Offshore Support Vessel Charter Bid, Utilization & Campaign Profitability Tool
Offshore Support Vessel Charter Bid, Utilization & Campaign Profitability Tool
Compare charter offers as an owner or operator. Separate working hire, standby and off-hire from mobilisation, crew, fuel, incremental project costs and vessel availability. Test which campaign actually earns the best risk-adjusted contribution.
1 · Fleet Vessel & Availability Register
Daily operating cost excludes separately entered crew cost. Fuel consumption is in tonnes/day; availability is indexed to Day 0, the bid-assessment date. One offer may reference one vessel row.
| Use | Vessel / asset | Type | Ready from day | Available until day | OPEX excl. crew $/day | Crew $/day | Working fuel t/day | Standby fuel t/day | Transit fuel t/day | Capability / readiness | Remove |
|---|
2 · Charter Offer & Commercial Terms
Vessel row is a 1-based reference to the fleet register. Charterer fuel responsibility is captured by reducing the owner-borne fuel share. Mob/demob fees are revenue; mob/demob project expenses are separate owner costs.
| Use | Bid / charter opportunity | Vessel row | Work $/day | Standby $/day | Off-hire $/day | Mob days | Demob days | Mob hire $/day | Demob hire $/day | Mob fee $ | Demob fee $ | Owner mob expenses $ | Owner demob expenses $ | Owner fuel % | Bid term status | Remove |
|---|
3 · Campaign Phase & Utilization Schedule
Phases are sequential for all bids. Work earns working hire; standby earns standby hire; off-hire earns the separately entered off-hire rate (normally zero). Extra downside downtime extends the campaign before demobilisation.
| Use | Campaign task / period | Category | Days | Remove |
|---|
4 · Incremental Project Cost & Recovery Register
Only add costs not already in vessel daily OPEX, crew, fuel or offer mobilisation expenses. Recovery percentage represents an entered reimbursement assumption, not automatic contractual entitlement. Bid 0 applies to every option.
| Use | Project cost | Bid row (0=all) | Basis | Unit cost $ | Recovered % | Remove |
|---|
5 · Charter Award Readiness & Technical Holds
Critical pending checks prevent an offer from being marked award-ready even when modeled economics are attractive. These fields do not replace a signed charter party, DP capability review or certification assessment.
| Use | Commercial / operational check | Bid row (0=all) | Critical? | Review status | Evidence reference | Remove |
|---|