SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

17Live Radars 295Maritime Tools
24/7Intelligence Focus
GlobalIndustry Coverage
RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…
SHIPUNIVERSE REPORTING

Reports, news and industry coverage

Full analysis in the ShipUniverse intelligence layout.

← Back to latest posts ShipUniverse / NEWS

The 164% Shipyard Problem: Why Thousands of Newbuildings Could Be Heading for a Delivery Crisis

🔔 Subscribe to ShipUniverse Weekly →

The world's busiest shipyards are scheduled to deliver far more vessels in 2028 than their demonstrated production capacity can support. Danish Ship Finance's November 2026 Shipping Market Review, highlighted by Splash247 on November 6, finds that 99 heavily booked yards face delivery commitments equal to 164% of their annual capacity. Across all 277 active yards in the study, the orderbook has expanded from approximately 60 million compensated gross tonnes (CGT) in 2020 to 210 million CGT in September 2026, while construction capacity has increased only 30%. The financier's historical delivery analysis suggests that 10–11 million CGT of scheduled output could slip from each of 2027 and 2028 into later years. That is an illustrative industry-wide volume estimate, not a confirmed count of delayed ships.

ShipUniverse | Newbuilding Market Intelligence

Shipyard Capacity: 100%
Delivery Commitments: 164%

Ninety-nine heavily booked yards face an extraordinary scheduling mismatch in 2028. Other yards still have space, but not necessarily the track record or facilities for the vessels owners want delivered.
2028 DELIVERY PRESSUREDANISH SHIP FINANCE | NOV 2026CGT, NOT DEADWEIGHT TONNES
164%2028 scheduled work versus the 99 busiest yards' capacity
56.4MAnnual CGT capacity across 277 active yards
3.7 yrsGlobal order coverage, up from 1.4 years in 2020
10–11MCGT potentially slipping per year in 2027 and 2028
01 / The capacity mismatch, properly defined

The 99 most heavily booked yards

About 30.2 million CGT of annual capacity versus approximately 49.5 million CGT scheduled in 2028.

Scheduled / demonstrated capacity164%
0Capacity limit164% scheduled

All 277 active yards combined

The worldwide 2028 schedule is 64 million CGT against 56.4 million CGT of estimated annual capacity.

Scheduled / demonstrated capacity~114%
0Capacity limit114% scheduled
Demonstrated annual capacityDelivery commitments exceeding that capacity
THE BOTTLENECK ~19M CGT

Approximate 2028 schedule overload at the 99 highest-performing yards, before allowance for slippage or capacity adjustments.

THE UNUSED ALTERNATIVE ~11M CGT

Estimated spare 2028 capacity at the other 178 active yards. Not all of it can be substituted for specialist LNG, tanker or large container ship berths.

How a shipbuilding boom creates a later supply wave

01 / Ordering surgesOrders outpace new shipyard capacity and lengthen booked production queues
02 / Delivery dates slipSome ships planned for 2027–2028 shift into later years
03 / Temporary scarcity lastsOwners needing replacements may retain older ships or obtain interim tonnage
04 / Supply eventually arrivesAccumulated deliveries may then intensify competition and pressure asset values
How to read 164%: This measures scheduled CGT against estimated annual production capacity at a defined group of yards. It does not mean those shipyards are operating at 164% utilization, that every contracted ship will be delayed, or that the industry has already confirmed thousands of missed delivery dates. All figures are based on Danish Ship Finance's September 2026 dataset.
ShipUniverse | Shipyard Capacity and Vessel Class Exposure

China Is Overbooked.
Japan Still Has Room.
LNG Slots Are Nearly Gone.

A berth in the wrong location or at a yard without the right vessel-building experience does not automatically solve a newbuilding shortage. The most expensive specialist construction slots are among the scarcest.
2028 workload by shipbuilding regionSwipe or use either synchronized scrollbar
Shipbuilding regionAnnual capacity2028 schedule / capacity2021–25 on-time rateCapacity after historical rateWhere the constraint matters
ChinaCAPACITY PRESSURE32.0M CGT140%77%109%Roughly 45 million CGT scheduled for 2028, already beyond demonstrated annual capacity even after applying the region's historical in-year delivery rate.
South KoreaNEAR CAPACITY12.2M CGT107%81%86%Strongly booked specialist yards, especially for gas carriers, with relatively limited near-term flexibility.
JapanAVAILABLE SPACE7.6M CGT47%80%38%More uncommitted capacity, particularly in dry bulk. Suitability, pricing and technical capability differ by ship type.
Rest of worldAVAILABLE SPACE2.6M CGT66%50%33%Smaller aggregate contribution. Availability cannot be assumed interchangeable with major Chinese or Korean specialist berths.
EuropeAVAILABLE SPACE2.0M CGT55%71%39%Specialized construction profile and comparatively modest capacity within this merchant-vessel dataset.
Danish Ship Finance, November 2026, Exhibit 25. Figures use September 2026 schedules and the study's demonstrated capacity methodology. The historical-rate column is an illustrative calculation, not confirmed future output.
Uncommitted delivery slots for 2028Estimated whole vessels, not CGT
LNG carriers13Worldwide new order slots modeled as still available for 2028 delivery.
Versus 412 open Capesize slots by 2031
VLCC tankers13Limited near-term space for very large crude carrier construction.
Versus 92 open Capesize slots in 2028
MR product tankers71More possible near-term production openings than LNG and VLCC.
2028 openings relative to 92 Capesize
Capesize bulkers92Substantially more available construction options for 2028.
Reference scale for the bars above
The opposite problem155 of 277

Active yards are scheduled to deliver their last existing order by the end of 2028. Together they represent only around 20% of the industry's annual capacity, underscoring how uneven the orderbook has become.

A particularly revealing detail9 of 13

Estimated 2028 open VLCC building slots are located in Japan. Six of the 13 open LNG slots are in South Korea and five in Japan, though Japan's LNG delivery record is older.

Three commercial consequences
Shipowners: delayed replacement

A later handover may require extending older vessels' service lives, arranging interim charters or renegotiating forward employment commitments.

Equipment suppliers: uneven demand

Scarce capacity at premium yards can support strong equipment pipelines, while newer or less-established yards may face quality, qualification and integration challenges.

Investors: later asset-price pressure

A delayed delivery wave can postpone fleet expansion but may intensify competition once new ships enter service, particularly in heavily ordered vessel segments.

Do not add the spare-slot counts together as interchangeable production capacity. LNG carriers, VLCCs, tankers and bulk carriers can compete for the same construction infrastructure. The published counts are separate vessel-type capacity tests. They are not guaranteed offers, firm delivery slots, or confirmed availability at named shipyards.
ShipUniverse Interactive Tool / Shipyard Capacity and Fleet Economics

The 2028 Delivery Crunch:
Measure the Bottleneck and the Cost

Switch between an industry-wide shipyard workload scenario and the financial consequences of a delayed newbuilding. Both calculations update immediately as assumptions change.
LOAD A RESEARCH BENCHMARK

Shipyard workload assumptions

World / 2028. Scheduled CGT and annual capacity are from the Danish Ship Finance report. Carryover is a scenario assumption.

64.0M CGT
10M CGT80M CGT
56.4M CGT
10M CGT70M CGT
78%
60%95%
Historical worldwide rate was approximately 78% for 2021–2025. Applying it to a future year or an individual region is illustrative.
10.5M CGT
0M CGT18M CGT
Separate additional output assumed to arrive this year after having been scheduled for an earlier year.
0%
0%30%
Hypothetical additional effective CGT capacity. Expansion may require labor, equipment, infrastructure and qualification.
Modeled annual workload / available capacity 107.1%

Scheduled-year arrivals at the selected historical rate, plus assumed prior-year carryover, divided by available annual capacity.

Modeled delivery workload exceeds capacity
Modeled workload60.4M

CGT to be completed in the selected year, including assumed rollover

Capacity shortfall4.0M

CGT above the selected effective capacity, if positive

Current-year in-year arrivals49.9M

Scheduled volume multiplied by the selected arrival rate

Current schedule not delivered in-year14.1M

Includes delays, cancellations and other timing differences, not all confirmed late ships

Where the 2028 pressure comes from

All bar lengths use a common CGT scale. These quantities have different meanings and must not be added together indiscriminately.

Original annual delivery schedule64.0M
Modeled work including carryover60.4M
Effective annual capacity56.4M
With 78% of the 64 million CGT original 2028 schedule arriving in-year and 10.5 million CGT carried forward from 2027, total modeled deliveries become approximately 60.4 million CGT against 56.4 million CGT of capacity.

Methodology and important limitations

Capacity view: Current-year in-year arrivals = scheduled CGT × selected in-year percentage. Workload = in-year arrivals + assumed prior-year carryover. Effective capacity = demonstrated annual capacity × (1 + expansion %). Capacity shortfall = max(0, workload − effective capacity). Workload above annual capacity measures a scenario mismatch, not a proven number of canceled or delayed vessels.

The historical 78% rate refers to CGT arriving in the year originally scheduled. The remainder includes delays, cancellations and timing differences. The model's carryover input represents additional previously scheduled work assumed to be delivered during the current modeled year. Users must not add it to the unfulfilled current-year schedule as if both are known future deliveries.

Owner view: Forgone contribution = delay days × net daily contribution. Financing carry = newbuilding price × prepaid fraction × annual rate × delay months ÷ 12. Recovered damages = min(delay days, damages day cap) × daily damages rate × recovery percentage. Net exposure = forgone contribution + carrying cost − recovered damages.

Owner results exclude temporary charter replacement, changes in freight rates, vessel depreciation, shipyard insolvency, refinancing effects, contract-specific excusable delays, tax and claims expenses, residual value changes and discounted cash-flow timing. Actual contractual remedies depend on the shipbuilding agreement and applicable law. An industry-level CGT model cannot establish the probability or duration of delay for a particular vessel.

Sources: The capacity presets use Danish Ship Finance's November 2026 Shipping Market Review, with data through September 2026. Preset carryover quantities are illustrative except for the approximately 10–11 million CGT annual slippage scenario discussed in the report. All owner-case presets are hypothetical.

Feedback Welcome

We welcome your feedback, suggestions, corrections, and ideas for enhancements.

Please click here to get in touch
By the ShipUniverse Editorial Team — About Us | Contact


← Browse more ShipUniverse posts
MARITIME DECISION TOOLS

Practical tools for real vessel and commercial decisions

Browse the latest 24 tools or instantly search every published ShipUniverse maritime tool.

24 latest toolsView all 295 →
TOOL

Container Shipping Service Contract, Minimum Volume Commitment, Carrier Allocation & Shortfall Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / OCEAN FREIGHT PROCUREMENT…

Open →
TOOL

Fleet Retrofit CAPEX Prioritization, Fuel Savings, Decarbonization & Capital Allocation Tool

🔔 Subscribe to ShipUniverse Weekly → SHIP UNIVERSE / FLEET CAPITAL…

Open →
TOOL

Port Container Crane Fleet Replacement,Availability & Lifecycle CAPEX ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIP UNIVERSE / TERMINAL ASSET…

Open →
TOOL

Maritime Counterparty Credit, Charter Hire Default, Payment Security & Recovery Exposure Tool

🔔 Subscribe to ShipUniverse Weekly → Charter Risk · Receivables ·…

Open →
TOOL

Cruise Ship Elevator Capacity, Passenger Flow, Outage Risk & Modernization ROI Tool

🔔 Subscribe to ShipUniverse Weekly → Cruise Operations · Hotel Engineering…

Open →
TOOL

Ship Lay-Up, Preservation, Reactivation & Return-to-Service Economics Tool

🔔 Subscribe to ShipUniverse Weekly → Shipowner Strategy · Vessel Preservation…

Open →
TOOL

Maritime Cyber Incident Recovery, OT Downtime, Business Interruption & Restoration Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Maritime Cyber Resilience · Vessel…

Open →
TOOL

Vessel Technical Management Contract Tender, Fleet OPEX, Fees & SLA Comparison Tool

🔔 Subscribe to ShipUniverse Weekly → Ship Management · Fleet OPEX…

Open →
TOOL

Shipbuilding Refund Guarantee, Yard Credit Risk, Progress Payments & Delivery Default Tool

🔔 Subscribe to ShipUniverse Weekly → Shipbuilding Finance · Newbuilding Security…

Open →
TOOL

Port Waste Reception, MARPOL Delivery Notice, Disposal Logistics & Charge Verification Tool

🔔 Subscribe to ShipUniverse Weekly → Port Operations · MARPOL Waste…

Open →
TOOL

Maritime Crew Recruitment, Retention, Manning Agency Fees & Attrition Cost Tool

🔔 Subscribe to ShipUniverse Weekly → ShipUniverse · Fleet Crewing Economics…

Open →
TOOL

Container Rail Intermodal Connection, Terminal Dwell & Train Slot Tool

🔔 Subscribe to ShipUniverse Weekly → Ship-to-Rail · Intermodal Terminal ·…

Open →
TOOL

Bulk Grain Cargo Quality, Fumigation, Hold Readiness & Rejection Exposure Tool

🔔 Subscribe to ShipUniverse Weekly → Cargo quality · Hold inspection…

Open →
TOOL

Marine Equipment OEM Warranty, Service SLA & Repair Claim Tool

🔔 Subscribe to ShipUniverse Weekly → Equipment Reliability · OEM Claims…

Open →
TOOL

Freight Forwarder Shipment Quotation, Buy/Sell Rates, Routing & Margin Tool

🔔 Subscribe to ShipUniverse Weekly → Freight forwarding · NVOCC pricing…

Open →
TOOL

Ro-Ro Vehicle Terminal Yard Capacity, PDI & Vessel Loading Flow Tool

🔔 Subscribe to ShipUniverse Weekly → Vehicle terminals · PCTC &…

Open →
TOOL

Marine Hull & P&I Renewal, Premium Quote, Deductible & Coverage Comparison Tool

🔔 Subscribe to ShipUniverse Weekly → Marine Insurance · Renewal Tender…

Open →
TOOL

Offshore Support Vessel Charter Bid, Utilization & Campaign Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → Offshore commercial operations · PSV…

Open →
TOOL

Marine Repair Tender, Shipyard Bid Comparison & Contract Cost Risk Tool

🔔 Subscribe to ShipUniverse Weekly → Ship Repair Procurement · Yard…

Open →
TOOL

Container Transshipment, Missed Connection, Rollover & Recovery Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Container Liner Networks · Feeder-to-Mother…

Open →
TOOL

Vessel Pre-Purchase Technical Survey, Defect Valuation & Acquisition CAPEX Tool

🔔 Subscribe to ShipUniverse Weekly → Vessel S&P · Technical Due…

Open →
TOOL

Contract of Affreightment, Cargo Nomination, Fleet Allocation & Fulfilment Risk Tool

🔔 Subscribe to ShipUniverse Weekly → Dry Bulk Contracts · Cargo…

Open →
TOOL

Port Pilotage, Tug Dispatch, Berth Window & Marine Services Coordination Tool

🔔 Subscribe to ShipUniverse Weekly → Harbor Operations · Pilotage ·…

Open →
TOOL

Offshore Heavy Lift, Crane Spread, Weather Window & Installation Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Offshore Construction · Heavy Lifts…

Open →