SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

15Live Radars 279Maritime Tools
24/7Intelligence Focus
GlobalIndustry Coverage
NEW · THE LIGHTER SIDE OF SHIPUNIVERSE The Ship Universe FUNZONE is open! Maritime Games · Funnies · Crossword · Pic Puzzles — Your next break starts here.
RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…

Marine Repair Tender, Shipyard Bid Comparison & Contract Cost Risk Tool

Ship Repair Procurement · Yard Selection · Contract Risk · Technical Due Diligence

Marine Repair Tender, Shipyard Bid Comparison & Contract Cost Risk Tool

Normalize competing shipyard offers for scope gaps, labor and docking adders, logistics, anticipated variations and out-of-service time. Identify which apparent low bid remains competitive after unpriced work and contractual exposure are considered.

Interactive bid wallScope-compliance matrixOwner all-in economicsRedelivery risk timelineDownside sensitivityContract award holds
Three-bid rapid comparison · 12 inputsEnter three all-in quoted yard prices, their estimated repair days, and each yard's expected excluded-work allowance. The same opportunity-cost and variation assumptions apply to all bids.
Detailed tender comparisonAdd yards, identify fixed-price scope exclusions, itemize incremental labor, docking, subcontract and delivery costs, then test award readiness and contract clauses. Do not enter the same cost in two registers.
Contract boundary: All allowances, probability factors, delay days and off-hire costs are buyer-entered planning assumptions. A lower modeled cost is not acceptance of a tender, proof of class compliance, or confirmation of binding completion, warranty, price or liquidated-damages terms. Verify the signed scope and contract, shipyard capacity, class/flag approvals and repair methodology independently.

Shipyard Bid & Commercial Rates Register

Quoted base price includes only the tender's stated work. Labor hours × rate, dock days × day fee and subcontract charges are INCREMENTAL, not components already included in the base quote. USD per currency unit converts every priced yard-currency item. Owner logistics and mobilization are in USD.

UseYardQuote localUSD / localLabor h*Labor /h*Dock days*Dock /day*Subcontract*Repair daysRisk daysTransit daysOwner travel $Variation %Bid statusRemove

Scope Compliance, Exclusion & Provisional Work

Included scope adds $0. Excluded/provisional/partial work adds the stated owner-share × scenario probability allowance. Enter 0 with an unpriced exclusion to create a funding hold, not an imaginary zero-cost repair. Added scope days are assumed sequential, an intentionally conservative schedule assumption.

UseWork / excluded itemYardScope treatmentAllowance USDLikelihood %Owner share %Added daysCritical?Remove

Contract Clauses & Cost-Risk Provisions

Model a SPECIFIC owner exposure not already included above. Probability-weighted allowance is added to normalized economics. An unresolved critical clause is an award hold even when its modeled dollar effect is zero. Legal remedies are not inferred.

UseProvision / riskYardReview statusExposure USDLikelihood %Critical?Remove

Technical Due Diligence & Award Readiness

Technical feasibility, repair work method, yard capacity, liability wording, subcontracts, insurance and class/flag interfaces must be verified separately. Evidence references stay local and in user exports; no free-text notes or yard names are sent to Tool Data.

UseApproval / evidenceYardCritical?StatusReference (local only)Remove