Ship Universe Drydock Steel Renewal Tool

Hull Steel Renewal Weight, Plate, Labor & Drydock Cost Estimator

Turn a steel renewal scope into a shipyard-ready budget. Estimate installed tonnes, stock plate procurement, nesting waste, billable tonnage, benchmark man-hours, labor cost, coating and NDT extras, steel-work duration, drydock extension and off-hire exposure. Advanced mode handles multiple renewal locations with different thicknesses, access factors and curvature.

Currency selector changes display only. No exchange-rate conversion is performed.

Steel Renewal Scope

Enter the finished renewal area and structural details. The estimator separates installed weight, purchased stock and yard billable weight.

mm
% of plate wt.
locations
m
×
Use for congestion, difficult fit-up, removals, access or unusually awkward insert geometry.
MH/t
Enter 0 to use the thickness-based benchmark curve.

Plate Procurement & Yard Billing

t/m³
m
m
%
%
%
Use if yard billing dimensions exceed net renewal geometry.
t/location
$ /t purchased
$ /t purchased

Labor & Repair Extras

$ /man-hour
×
% of labor
× plate area
$ /m²
%
$ /m tested
$
$
$
$ /t removed
$ /billable t
Optional tender cross-check only. Enter 0 if not available.

Drydock Schedule & Time Cost

people
shifts/day
hours
%
days
%
$
$ /day
$ /day
$ /day
%

Renewal Item List

Model each plate group separately so thickness, access, curvature, weld length and man-hour basis can vary.

Use Renewal Item Area m² Thk mm Sec. % Locations Weld m Location Curve HT? Complex × Manual MH/t

Shared Plate, Labor & Billing Assumptions

t/m³
m
m
%
%
%
t/location
$ /t purchased
$ /t purchased
$ /man-hour
×
$ /billable t

Repair Extras & Drydock Schedule

% of labor
× plate area
$ /m²
%
$ /m tested
$
$
$
$ /t removed
people
shifts/day
hours
%
days
%
$
$ /day
$ /day
$ /day
%
Benchmark basis: thickness-based labor mode uses a published ship-repair budgeting curve for steel renewals, then applies location, curvature, higher-strength steel and user-entered productivity factors. It is a budget benchmark, not a live yard tariff. The estimator intentionally does not decide whether steel must be renewed. Use approved thickness-measurement, class and repair-scope data for that decision. Ship repair man-hour reference · DNV hull survey planning
Enter steel renewal, labor, plate procurement and drydock assumptions to build the estimate.
Budget and drydock planning estimate only. This tool does not determine class renewal criteria, minimum permissible thickness, local or global hull-girder wastage limits, repair design, steel grade acceptance, weld procedure, NDT scope or survey acceptance. Renewal scope should come from approved thickness measurements, survey findings, class requirements and repair drawings. Benchmark man-hours are intended as a historical budgeting reference and can differ materially by yard, location, quantity, access, weather, staging, production method, steel grade, sequence, shift pattern and contractor productivity. Stock plate availability, commercial plate dimensions, minimum yard billing quantities and tariffs vary by yard and supplier. Advanced line-item plate counts are conservative because they do not optimize nesting across different renewal rows. Use current quotations before committing a project.