Ship Universe Maritime Tool
Cruise Ship HVAC Energy & Fuel Savings Calculator
Estimate cruise ship HVAC electricity savings, auxiliary-generator fuel avoided, shore-power savings, CO2 reduction, annual operating benefit, payback, NPV and IRR. Advanced mode separates chillers, ventilation fans, pumps and terminal loads while modeling retrofit performance, onboard generation, shore power and full project CAPEX.
HVAC Operating Profile
Use the average electrical load of the cruise ship HVAC plant during the period covered by the analysis.
kW
hours/day
days/year
%
%
% gross saving
Onboard Generator & Shore Power
%
The remaining share is treated as shore-power electricity.
g/kWh
$
/MT
$
/MWh
$
/kWh
kg/kWh
tCO2/MT
$
/tCO2
%
Retrofit Investment
$
$
/year
years
%
%/year
%/year
%/year
%/year
Cruise HVAC Load Profile
Enter average connected HVAC loads at the analyzed operating condition. A common system load factor is applied to estimate annual baseline HVAC energy.
kW
kW
kW
kW
kW
%
hours/day
days/year
HVAC Upgrade Performance
%
%
%
%
%
% gross saving
Generator, Shore Power & Carbon
%
g/kWh
$
/MT
$
/MWh
$
/kWh
kg/kWh
tCO2/MT
$
/tCO2
%
HVAC Retrofit CAPEX
$
$
$
$
$
$
$
$
%
days
$
/day
$
Lifecycle Assumptions
$
/year
year
Enter 0 to exclude a major renewal event.
$
years
%
%/year
%/year
%/year
%/year
$
Cruise HVAC Energy & Fuel Savings Results
Simple HVAC efficiency investment screen
Enter HVAC data
Enter cruise ship HVAC load, operating time, expected
energy reduction, generator assumptions and project cost
to calculate energy savings and ROI.
Planning estimate only.
Actual cruise ship HVAC performance depends on ambient temperature
and humidity, passenger occupancy, fresh-air requirements, cabin
and public-space setpoints, chiller loading, chilled-water and
seawater temperatures, fan and pump curves, heat-recovery systems,
galley and hotel loads, control logic, equipment condition,
itinerary, shore-power use and generator dispatch. Use vessel
trend data, OEM performance curves, engineering studies and
shipyard quotations for investment decisions.
Results copied