Drydock CAPEX, Special Survey Cost & Reserve Planning Tool

Build a vessel drydock budget that separates direct project cash from off-hire economics and reserve funding. Simple mode combines the major cost blocks, contingency, lost vessel contribution and current reserve balance. Advanced mode builds a work-package register, applies timing escalation and scope-risk allowances, schedules pre-dock/dock/post-dock payments, projects the dedicated reserve balance, calculates the monthly contribution required to avoid a funding gap, and estimates the next reserve cycle.

Currency Data
↑
Fast drydock reserve screen: 10 inputs.Simple treats the entered costs as today's budget values. It adds contingency, separates lost earnings from cash CAPEX, and calculates the monthly reserve contribution required before the planned docking.
CAPEXDirect drydock cash budget
EconomicsOff-hire opportunity cost
ReserveMonthly funding requirement

Drydock / Special Survey Snapshot

Million currency units.
Million.
Million.
Million.
% of direct estimated cost.
Drydock + deviation/positioning days.
Currency/day of contribution foregone while off-hire.
Million available for this event.
Million expected to be available before/during the docking.

Project Timing, Escalation & Reserve

Currency/day. Kept separate from cash CAPEX.
%/year from today's estimate to docking date.
% after work-package risk uplift and time escalation.
% of escalated/risk-adjusted scope.
% cost increase on the FX-exposed share.
Million.
Million/month through the docking month.
Million injected in the docking month.
Months before dock for pre-dock split.
Months after dock for closeout split.
Months to next planned drydock/survey event. Enter vessel-specific interval.
%/year applied to this cycle's cash budget.

Drydock / Survey Work-Package Budget

Enter today's budget estimate for each work package. “Scope risk uplift” is a user-entered allowance for uncertainty in that package before the global contingency. Payment splits determine when reserve cash is consumed: pre-dock, during docking, and post-dock closeout. Splits should total 100% for each active row.

UseCategoryWork packageBudget basisToday estimate MScope risk %Pre-dock %At dock %Post-dock %

Technical / Budget Readiness Checks

Budget boundary: this is a technical-budget and reserve-planning model, not a yard quotation, accounting-policy determination or class survey schedule. Final scope, capitalization treatment, survey interval, off-hire, steel renewal, coating extent, yard choice, FX exposure and payment milestones remain vessel- and owner-specific.