Ship repair • man-hours • materials • subcontractors • dock time • schedule • contingency

Ship Repair Cost & Man-Hour Estimator

Build a repair budget from physical scope and labor intensity instead of one lump-sum guess. Simple mode converts steel, piping, coating and other repair labor into a fast man-hour and cost screen. Advanced mode builds the estimate package by package with complexity, access, rework, overtime, materials, subcontractors, equipment, dock/berth cost, schedule capacity and owner economic exposure.

Figures represent
↑Need package-by-package repair pricing and schedule pressure?Advanced adds editable work packages, overtime, complexity/access factors, dock/berth charges, off-hire exposure, schedule capacity, stress cases and scope/labor sensitivity.
LaborEstimated man-hours
BudgetRepair cash cost
ScheduleIndicative duration

Repair Scope

Enter the physical scope you already know. Simple mode applies your own labor-intensity assumptions and keeps non-labor costs in one allowance.

Installed tonnes.
Metres of repaired/renewed piping.
m² of blasting/preparation/coating scope.
Direct labor-hours for other repair work.

Labor & Cost Basis

man-hours / installed tonne.
man-hours / metre.
man-hours / m².
Currency per direct labor-hour.
All non-labor direct costs combined.
Applied to labor plus entered non-labor cost.
↑Advanced repair-package estimateEach work package prices its own labor intensity, complexity, access, rework, labor rate, materials, subcontractors and equipment. Free-text descriptions remain screen/export only and are not sent to Tool Data.

Project Labor & Schedule

Labor intensity should be based on the yard, vessel, access, material, hot-work controls and repair method actually expected. The calculator does not provide universal ship-repair production norms.

% of direct labor-hours.
% premium above base row labor rate.
% of priced direct labor.
Net productive repair hours.
Average productive workers available to this scope.
Calendar/work days on the planning basis selected.

Repair Work Packages

Calculated hours = quantity × MH/unit × complexity × access × (1 + rework). Labor pricing then applies the entered overtime mix. Material is quantity × material/unit.

UseCategoryScope descriptionQtyUnitMH/unitComplexityAccessRework %Rate/hrMaterial/unitSubcontractEquipmentCalc MH

Dock, Yard & Owner Exposure

Applied before contingency.
Deducted after contingency.
Optional owner exposure, kept separate from repair cash cost.

Estimate Readiness Checks

Stress Cases

Stress the estimate without changing the base inputs. Productivity is entered as a percentage of base productivity; below 100% increases labor hours.

UseCaseScope %Labor rate %Material %Dock rate %Productivity %
Estimate statusBASE REPAIR ESTIMATEScope-based planning budget
Repair cash cost$0

Direct labor, non-labor repair scope and contingency.

Man-hours0 h
All-in / MH$0/h
Schedule util.0%
Economic exposure$0
Total labor hours0adjusted repair MH
Labor cost$0direct + indirect
Non-labor direct$0materials + vendor + equipment
Contingency$0estimate allowance
Duration0 dscreening duration
Repair Budget StackCash estimate before optional owner off-hire exposure.
Direct labor$0
Materials$0
Dock / berth$0
Total cash$0
Man-Hour AllocationWhere the repair labor is being consumed.
Largest package-
Largest share0%
Base direct MH0
Adjusted MH0
Schedule Capacity ScreenMan-hours compared with the entered workforce, productive hours and target duration.
Required avg workforce0
Available workforce0
Estimated duration0 d
Target margin0 d
Target capacity
-
Repair Work-Package LedgerAdvanced mode shows package-level hours and direct cost.
PackageQtyMHLaborMaterialSub/VendorEquipmentDirect total
5×5 Scope × Labor Rate SensitivityTotal repair cash cost as physical scope and labor pricing move away from the base case.
Advanced Stress CasesBase scope stays unchanged; each case recalculates cost, man-hours and schedule pressure.
Model boundary: This is a repair-budget and labor-planning screen, not a shipyard quotation, class-approved repair specification or production standard. Labor intensity varies materially with vessel type, yard, country, repair method, access, steel grade, hot-work controls, staging, weather, work-front availability, material lead time, class/flag requirements, testing and emergent work. Use yard/vendor quotations and approved repair specifications when available. Off-hire/economic exposure is shown separately from repair cash cost so commercial impact is not confused with yard expenditure.
By the ShipUniverse Editorial Team — About Us | Contact