Offshore Heavy Lift, Crane Spread, Weather Window & Installation Cost Tool
Offshore Heavy Lift, Crane Spread, Weather Window & Installation Cost Tool
Compare entered lift loads and crane-chart capacities, schedule indivisible lifts through weather windows, price marine spreads and diagnose the effect of standby days on campaign budgets. Separate engineering and authority holds from commercial estimates.
Offshore Crane & Marine Spread Register
One row per crane or crane-vessel package. The day rate is an incremental contracted asset cost, not the support-vessel rate entered above. Refer to each row by its visible 1-based row number in the lift register. Unverified cranes cannot be scheduled.
| Use | Crane / spread | Available day | Active $/day | Standby $/day | Mobilize + demob $ | Readiness | Remove |
|---|
Lift Packages, Rigging & Load-Chart Screening
Gross hook load = (lifted object + rigging) × user-entered dynamic factor. SWL is the applicable chart capacity at this lift's entered radius; this tool performs no capacity/radius interpolation. Unit cycles must each fit a single uninterrupted eligible day.
| Use | Lift / installation | Crane row # | Units | Object t | Rigging t | DAF input | Radius m | Chart SWL t | Hours/unit | Max Hs m | Max wind kn | Lift plan | Remove |
|---|
Weather & Working Window Register
Weather-day entries are hypothetical or user-entered forecasts. Each selected day supplies a continuous workable-hours budget. If no matching day exists, the scheduler will not assume good weather. Conditions exceeding either the project or lift-specific limits prevent that lift on that day.
| Use | Campaign day | Forecast Hs (m) | Wind (kn) | Continuous hours | Basis | Remove |
|---|
Ancillary Installation & Cost Register
Use for project-specific one-off provisions not included in quoted crane rates or daily support-vessel charges. The cost is included in the budget even when the schedule remains incomplete, and is not itself an approved supplier invoice.
| Use | Cost / service description | Category | Quantity | USD per unit | Status | Remove |
|---|
Activity & Installation Constraint Register
Enter project hold days such as seabed preparation, survey, permits or interface handover. These block all crane operations on the entered day, but do not represent a safety-approved work method.
| Use | Activity / constraint | Day | Action | Notes reference | Remove |
|---|
Engineering, Marine Warranty & Execution Readiness
Critical pending or failed items create an execution hold even if modeled load utilization and economics appear favorable. "Verified" is an entered status, not a certification by this tool.
| Use | Required verification | Discipline | Critical? | Status | Evidence / responsible party | Remove |
|---|