Crude-Oil VOC Vapour Recovery, Compressor Capacity & Emissions-Capture ROI Tool
Estimate crude-oil loading vapour generation, normalize vapour flow, screen ship/shore recovery capacity, calculate indicative compressor power, quantify VOC mass captured and test whether the recovery package creates a credible operating and investment case. Safety and approved VECS/VOC-plan limits always control over economics.
Regulatory & Operating Basis
MARPOL Annex VI regulation 15 requires crude-oil tankers to carry and implement an approved ship-specific VOC Management Plan. VECS use is mandatory where the relevant Party has designated a port/terminal for VOC control. Project-specific terminal rules, approved VECS manuals and cargo-tank venting limits remain controlling.
Loading & Vapour Generation
Advanced Cargo / Terminal Register
Compare different crude parcels, loading rates and terminals. Each row estimates normalized vapour flow, VOC mass generation and annual exposure independently.
| Cargo / Terminal | Load m³/h | Growth | Temp °C | Tank barg | VOC vol% | MW | Hours/call | Calls/yr |
|---|