SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

17Live Radars 283Maritime Tools
24/7Intelligence Focus
GlobalIndustry Coverage
RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…
SHIPUNIVERSE REPORTING

Reports, news and industry coverage

Full analysis in the ShipUniverse intelligence layout.

← Back to latest posts ShipUniverse / NAVAL

From Reactor Fuel to Electronic Warfare: What Truman Gets for $6.8 Billion

🔔 Subscribe to ShipUniverse Weekly →

ShipUniverse Naval Decision Report

Billions: What Exactly Does the Navy Get?

USS Harry S. Truman is entering the one overhaul that determines whether it serves roughly 25 years or more than 50.

Five billion dollars sounds like the price of another warship. On a Nimitz-class carrier, it is the price of taking a 101,000-ton nuclear airfield apart deeply enough to prepare it for another quarter-century at sea. USS Harry S. Truman will have its reactors refueled, propulsion plant rebuilt and modernized, hull and underwater machinery repaired, communications and combat systems replaced, electronic warfare and self-defense systems upgraded, and thousands of compartments, tanks and ship systems inspected or renewed. The headline shipyard contract is $5.1 billion. The Navy's broader budget estimate is closer to $6.8 billion. When the work ends in 2031, the objective is not to return the same carrier. It is to return a 1998 hull able to fight into the late 2040s and beyond.

$5.10B HII execution contract awarded for Truman's RCOH
$6.81B Navy FY2026 total ship estimate for the CVN-75 overhaul
25+ yrs Second-half service life the overhaul is intended to enable
Nov. 2031 Current Navy target for completion and fleet return
Start with the accounting

The $5.1 billion headline is not the whole bill

Execution contract
$5.100B
HII Newport News contract awarded September 29, 2026.
With options
$5.183B
Maximum cumulative value if currently identified options are exercised.
Advanced planning
Up to $913M
Earlier HII planning contract covering design, material, fabrication and inspections.
Navy total estimate
$6.810B
Broader ship-cost estimate including government-furnished systems and other categories.
Do not simply add the $913 million planning contract to the $5.1 billion execution award and call that the final price. Navy ship-cost estimates account for planning, government-furnished equipment and funding across multiple years on a broader basis.
Where $6.81 billion goes

The largest bill is still the physical rebuild

Basic construction / conversion $4.736B · 69.6%
Propulsion equipment $691.9M · 10.2%
Electronics $476.9M · 7.0%
Ordnance $456.8M · 6.7%
Hull, mechanical & electrical $198.6M · 2.9%
Other costs $172.5M · 2.5%
Planning $77.0M · 1.1%

FY2026 Navy Shipbuilding and Conversion budget estimate for CVN-75. Percentages are calculated from the $6.809632 billion total ship estimate.

The nuclear job

The overhaul starts with the reason the ship can serve another 25 years

Reactor plant
Defuel + refuel
Truman's nuclear propulsion plant is opened, old fuel is removed and the reactors are refueled for the second half of ship life.
Steam plant
Deep overhaul
Major propulsion components, piping, valves and supporting machinery receive inspection, overhaul, repair or replacement.
Propulsion equipment
$691.9M
The Navy's current budget estimate specifically assigns nearly $700 million to propulsion equipment.

This is not normal carrier maintenance

The nuclear refueling happens only once during a Nimitz-class carrier's expected service life.

Without it, the ship does not simply operate at reduced capability. It cannot remain in service for the second half of the roughly 50-year design life.

Below the waterline

The shipyard rebuild reaches the machinery that actually moves 101,000 tons

Propellers
Repair
HII specifically identifies propeller work in Truman's RCOH package.
Shafting
Inspect + repair
The propulsion shafts receive work while the carrier is accessible in the shipyard.
Rudders
Repair
Steering machinery and underwater surfaces are part of the dry-dock scope.
Sea chests
Overhaul
Critical seawater intake infrastructure is inspected and repaired.
Hull
Blast + paint
Hull and freeboard preservation restores corrosion protection across the massive structure.
Tanks + spaces
Thousands
The RCOH reaches deeply into compartments, tanks and distributed ship systems.
The electronic rebuild

A 1998 carrier gets a 2030s combat-system baseline

System area CVN-75 RCOH budget baseline What changes operationally
Command + communications C4ISR and ICAN / DDCN / IVCN Modern digital communications, data distribution and command-network infrastructure.
Ship self defense SSDS Mk 2 Mod 1E Updates the carrier's integrated detect, track and engagement architecture.
Electronic warfare SEWIP Block III Adds modern electronic detection and active electronic-attack capability.
Cooperative engagement AN/USG-2B CEC Allows the carrier to participate in a distributed sensor and engagement network.
Surface search AN/SPS-73 NGSSR Modernizes surface-search and navigation detection capability.
Air traffic control AN/SPN-50(V)1 Updates carrier aviation air-traffic-control radar infrastructure.
Landing support AN/SPN-46 overhaul / upgrade + SSLS Modernizes aircraft approach and landing support systems.
Combat direction CDC / Flag ripout and installation Rebuilds spaces and systems used to command the carrier and wider strike group.
Undersea warfare AN/SQQ-34C Carrier Tactical Support Center Updates the carrier's contribution to ASW and undersea situational awareness.
The carrier also gets harder to attack

Self-defense systems are part of the recapitalization

RAM
Missile defense
Rolling Airframe Missile launcher work is included in the Navy's CVN-75 systems baseline.
CIWS
Block 1B
Close-in gun defense remains part of the carrier's terminal protection layer.
Mk 38
Mod 3
Modern remotely operated gun capability improves close-range surface defense.
The carrier's escorts still provide most of the strike group's high-end air and missile defense. RCOH nevertheless ensures the carrier's own local-defense systems are not frozen at a 1990s technology baseline.
The cost comparison

Rebuild the existing carrier or buy another one?

Truman RCOH

Capital estimate ~$6.81 billion total ship estimate
Life gained Approximately 25+ additional years
Simple capital / added year ~$272 million
Hull Existing Nimitz-class design
Major advantage Preserves an already-built 101,000-ton carrier
VS

New Ford-class carrier

CVN-81 estimate ~$15.2 billion by expected delivery
Design life Approximately 50 years
Simple capital / design year ~$304 million
Architecture EMALS, AAG, newer electrical plant and reduced manning
Major advantage New hull with larger growth margins and newer technology

Truman's overhaul is about 45% of the current CVN-81 cost estimate

That does not mean a refurbished Nimitz is 45 percent of a Ford carrier. The Ford class offers newer propulsion, electrical generation, EMALS, Advanced Arresting Gear, greater sortie potential, larger future growth margins and lower intended life-cycle manpower burden.

But replacing Truman rather than refueling it would require funding an entirely new nuclear carrier while losing an existing hull decades before its potential service life is exhausted.

The historical decision

The Navy almost chose retirement instead

1998
USS Harry S. Truman is delivered to the Navy.
2019
The FY2020 proposal calls for cancelling Truman's future RCOH, retiring the carrier around FY2024 and deactivating one carrier air wing.
April 2019
The administration withdraws the retirement proposal and restores the plan to refuel and retain the carrier.
January 2024
HII receives an advanced-planning contract with potential value up to $913 million.
2025
Truman completes a high-tempo combat deployment and sustains collision damage that the Navy later schedules for complete repair during RCOH.
September 29, 2026
The Navy awards the $5.1 billion execution contract.
September 30, 2026
Truman arrives at Newport News Shipbuilding and begins the shipyard phase.
November 2031
Current Navy target for completion and return to the operational fleet.
Five years without the carrier

The schedule is part of the price

A carrier in RCOH may still exist on the Navy's books, but it is not available for normal deployment. That makes schedule slip strategically expensive even before additional shipyard costs are counted.

Older GAO planning model
45.5 mo
Historical notional RCOH duration shown in GAO's carrier maintenance model.
George Washington
69 mo
Extended RCOH completed in 2023 after pandemic, supply and workforce disruption.
Stennis
+14 mo
Its overhaul schedule was extended by roughly fourteen months from an earlier plan.
Truman current plan
~62 mo
Approximately September 2026 through November 2031.
The new Truman contract uses a Fixed Ceiling Incentive structure specifically intended to share risk and reward schedule performance. The Navy says lessons from previous RCOHs influenced the contract.
Why the contract number jumped

Do not compare $2.8B, $3B and $5.1B as if they are complete carrier costs

Carrier Execution contract announced Known outcome / current estimate What the comparison teaches
USS George Washington $2.8B in 2017 69-month RCOH The original shipyard award was not the only program cost incurred over a long availability.
USS John C. Stennis ~$2.9B to $3.0B in 2021 FY2026 total ship estimate ~ $7.19B Cost growth, government-furnished equipment and completion funding make the total much larger than the original execution contract.
USS Harry S. Truman $5.10B in 2026 FY2026 total ship estimate ~ $6.81B The execution contract itself now captures a larger share of the expected work and uses a different incentive structure.

The surprising number is Stennis

The Navy's FY2026 ship-cost table estimates the total CVN-74 RCOH at roughly $7.19 billion, even though its original HII execution contract was announced at around $3 billion.

That is why Truman's $5.1 billion award should not automatically be described as a 70-plus-percent increase in the cost of refueling a carrier. Contract structures, government-furnished equipment, schedule growth and allocation of work differ.

The labor reality

The Navy rebuilt its cost model before Truman arrived

21.7

Million hours in the old planning model

Earlier Navy cost models used approximately 21.7 million labor hours for a notional RCOH execution.

26.5

Million hours in actual recent experience

The Navy's FY2025 budget said actual invoices from CVN-71 through CVN-73 averaged roughly 26.5 million hours.

+22%

The planning assumption had been too low

The difference helps explain why later budgets and contract structures have had to acknowledge a larger labor requirement.

A different approach to the crew

The Navy is trying not to spend a million sailor-hours painting the shipyard

Beginning with Truman, the Navy is shifting more non-rate-specific RCOH work to commercial contracts rather than using assigned sailors for tasks such as painting, insulation, transportation and general maintenance support.

Potential sailor time returned
Up to 1M hrs
Navy estimate for time that can potentially return to training and rate-specific work.
Why
Readiness
Carrier sailors remain assigned for years while the ship itself is industrially unavailable.
New support facility
80K sq ft
The new Carrier Refueling Overhaul Workcenter opened beside the RCOH dry dock in 2026.
Objective
Quality of service
Lessons from previous long RCOHs changed how the Navy supports the crew ashore.
The 2025 collision

Truman also enters RCOH with unfinished combat-deployment damage

In February 2025, Truman collided with merchant vessel Besiktas-M near Port Said. The carrier remained mission capable and resumed operations after emergent repairs.

The Navy later said complete repair of the collision damage would be carried out during the upcoming RCOH.

That work is real, but it should not be presented as the reason Truman's RCOH costs billions. The overwhelming cost driver is the once-in-a-lifetime nuclear refueling and deep recapitalization of an entire aircraft carrier.
What comes out in 2031?

The same hull, but not the same combat system

Power plant

Second-half nuclear life

Refueled reactors and overhauled propulsion equipment restore the machinery base needed for another quarter-century of operations.

Hull

Material condition reset

Corrosion treatment, tanks, underwater machinery, steering components and distributed HM&E systems receive a deep reset.

Networks

Modern C4ISR architecture

Communications, data distribution and combat-system infrastructure move much closer to the standards of the fleet operating in the 2030s.

Defense

Newer electronic warfare and self-defense

SEWIP, RAM, CIWS, SSDS and Cooperative Engagement Capability improve the carrier's ability to detect, share and respond to threats.

Aviation

Updated control and landing systems

Modernized air-traffic-control and landing-support systems allow the ship to support a carrier air wing far newer than the one it operated in 1998.

Command

Rebuilt combat and flag spaces

The carrier remains not only an airfield but a command node for the entire carrier strike group.

The output is a hybrid of two eras

The hull, steam catapults and fundamental Nimitz architecture remain.

The reactors, machinery, networks, sensors, electronic warfare and combat-management systems are refreshed around them.

That is the central logic of RCOH: keep the enormously expensive nuclear hull and replace enough of everything inside it that the Navy can keep treating it as a front-line carrier.

What the Navy is really buying

Twenty-five years of carrier force structure

1

One nuclear carrier hull retained

The alternative to RCOH is not operating the same ship without modernization. Eventually it is retirement.

2

One carrier air wing's sea base retained

Keeping Truman preserves another deck from which fighters, airborne early warning aircraft, helicopters and future unmanned aircraft can operate.

3

Industrial knowledge retained

Newport News remains the only shipyard capable of performing nuclear aircraft-carrier RCOH work.

4

Replacement construction deferred

Retaining Truman lets Ford-class construction replace older Nimitz carriers in sequence rather than filling an early hole created by CVN-75 retirement.

Interactive model

Carrier RCOH Economics + Schedule Stress Test

Compare the cost of extending a Nimitz-class carrier with the capital cost of a new carrier, then test how schedule slip changes the economics. Delay cost is deliberately user-adjustable because there is no single public monthly cost applicable to every RCOH delay.

$272M RCOH capital per added service year
$304M New carrier capital per design-life year
44.8% RCOH cost as percentage of new carrier
$8.39B Simple capital difference
$6.81B RCOH cost including modeled slip
62 mo Modeled time unavailable in RCOH
At the current assumptions, the RCOH costs less than half the procurement price of the comparison carrier and buys approximately another quarter-century from an existing nuclear carrier hull.
The default RCOH estimate is the Navy FY2026 total ship estimate of approximately $6.81 billion for CVN-75. The comparison new-carrier cost defaults to the Navy's roughly $15.2 billion estimate for CVN-81 cited by CBO. Cost per service year divides capital cost by modeled service life only and excludes operations, maintenance, air wing costs, future depot maintenance, financing, inflation and capability differences. The schedule-slip cost is entirely user supplied and is not presented as a Navy estimate.

Research base

RCOH contract: U.S. Navy PAE Maritime and HII, September 29–30, 2026.
Total cost estimate: Department of the Navy FY2026 Shipbuilding and Conversion budget, CVN Refueling Overhauls.
Cost categories: Navy PB2026 CVN-75 Ship Cost Analysis.
Combat-system baseline: Navy PB2026 CVN-75 RCOH P-40 and P-8a exhibits.
Physical shipyard work: HII Newport News, Truman arrival and RCOH start announcement.
Maintenance model: GAO aircraft-carrier maintenance-cycle analysis.
George Washington: Navy and HII RCOH completion and contract history.
John C. Stennis: Navy, HII and FY2025/FY2026 budget documentation covering schedule and cost growth.
Labor-hours baseline: Navy FY2025 CVN RCOH budget justification.
Truman quality-of-service changes: NAVSEA and Navy Quality of Service Cross-Functional Team, June 2026.
2025 collision: U.S. Navy Truman investigation and repair documentation.
Ford comparison: Congressional Budget Office 2026 carrier procurement analysis.
2019 retirement proposal: Congressional Research Service aircraft-carrier program history.
Feedback Welcome

We welcome your feedback, suggestions, corrections, and ideas for enhancements.

Please click here to get in touch
By the ShipUniverse Editorial Team — About Us | Contact


← Browse more ShipUniverse posts
MARITIME DECISION TOOLS

Practical tools for real vessel and commercial decisions

Browse the latest 24 tools or instantly search every published ShipUniverse maritime tool.

24 latest toolsView all 283 →
TOOL

Bulk Grain Cargo Quality, Fumigation, Hold Readiness & Rejection Exposure Tool

🔔 Subscribe to ShipUniverse Weekly → Cargo quality · Hold inspection…

Open →
TOOL

Marine Equipment OEM Warranty, Service SLA & Repair Claim Tool

🔔 Subscribe to ShipUniverse Weekly → Equipment Reliability · OEM Claims…

Open →
TOOL

Freight Forwarder Shipment Quotation, Buy/Sell Rates, Routing & Margin Tool

🔔 Subscribe to ShipUniverse Weekly → Freight forwarding · NVOCC pricing…

Open →
TOOL

Ro-Ro Vehicle Terminal Yard Capacity, PDI & Vessel Loading Flow Tool

🔔 Subscribe to ShipUniverse Weekly → Vehicle terminals · PCTC &…

Open →
TOOL

Marine Hull & P&I Renewal, Premium Quote, Deductible & Coverage Comparison Tool

🔔 Subscribe to ShipUniverse Weekly → Marine Insurance · Renewal Tender…

Open →
TOOL

Offshore Support Vessel Charter Bid, Utilization & Campaign Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → Offshore commercial operations · PSV…

Open →
TOOL

Marine Repair Tender, Shipyard Bid Comparison & Contract Cost Risk Tool

🔔 Subscribe to ShipUniverse Weekly → Ship Repair Procurement · Yard…

Open →
TOOL

Container Transshipment, Missed Connection, Rollover & Recovery Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Container Liner Networks · Feeder-to-Mother…

Open →
TOOL

Vessel Pre-Purchase Technical Survey, Defect Valuation & Acquisition CAPEX Tool

🔔 Subscribe to ShipUniverse Weekly → Vessel S&P · Technical Due…

Open →
TOOL

Contract of Affreightment, Cargo Nomination, Fleet Allocation & Fulfilment Risk Tool

🔔 Subscribe to ShipUniverse Weekly → Dry Bulk Contracts · Cargo…

Open →
TOOL

Port Pilotage, Tug Dispatch, Berth Window & Marine Services Coordination Tool

🔔 Subscribe to ShipUniverse Weekly → Harbor Operations · Pilotage ·…

Open →
TOOL

Offshore Heavy Lift, Crane Spread, Weather Window & Installation Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Offshore Construction · Heavy Lifts…

Open →
TOOL

Cruise Embarkation, Terminal Security, Gangway Queue & Passenger Processing Tool

🔔 Subscribe to ShipUniverse Weekly → Cruise Operations · Terminal Security…

Open →
TOOL

Dangerous Goods Declaration, Booking Acceptance & Documentation Readiness Tool

🔔 Subscribe to ShipUniverse Weekly → IMDG Documentation · Dangerous Goods…

Open →
TOOL

Marine Salvage, Wreck Removal, Pollution Response & Casualty Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Marine Casualty · Emergency Salvage…

Open →
TOOL

Ferry Route Capacity, Timetable Reliability & Passenger Revenue Tool

🔔 Subscribe to ShipUniverse Weekly → Ferry Networks · Route Planning…

Open →
TOOL

Inland Barge Tow, Lock Delay, Fleet Utilization & Voyage Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → Inland Navigation • Towboat Economics…

Open →
TOOL

Marine Bunker Procurement, Supplier Quote Comparison & Delivered Fuel Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Bunker Procurement • Fuel Grades…

Open →
TOOL

Reefer Cargo Temperature Excursion, Cold Chain & Cargo Claim Exposure Tool

🔔 Subscribe to ShipUniverse Weekly → Reefer Cargo • Temperature Evidence…

Open →
TOOL

Electronic Bill of Lading, Cargo Release & Documentation Discrepancy Tool

🔔 Subscribe to ShipUniverse Weekly → Container Shipping • Digital Trade…

Open →
TOOL

Crew Change, Relief Logistics, Port Coordination & Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Fleet Crewing • Seafarer Repatriation…

Open →
TOOL

Marine Insurance Hull, P&I, Deductible & Claim Reserve Tool

🔔 Subscribe to ShipUniverse Weekly → Marine Claims • Hull &…

Open →
TOOL

Shipbuilding Milestone, Change Order, Yard Delay & Payment Exposure Tool

🔔 Subscribe to ShipUniverse Weekly → Newbuilding Contract Control • Yard…

Open →
TOOL

Project Cargo Sea Fastening, Deck Load & Transport Planning Tool

🔔 Subscribe to ShipUniverse Weekly → Project Cargo • Deck Strength…

Open →