Ship Universe Maritime Tool
Ballast Pumping Time, Energy & Port Cost Tool
Estimate ballast or deballast operation time, effective transfer rate, BWTS bottlenecks, pump and treatment-system energy, generator fuel, direct operating cost and port-time exposure. Advanced mode models multiple ballast stages and identifies where pump capacity or ballast water treatment capacity is restricting the operation.
Currency is display only. No exchange-rate conversion is performed.
Pumping Time
Volume, pump capacity, utilization and setup time
BWTS Bottleneck
Compare pump throughput with treatment-system capacity
Port Cost
Electrical energy, generator fuel and vessel-time exposure
Ballast Operation
The effective transfer rate is limited by the lower of available pump throughput and entered BWTS treatment capacity.
m³
pumps
m³/hour
%
Accounts for head, piping losses, tank level, valve position
and other reductions from rated flow.
m³/hour
Enter 0 if no treatment-capacity constraint is being modeled.
hours
Pump & BWTS Power
kW/pump
%
kW
%
Energy & Port Cost
$
/kWh
g/kWh
$
/MT
$
/hour
Optional economic value of additional port time. Avoid
double-counting costs already included elsewhere.
$
Ballast Operation Stages
Model several ballast or deballast stages. Each row can use different volume, pump availability, flow, BWTS capacity and power. Stages are treated as sequential for total port-time exposure.
| Stage | Type | Volume m³ | Pumps | Pump Cap. | Util. % | BWTS Cap. | Pump kW | Pump Load % | BWTS kW | BWTS Load % | Setup h |
|---|
Energy & Port Economics
$
/kWh
g/kWh
$
/MT
$
/hour
$
Ballast Operation Results
Single-operation analysis
Enter ballast data
Enter ballast volume, pump capacity and operating assumptions to
estimate pumping time, energy demand and port-cost exposure.
Planning estimate only.
Actual ballast and deballast rates depend on vessel trim, draft,
tank level, pump curves, suction and discharge head, piping losses,
valve configuration, sea-chest condition, stripping arrangements,
gravity flow, simultaneous cargo operations, BWTS operating limits,
filter differential pressure, water quality, salinity, temperature,
UV transmittance, treatment bypass restrictions, port requirements
and approved ballast water management procedures. Electrical power
may not vary directly with transfer rate. Use vessel-specific pump,
BWTS, electrical and operating data for operational decisions.
Generated by ShipUniverse.com
Results copied