Ship-to-Ship Transfer Fender, Mooring, Hose & Transfer Planning Tool
Build a two-vessel STS concept, screen approach energy and manufacturer fender ratings, compare hose and mooring assumptions, and plan staged cargo transfer. Flags identify engineering verification and joint-plan hold points before any operation proceeds.
STS Snapshot
Transfer Stage Register
Volumes must sum to the total cargo volume. Stage-specific flow rates and interruptions form the detailed transfer duration.
| Use | Stage / sequence | Volume m³ | Rate m³/h | Extra hours | Calculated hours | Remove |
|---|
Primary Fender Register
Manufacturer energy and reaction values must refer to the stated deflection and applicable installation conditions. Available fenders are not necessarily all engaged during an approach.
| Use | Position / type | Quantity | Engaged count | Energy each kJ | Reaction each kN | Status | Remove |
|---|
Mooring Line Group Register
Line working fraction and lead-efficiency are explicit screening assumptions, not manufacturer or OCIMF universal operating limits. Full load sharing, pretension, line angles, chafing and dynamic loading are outside this model.
| Use | Line group | Number | MBL / line kN | Lead efficiency (0–1) | Condition | Remove |
|---|
STS Equipment & Operational Readiness Register
Critical failed or unverified checks can block the planning decision independently of equipment-utilization ratios.
| Use | Verification item | Discipline | Critical? | Readiness | Evidence / responsible person | Remove |
|---|