Attained EEXI • Required EEXI • EEDI Reference Line • EPL / ShaPoLi Screen • Power & Speed Sensitivity • Compliance Margin

EEXI Calculator for Existing Ships

Estimate attained EEXI, required EEXI and compliance margin under MARPOL Annex VI. Simple mode handles the core conventional-propulsion screen. Advanced adds verified overrides, correction-factor inputs, separate fuels, power-limitation diagnostics, compliance scenarios and a decision board for technical-file review.

Figures represent
↑
Need verified correction factors, separate fuels, EPL/ShaPoLi diagnostics or scenario stress? Click Advanced above.Simple is a conventional-propulsion screening model. Use the ship's approved EEXI Technical File and verifier-confirmed inputs for certification.

Ship & Propulsion Basis

Exactly 10 core inputs. Required EEXI is generated from ship type/size; the selected fuel supplies the IMO-style CO₂ conversion factor used in the screening numerator.

DWT. Used by most EEDI/EEXI reference lines.
GT. Needed for vehicle-carrier coefficient and cruise capacity.
Total kW for propulsion engines included in the screen.
kW. Enter 0 if no EPL/ShaPoLi limit is modeled.
kn at the modeled EEXI reference power basis.
g/kWh. Use approved/verified data where available.
kW used in the screening numerator.
g/kWh.

Ship & Required EEXI

Optional. Leave blank to use the regulatory reference-line screen.
Aggregate verified capacity/correction-factor effect. Keep 1 if not applicable.
gCO₂/h aggregate approved energy-efficiency-technology credit.

Main Propulsion

Auxiliary & Improvement Assumptions

Planning sensitivity only. Not part of the statutory attained-EEXI formula.
% below required EEXI for owner/project planning.

Power / Speed / SFC Stress Register

Each row changes the current modeled main power, Vref and main SFC. This is an engineering sensitivity register, not a substitute for an approved speed-power curve.

UseCase typeMain power Δ %Vref Δ %Main SFC Δ %

EEXI Technical-File Readiness

Certification boundary: this calculator is a screening and planning tool. Official attained EEXI can require approved speed-power treatment, propulsion-system-specific methodology, verified SFC, correction factors, energy-efficiency-technology terms, and an approved EEXI Technical File. Diesel-electric, turbine, hybrid and unusual propulsion arrangements can require methodology not represented by this conventional-propulsion screen.
By the ShipUniverse Editorial Team — About Us | Contact