Project Cargo Sea Fastening, Deck Load & Transport Planning Tool
Project Cargo Sea Fastening, Deck Load & Transport Planning Tool
Screen cargo footprint, supporting reactions and directional securing demand, then prepare a multi-piece deck arrangement with traceable hold points and a transport-readiness report. The model does not approve structural strength, stability, voyage accelerations or lashing arrangements.
Single Cargo Package
Deck Zones & Allowable Strength
Define positions in metres from the aft-port datum. Deck zone UDL is not a substitute for grillage and point-load approval.
| Use | Zone ID | X m | Y m | Length m | Width m | UDL t/m² | Support reaction limit kN | Zone aggregate limit t | Verified? | Remove |
|---|
Cargo Pieces & Placement
Position each item within its selected deck zone. X and Y are lower-left corners of each footprint, not the center of gravity.
| Use | Cargo ID | Zone | Mass t | Length m | Width m | X m | Y m | CG height m | Bearing area m² | Approval | Remove |
|---|
Grillage / Supporting Points
Enter fractional reaction shares adding to 100% per active cargo. Support limit is checked against both this row and the zone limit. Eccentricity, grillage bending and local plating are not analyzed.
| Use | Support | Cargo ID | Reaction share % | Contact area m² | Rated reaction kN | Documented? | Remove |
|---|
Directional Lashings & Sea Fastening
Separate +X, −X, +Y, −Y groups. Nominal model resistance = count × entered MSL × cos(vertical angle) × lead-alignment factor. This omits moment distribution, pre-tension, weld/foundation verification and other Annex 13 requirements.
| Use | Group | Cargo ID | Direction | Count | MSL kN each | Angle to deck ° | Lead factor (0–1) | Capacity verified? | Remove |
|---|
Load-out, Fastening & Departure Sequence
Planning dates are elapsed days from mobilization; this chart does not resolve crane lift radius, deck strength during load-out or permit interfaces.
| Use | Operation | Phase | Start day | Duration days | Completed? | Remove |
|---|
Documentation, Survey & Operational Holds
Critical unverified checks remain hold points independently of calculated utilization.
| Use | Verification item | Critical? | Status | Evidence reference | Owner | Remove |
|---|