Cruise Ship Freshwater Production & Desalination Cost Tool
Estimate whether onboard freshwater production can cover cruise-hotel demand, how much water must be bunkered or supplied ashore, and what the resulting energy and operating cost looks like. Advanced mode dispatches multiple desalination units by marginal production cost, tests N-1 capacity and shows how long stored potable water can bridge a production outage.
Fast Freshwater Production Screen
Exactly 10 primary inputs. Onboard plant production is capped at derated effective capacity; any remaining demand is assigned to shore/bunkered water.
Shipwide Water & Economic Basis
Freshwater Demand Streams
Daily stream demand = units × litres/unit/day × usage factor. Stream names are excluded from Tool Data.
| Demand stream | Units / people | Litres / unit / day | Usage factor % | |
|---|---|---|---|---|
Desalination / Freshwater Production Units
Effective capacity = rated capacity × availability. Daily dispatch uses the lowest modeled marginal production cost first. Unit names are excluded from Tool Data.
| Production unit | Technology | Rated m³/day | Availability % | Electric SEC kWh/m³ | Variable O&M / m³ | Heat / utility opportunity cost / m³ | |
|---|---|---|---|---|---|---|---|