Port State Control Inspection, Deficiency & Detention Risk Tool
Screen the issues most likely to disrupt a PSC visit: deficient safety equipment, missing evidence, poor crew demonstrations, unresolved findings and weak corrective-action control. Compare inspection stations, review likely escalation pathways and produce a shipboard action plan. Results are decision support, not an official PSC selection or detention determination.
Inspection Profile
Visible Inspection Readiness
Vessel & PSC History
Condition controls below are grouped by practical PSC walkdown area. A "Significant gap" is an internal warning, not a legal declaration that the item is detainable.
Deficiency & Corrective Action Register
Record observed and historical deficiencies. The risk uplift applies only to included records not demonstrably closed. "Potential detention concern" requires qualified technical review; it does not assert a PSC detention code.
| Use | Equipment / station | Observed deficiency | Reference / code | Severity judgment | Status | Closure evidence | Days to close | Owner | Review priority |
|---|
Operational Demonstration & Evidence Checks
Test the systems and records that the crew may be asked to demonstrate. A failed or unverified test increases the preparedness indicator; a test marked N/A is excluded.
| Use | Demonstration / evidence | Inspection area | Result | Critical operation | Responsible party |
|---|