SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

15Live Radars 263Maritime Tools
24/7Intelligence Focus
GlobalIndustry Coverage
NEW RADARS

Explore our latest intelligence radars

RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…

Mooring Winch Brake Rendering, Drum Layer & Brake Test Tool

MEG4 • Ship Design MBL • 60% Brake Render • 50/55% WLL • Drum Layers • Hydraulic Jack Test • SOLAS II-1/3-8 • MSMP / LMP

Mooring Winch Brake Rendering, Drum Layer & Brake Test Tool

Screen the mooring winch as the intended weak link. Compare the verified brake setting with the MEG4 Ship Design MBL basis, calculate drum-layer force loss, convert hydraulic jack pressure into brake torque and line pull, and manage periodic or post-maintenance testing across the mooring deck.

Figures represent Currency
↑Need much more depth? Click Advanced above.Advanced adds LDBF hierarchy, hydraulic jack pressure, gauge uncertainty, test-kit geometry, maintenance triggers, multi-winch results, SOLAS/MSMP status and test-campaign cost.
Fast10 primary inputs
Core answerRender target + layer + test status
Weak link60% SDMBL operating target

Single-Winch Quick Screen

Simple uses the MEG4 60% SDMBL first-layer render target. Synthetic WLL is 50% SDMBL; steel-wire WLL is 55%. The periodic test interval is user-entered from the vessel/company MSMP/SMS.

kN.
mm.
mm.
kN from current verified brake test.
±% of the 60% target; vessel/test-procedure criterion.
months.

Strength Hierarchy

kN.
kN.
% SDMBL; 0 uses MEG4 line-type value.
% SDMBL.
±% of target.
kN; 0 unknown.
% SDMBL. Not the operating setpoint.
Keep Ship Design MBL as the brake-setting reference. A stronger replacement line is not a reason to increase brake rendering. For lines replaced under the current safe-mooring framework, the tool screens LDBF alignment at 100-105% of SDMBL.

Drum Geometry & Layer

mm.
mm.

Hydraulic Brake Test Kit

mm.
degrees.
cm².
bar.
bar.
bar; 0 none.
±% reading.

Generic conversion only. The maker/test-kit equation remains controlling if the linkage geometry is different.

Testing & Maintenance Trigger

months.

Deck-Wide Brake Test Register

The same Advanced target/tolerance is used for each row. Winch labels remain local and are excluded from Tool Data.

WinchSDMBL kNDrum mmLine mmLayerLever mmArea cm²AngleMeasured barGauge ±%

Brake Test Campaign Cost

%.
hours.
selected currency/hour.

MSMP / LMP / SIRE Readiness

Screening only: not a maker brake-test procedure, class approval, mooring analysis, winch structural calculation or authorization to adjust the brake. Use the approved MSMP/LMP, maker test kit and vessel procedure. An over-tight brake can defeat weak-link protection; an under-holding brake can render prematurely.
2026 reference basis: OCIMF MEG4 recommends primary brake rendering at 60% of Ship Design MBL on the first layer. MEG4 WLL is 50% SDMBL for synthetic lines and 55% for steel wire. SIRE 2.0 expects periodic testing and records, including testing after maintenance or evidence of premature slippage. The amended SOLAS II-1/3-8 safe-mooring requirements entered into force on 1 January 2024; MSC.1/Circ.1620 inspection/maintenance guidance applies to all ships. MSC.1/Circ.1175/Rev.1 applies to ships constructed from 2024 through 2027 and uses maximum brake holding load not less than 80% SDMBL as part of the winch-support structural design basis. MSC.1/Circ.1175/Rev.2 applies to ships constructed on or after 1 January 2028.
Generated by ShipUniverse.com