SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

17Live Radars 286Maritime Tools
24/7Intelligence Focus
GlobalIndustry Coverage
RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…
SHIPUNIVERSE REPORTING

Reports, news and industry coverage

Full analysis in the ShipUniverse intelligence layout.

← Back to latest posts ShipUniverse / NEWS

Alpha Gas returns to LNG newbuilds as 2029 delivery slots sell

🔔 Subscribe to ShipUniverse Weekly →

Alpha Gas has placed an order for two LNG carriers at Hanwha Ocean’s Okpo yard under a contract disclosed at about KRW 738.3bn (roughly $500m), with deliveries scheduled for 2029. The order was announced by the shipbuilder, with trade reporting identifying Alpha Gas as the buyer.

Click here for 30 second summary

Alpha Gas LNG order in one read

Hanwha Ocean disclosed a contract valued at about KRW 738.3bn (around $500m) to build two LNG carriers at its Okpo yard in Geoje. Industry reporting identified Alpha Gas as the buyer, with delivery scheduled for 2029 and reporting noting “latest energy-efficient technologies.”

  • Disclosed value and yard
    Two LNG carriers, disclosed contract value in KRW, build at Hanwha Ocean’s Okpo facility.
  • Delivery window
    Delivery scheduled in 2029, with multiple reports pointing to a late-June 2029 target.
  • Specification note
    Reporting indicates the ships will be fitted with the latest energy-efficient technologies.
Bottom Line Impact
This order adds two more LNG carriers into the post-2028 delivery pipeline and reinforces that owners are still committing capital to LNG tonnage at current yard pricing.
LNG newbuild pipeline adds two more 2029 deliveries at Hanwha Ocean
Development Update Operational friction Commercial read-through
Two-ship LNG carrier contract confirmed Hanwha Ocean disclosed a contract worth about KRW 738.3bn (roughly $500m) to build two LNG carriers at its Okpo yard, with trade reporting identifying Alpha Gas as the buyer and Alpha Gas confirming the deal. For operators, this is not immediate scheduling friction. The friction shows up later as a larger future fleet base competing for long-haul LNG employment once deliveries arrive. It reinforces that owners are still signing large capex checks for LNG tonnage, which supports yard pricing and keeps forward supply visibility building out.
Delivery window locked into 2029 Both LNG carriers are due for delivery in 2029. Post-2028 delivery timing matters for planning because it shapes forward availability for multi-year charters, portfolio renewals, and project-linked shipping needs. Signals confidence that the buyer expects demand and contract coverage to exist in the 2029 window, not just in the current spot cycle.
Yard pricing benchmark stays firm The disclosed contract value works out to roughly $250m per ship at headline level, a useful marker for what it costs to secure top-tier LNG construction slots. Higher replacement cost raises the breakeven hurdle for speculative ordering and pushes more owners toward longer tenor charter cover or project alignment before committing. Supports asset values for modern LNG carriers by anchoring replacement cost at a high level, which can influence sale and purchase expectations and charter rate discussions.
Energy-efficiency narrative continues Hanwha Ocean indicated the LNGCs will be fitted with the latest energy-efficient technologies. Efficiency upgrades translate into tighter technical spec expectations in tenders, with charterers more likely to compare fuel use, emissions profile, and reliability, not just dayrate. Raises the bar for older tonnage in competitive fixtures where charterers can choose between legacy ships and new spec, especially for longer-term deals.
Forward pipeline signal is the real headline This order adds visible volume to the post-2028 LNG shipping pipeline at a time when the market is still debating longer-term LNG demand growth and ton-mile routes. Owners and commercial teams should expect more scrutiny on delivery timing and optionality, because the pipeline shapes future bargaining power between charterers and shipowners. Each new order reduces uncertainty about future vessel supply and nudges market participants to price forward charter structures with more explicit supply assumptions.
Alpha Gas locks two LNG carrier slots at Hanwha Ocean for 2029 delivery
Hanwha Ocean disclosed a contract valued at KRW 738.3bn (about $500m) to build two LNG carriers at its Okpo yard in Geoje, with industry reporting identifying Alpha Gas as the buyer and delivery scheduled in 2029.
2 x LNG carriers Hanwha Ocean (Okpo, Geoje) KRW 738.3bn disclosed value Delivery window: 2029 Energy efficiency referenced
Deal card
  • Builder disclosure: contract for two LNG carriers, value disclosed in KRW.
  • Build location: Okpo yard, Geoje (Hanwha Ocean disclosure and follow-on reporting).
  • Delivery: 2029 (multiple reports place delivery by late June 2029).
  • Design note: “latest energy-efficient technologies” referenced in reporting.
Regulatory filingContract value
Hanwha Ocean disclosed the contract value and counterparty region, without naming the buyer.
Industry confirmationBuyer identified
Trade reporting and company communications linked the order to Alpha Gas.
Supply Marker
The order’s practical signal is the delivery window: it adds incremental LNG tonnage into the post-2028 pipeline at a time when yard slots and replacement-cost math matter.
Cost lensHeadline math
Disclosed value implies roughly $250m per ship at the headline level (before any financing or contract-specific adjustments).
Spec lensTender posture
“Energy-efficient” positioning tends to support higher technical expectations in LNG tenders as newer tonnage becomes available.

Interactive: Delivery window and cost split (planning aid)

Uses the disclosed contract value and a configurable ship count to show per-ship cost and months to a target delivery date. Default delivery date is set to June 29, 2029 based on reporting.

Per-ship + time-to-delivery
Per ship: – Months to target: – Days to target: –
Adjust inputs and click Calculate.
By the ShipUniverse Editorial Team — About Us | Contact


← Browse more ShipUniverse posts
MARITIME DECISION TOOLS

Practical tools for real vessel and commercial decisions

Browse the latest 24 tools or instantly search every published ShipUniverse maritime tool.

24 latest toolsView all 286 →
TOOL

Port Waste Reception, MARPOL Delivery Notice, Disposal Logistics & Charge Verification Tool

🔔 Subscribe to ShipUniverse Weekly → Port Operations · MARPOL Waste…

Open →
TOOL

Maritime Crew Recruitment, Retention, Manning Agency Fees & Attrition Cost Tool

🔔 Subscribe to ShipUniverse Weekly → ShipUniverse · Fleet Crewing Economics…

Open →
TOOL

Container Rail Intermodal Connection, Terminal Dwell & Train Slot Tool

🔔 Subscribe to ShipUniverse Weekly → Ship-to-Rail · Intermodal Terminal ·…

Open →
TOOL

Bulk Grain Cargo Quality, Fumigation, Hold Readiness & Rejection Exposure Tool

🔔 Subscribe to ShipUniverse Weekly → Cargo quality · Hold inspection…

Open →
TOOL

Marine Equipment OEM Warranty, Service SLA & Repair Claim Tool

🔔 Subscribe to ShipUniverse Weekly → Equipment Reliability · OEM Claims…

Open →
TOOL

Freight Forwarder Shipment Quotation, Buy/Sell Rates, Routing & Margin Tool

🔔 Subscribe to ShipUniverse Weekly → Freight forwarding · NVOCC pricing…

Open →
TOOL

Ro-Ro Vehicle Terminal Yard Capacity, PDI & Vessel Loading Flow Tool

🔔 Subscribe to ShipUniverse Weekly → Vehicle terminals · PCTC &…

Open →
TOOL

Marine Hull & P&I Renewal, Premium Quote, Deductible & Coverage Comparison Tool

🔔 Subscribe to ShipUniverse Weekly → Marine Insurance · Renewal Tender…

Open →
TOOL

Offshore Support Vessel Charter Bid, Utilization & Campaign Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → Offshore commercial operations · PSV…

Open →
TOOL

Marine Repair Tender, Shipyard Bid Comparison & Contract Cost Risk Tool

🔔 Subscribe to ShipUniverse Weekly → Ship Repair Procurement · Yard…

Open →
TOOL

Container Transshipment, Missed Connection, Rollover & Recovery Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Container Liner Networks · Feeder-to-Mother…

Open →
TOOL

Vessel Pre-Purchase Technical Survey, Defect Valuation & Acquisition CAPEX Tool

🔔 Subscribe to ShipUniverse Weekly → Vessel S&P · Technical Due…

Open →
TOOL

Contract of Affreightment, Cargo Nomination, Fleet Allocation & Fulfilment Risk Tool

🔔 Subscribe to ShipUniverse Weekly → Dry Bulk Contracts · Cargo…

Open →
TOOL

Port Pilotage, Tug Dispatch, Berth Window & Marine Services Coordination Tool

🔔 Subscribe to ShipUniverse Weekly → Harbor Operations · Pilotage ·…

Open →
TOOL

Offshore Heavy Lift, Crane Spread, Weather Window & Installation Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Offshore Construction · Heavy Lifts…

Open →
TOOL

Cruise Embarkation, Terminal Security, Gangway Queue & Passenger Processing Tool

🔔 Subscribe to ShipUniverse Weekly → Cruise Operations · Terminal Security…

Open →
TOOL

Dangerous Goods Declaration, Booking Acceptance & Documentation Readiness Tool

🔔 Subscribe to ShipUniverse Weekly → IMDG Documentation · Dangerous Goods…

Open →
TOOL

Marine Salvage, Wreck Removal, Pollution Response & Casualty Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Marine Casualty · Emergency Salvage…

Open →
TOOL

Ferry Route Capacity, Timetable Reliability & Passenger Revenue Tool

🔔 Subscribe to ShipUniverse Weekly → Ferry Networks · Route Planning…

Open →
TOOL

Inland Barge Tow, Lock Delay, Fleet Utilization & Voyage Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → Inland Navigation • Towboat Economics…

Open →
TOOL

Marine Bunker Procurement, Supplier Quote Comparison & Delivered Fuel Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Bunker Procurement • Fuel Grades…

Open →
TOOL

Reefer Cargo Temperature Excursion, Cold Chain & Cargo Claim Exposure Tool

🔔 Subscribe to ShipUniverse Weekly → Reefer Cargo • Temperature Evidence…

Open →
TOOL

Electronic Bill of Lading, Cargo Release & Documentation Discrepancy Tool

🔔 Subscribe to ShipUniverse Weekly → Container Shipping • Digital Trade…

Open →
TOOL

Crew Change, Relief Logistics, Port Coordination & Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Fleet Crewing • Seafarer Repatriation…

Open →