Ship Universe Drydock Commercial Planning Tool

Ship Drydock Slot, Off-Hire & Revenue Opportunity Cost Tool

Compare drydock slots on the economics that matter beyond the yard quote. Model waiting, deviation, yard days, commissioning, schedule-delay risk, scope growth, missed fixtures and the revenue contribution sacrificed while the vessel is unavailable. Advanced mode ranks multiple slot options and shows how much premium a faster slot can justify.

Currency selector changes display only. No exchange-rate conversion is performed.

Vessel Commercial Basis

Revenue opportunity cost is separated from cash expenditure so the yard quote does not hide the value of lost trading days.

$ /day
$ /day
Fuel, port and voyage-variable costs not incurred while the ship is unavailable.
$ /day
Shown as outage cash burn, not added to opportunity cost because it normally continues either way.
days from now

Slot A

Preferred / Earlier Slot

days
days
days
days
days
$
$
$
%
days
%
$
%
$
Use only for exposure not already captured by the daily earning model.

Slot B

Later / Lower Quote Slot

days
days
days
days
days
$
$
$
%
days
%
$
%
$

Drydock Slot Candidates

Add as many realistic slots as needed. Start day is calendar lead time, while waiting, deviation, yard and commissioning days are modeled as non-earning days.

Slot Start Day Wait Dev. Yard Comm. Quote Dev. Cost Other Delay % Delay Days Scope % Scope Cost Miss % Miss Value
Economic treatment: gross revenue lost is shown separately from net operating contribution lost. The comparison uses gross daily earnings minus avoidable voyage costs as the opportunity-cost day rate. Continuing fixed OPEX is reported as outage cash burn but is not double-counted in the slot ranking. Scope growth, schedule delay and missed-fixture inputs are probability-weighted expected values.
Enter vessel economics and at least one drydock slot to build the off-hire, slot-risk and revenue-opportunity comparison.
Commercial planning estimate only. Actual drydock economics depend on charterparty terms, off-hire wording, cargo commitments, survey windows, class and flag requirements, yard availability, docking specifications, steel and coating discoveries, contractor productivity, weather, parts, riding squads, deviation routing, bunker prices and post-dock performance. The missed-fixture input should only be used for commercial exposure that is not already represented by the daily earnings model. Continuing OPEX is shown separately to avoid double-counting a cost that normally exists whether the ship is trading or in dock. Confirm slot validity, survey deadlines and commercial consequences with the owner, technical manager, chartering team, class, flag and yard before committing.