhead clearance, physical separation and margin after operator-entered safety allowances. Simple mode checks one bridge quickly. Advanced derives vessel air draft from geometry if desired, handles tide/river-stage corrections, multiple bridges or overhead obstructions, local uncertainty, motion/heel/roll allowance, lowerable equipment, route bottlenecks and water-level sensitivity.
Fast Bridge Clearance Screen
Use the best current vertical-clearance / air-gap source available. Positive expected water-level rise reduces bridge clearance one-for-one.
Vessel Air-Draft Basis
Overhead Obstruction Route Register
Use Direct Current Air Gap when a trusted current measurement is available. Use Reference + Water Level when clearance is published relative to a defined water-level datum or gauge. Formula: current air gap = reference clearance β (current water level β reference water level).
| Type | Clearance basis | Direct air gap | Reference clearance | Reference water level | Current water level | Local uncertainty |
|---|