SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

15Live Radars 272Maritime Tools
24/7Intelligence Focus
GlobalIndustry Coverage
NEW · THE LIGHTER SIDE OF SHIPUNIVERSE The Ship Universe FUNZONE is open! Maritime Games · Funnies · Crossword · Pic Puzzles — Your next break starts here.
RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…

Marine Bunker Procurement, Supplier Quote Comparison & Delivered Fuel Cost Tool

Bunker Procurement • Fuel Grades • Supplier Offers • Port Deviation • Commercial Risk

Marine Bunker Procurement, Supplier Quote Comparison & Delivered Fuel Cost Tool

Compare competing bunker stems on landed economics, not headline dollars per tonne. Calculate voyage deviation, waiting, fees, payment terms and qualification holds, then select an offer for a full cost bridge and documentation review.

Two-quote Simple screenMulti-grade supplier tendersComplete delivered-cost bridgeSupply / quality hold pointsCSV and genuine PDF
Fast commercial comparison: 12 inputsTwo quotes for the same fuel grade and quantity. Delivery fee includes supplier charges. Distance is additional round-trip sailing. Credit has a transparent time-value assumption, not guaranteed savings.
Full purchase tender & delivery readinessDefine required fuels, quote lines and supporting fees. Each supplier bid must cover every required grade. Enter FX explicitly; no exchange rates or live bunker prices are fetched.

1. Vessel Fuel Requirements

Demand is the quantity intended for purchase. Tank headroom and grade acceptance are vessel-entered screening values. Quote comparisons require grade-by-grade coverage.

UseRequired fuel gradeDemand mtAvailable tank space mtEngine acceptanceRemove

2. Supplier Fuel Quote Lines

Repeat a bid code for each fuel grade supplied by the same complete offer. FX is USD per one quoted currency unit. Enter manually confirmed quote validity in days; expiry is compared with the planned award lead time. No live quote is fetched.

UseBid codeSupplier / portGradeAvailable mtPrice / mtCurrencyUSD / currencyFuel quality evidenceRemove

3. Commercial Fees and Port Charges

All entries are per complete bid, not per grade. Examples: barging, port dues, surveyor, broker, delivery minimum or mandatory extras. Include taxes explicitly as a fee when applicable.

UseBid codeFee itemAmountCurrencyUSD / currencyRemove

4. Delivery & Voyage Availability

One enabled delivery record per bid. Distance is additional round-trip deviation. Delivery and bunkering duration are additive estimates; the calculator does not simulate concurrent port cargo work.

UseBid codeDeviation nmWaiting hPumping hCredit daysTime slotSupplier availabilityQuote valid (days)Remove

5. Due Diligence & Delivery Controls

Critical unresolved checks are independent commercial holds. Include supply chain, sanctions, sampling, custody measurement, BDN/eBDN, terminal acceptance, fuel compatibility and payment instructions.

UseBid codeVerification / approvalCritical?StatusRemove
By the ShipUniverse Editorial Team — About Us | Contact