MASS Remote Operations Centre Connectivity Resilience Tool
Screen whether a Remote Operations Centre has enough communications capacity and quality for the remotely supported fleet. Simple compares full-fleet demand with primary and backup paths. Advanced adds multiple vessel groups and multiple network paths, then tests normal qualified capacity, immediate failover, restored single-path N-1 capacity and common-mode shared-risk-group outages.
Fast ROC Connectivity Screen
Primary and backup capacity are checked independently against the same concurrent-fleet demand.
ROC Resilience Basis
Remote Vessel Demand Register
Names are excluded from Tool Data. Advanced uses the strictest RTT, packet-loss and safe-state bridge inputs as a conservative fleet-wide gate.
| Vessel / group | Qty | Control Mbps | Video Mbps | Overhead % | Max RTT ms | Max loss % | Bridge sec |
|---|
Connectivity Path Register
Shared-risk groups represent common carrier, gateway, route, ground segment, cloud or power dependencies. Capacity derating is deterministic, not a failure probability.
| Path | Risk group | Capacity Mbps | Derating % | RTT ms | Packet loss % | Normally active | Failover sec |
|---|