SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

17Live Radars 286Maritime Tools
24/7Intelligence Focus
GlobalIndustry Coverage
RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…
SHIPUNIVERSE REPORTING

Reports, news and industry coverage

Full analysis in the ShipUniverse intelligence layout.

← Back to latest posts ShipUniverse / NEWS

Jinjiang’s Bangkokmax plan: a new intra-Asia capacity block on the drawing board

🔔 Subscribe to ShipUniverse Weekly →

Jinjiang Shipping has put a fresh fleet expansion on the table: a board-approved plan to build four 1,800 TEU “Bangkokmax” containerships, with options for four more, backed by a total budget of up to RMB 1.94 billion (about $270 million). The company frames the move as targeted capacity for Southeast Asia routes, with an emphasis on scaling its higher-end service offering across more loops while tightening links between Northeast Asia and Southeast Asia.

Click here for 30 second summary

Jinjiang’s Bangkokmax plan in one quick read

Jinjiang Shipping has approved a newbuilding plan for four 1,800 TEU Bangkokmax containerships, with options for four more, under a total investment ceiling of up to RMB 1.94 billion (about $270 million). The company positions the ships for Southeast Asia services and broader route coverage.

  • Scale
    Four firm ships equal about 7,200 TEU of capacity. With all options, the block rises to about 14,400 TEU.
  • Commercial read
    This is a frequency and network move. Bangkokmax-sized ships are typically aimed at regional loops where port limits and schedule reliability are key.
  • Industry ripple
    Another order proposal in the regional segment signals continuing appetite for modern intra-Asia tonnage, even as larger-vessel headlines dominate elsewhere.
Bottom line
The plan is a targeted intra-Asia capacity build with a built-in “scale up” option. The biggest swing factors for market impact will be shipyard choice and delivery timing once those details are finalized.

Seacon’s six ultramax resales, financed into a 15-year runway 2027 delivery window

The company is assuming six ultramax shipbuilding contracts and pairing them with sale-and-leaseback financing, turning a resale transaction into a long-dated fleet and liquidity plan.

Vessels

Six ultramax bulk carriers

Contracted build price

US$198.6m total

Delivery range

Jan 30 to Nov 30, 2027

Lease tenor

180 months from delivery

Transaction snapshot Edit column widths with CSS variables
Item Summary How the structure works Bottom-line effect
Scope and timing Six 63,800 dwt bulk carriers under shipbuilding contracts, with deliveries scheduled from 30 January 2027 to 30 November 2027. The contracts were assumed via novation. The prior buyer transfers rights and obligations, and the shipbuilding contracts continue under amended novation terms.
Locks in a defined delivery window for fleet growth. Concentrates execution risk into a single program and a tight 2027 schedule.
Price and milestone payments US$33.1m per vessel, US$198.6m total. Payment schedule is four instalments tied to refund guarantee, steel cutting, keel laying, and delivery. The largest cash point is the delivery instalment (US$19.86m per vessel). Earlier payments are smaller but still depend on guarantees and milestone confirmation.
Improves planning visibility for cash calls. Delivery instalments remain the main liquidity test if funding conditions tighten.
Resale paper angle The prior buyer transferred the contracts at nil consideration and had not paid instalments under the original contracts. Seacon steps into a clean contract position without inheriting paid-in amounts, then funds construction via its chosen financing route.
Cleaner entry point than taking over a heavily pre-paid resale. Still requires strong build and delivery control from this point onward.
Leaseback financing For each vessel, Seacon sells the ship to leasing owners for US$28.135m and charters it back under a 180-month bareboat. Sale-and-leaseback converts a large portion of construction cost into long-term scheduled hire. The company also provides a guarantee supporting obligations under the leasing documents.
Reduces upfront equity pressure and supports liquidity. Adds long-dated payment obligations that run through market cycles.
Hire profile and balloon Hire includes a fixed component (US$285,583.33 per post-delivery payment period) plus a variable component at a 1.85% margin plus a 3-month term SOFR reference rate. A balloon amount of US$11.0m is due on the last day of the charter period. The floating portion links part of cash cost to rates. The balloon keeps a higher financed amount for longer and shifts part of the paydown to the end of the term, alongside purchase mechanics.
Rate moves directly affect variable hire. The balloon supports earlier flexibility but concentrates end-of-term planning and refinancing focus later in the lease.
Options and end-game Purchase options exist during the lease, with an obligation to buy at the end of the charter period under preset pricing mechanics. This behaves like long-term financing with an operational wrapper. The lessor retains title during the lease; Seacon keeps commercial control through bareboat charter and a defined buyback path.
Supports fleet continuity and marketing as effectively controlled tonnage. Concentrates long-range balance sheet decisions around maturity.
Note: This block summarizes disclosed terms: six 63,800 dwt bulkers, US$198.6m aggregate shipbuilding consideration, deliveries from 30 January 2027 to 30 November 2027, and 180-month sale-and-leaseback structures including fixed and variable hire plus a US$11.0m balloon at end of term.
📊Numbers board: build price versus leaseback proceeds
The leaseback sale price (US$28.135m per ship) does not fully cover the disclosed shipbuilding price (US$33.1m per ship). The difference is a simplified view of gap funding, before timing effects, fees, or other adjustments.
Shipbuilding price per vessel (US$ m)
33.1
Leaseback proceeds per vessel (US$ m)
28.135
Simple gap per vessel (US$ m)
4.965
Quick read: at disclosed prices, the simple gap is about US$4.965m per ship, about US$29.79m across six ships, before timing, fees, and any contract adjustments at delivery.
🧮Leaseback gap quick check (editable)
Adjust the inputs to see how sensitive the gap is to price changes or different vessel counts.
Computed from your inputs:
Gap per vessel: US$4.965m
Gap total: US$29.790m
This is a simplified view that focuses on build price versus leaseback proceeds only.
🧭Industry angles stakeholders will track
  • Fleet strategy: a six-ship ultramax series arriving in one year tightens operational planning, but strengthens commercial offering with a consistent platform.
  • Financing posture: sale-and-leaseback lowers near-term cash pressure, but shifts emphasis to long-term hire discipline and rate sensitivity.
  • Market exposure: if ultramax markets soften in delivery months, bareboat obligations remain, making utilization and charter cover more important.
  • Execution focus: a tight delivery band increases the need for clear milestone control and refund guarantee coverage.
  • Long-range planning: the balloon and end-of-term purchase mechanics concentrate residual-value and refinancing focus well before maturity.
🗓️Build and financing timeline to watch
  • Late 2025 to early 2026: first instalments triggered after receipt of the relevant instalment refund guarantees.
  • Construction milestones: steel cutting and keel laying trigger the next two instalments per vessel.
  • 2027: deliveries staged from late January through late November.
  • From each delivery: 180-month bareboat term starts, with fixed and variable hire plus purchase option mechanics during the term.
  • End of each 180-month term: purchase obligation applies, with the balloon amount and other defined sums forming the end-payment package.

Jinjiang’s Bangkokmax proposal is a concentrated bet on intra-Asia network buildout, pairing a firm four-ship commitment with optional follow-on tonnage that can scale quickly if demand and trade coverage warrant it. The announcement focuses on Southeast Asia services and expanding premium-route capability, while the underlying numbers show a program that can materially lift capacity relative to the company’s current fleet footprint if the options are exercised.

We welcome your feedback, suggestions, corrections, and ideas for enhancements. Please click here to get in touch.
By the ShipUniverse Editorial Team — About Us | Contact


← Browse more ShipUniverse posts
MARITIME DECISION TOOLS

Practical tools for real vessel and commercial decisions

Browse the latest 24 tools or instantly search every published ShipUniverse maritime tool.

24 latest toolsView all 286 →
TOOL

Port Waste Reception, MARPOL Delivery Notice, Disposal Logistics & Charge Verification Tool

🔔 Subscribe to ShipUniverse Weekly → Port Operations · MARPOL Waste…

Open →
TOOL

Maritime Crew Recruitment, Retention, Manning Agency Fees & Attrition Cost Tool

🔔 Subscribe to ShipUniverse Weekly → ShipUniverse · Fleet Crewing Economics…

Open →
TOOL

Container Rail Intermodal Connection, Terminal Dwell & Train Slot Tool

🔔 Subscribe to ShipUniverse Weekly → Ship-to-Rail · Intermodal Terminal ·…

Open →
TOOL

Bulk Grain Cargo Quality, Fumigation, Hold Readiness & Rejection Exposure Tool

🔔 Subscribe to ShipUniverse Weekly → Cargo quality · Hold inspection…

Open →
TOOL

Marine Equipment OEM Warranty, Service SLA & Repair Claim Tool

🔔 Subscribe to ShipUniverse Weekly → Equipment Reliability · OEM Claims…

Open →
TOOL

Freight Forwarder Shipment Quotation, Buy/Sell Rates, Routing & Margin Tool

🔔 Subscribe to ShipUniverse Weekly → Freight forwarding · NVOCC pricing…

Open →
TOOL

Ro-Ro Vehicle Terminal Yard Capacity, PDI & Vessel Loading Flow Tool

🔔 Subscribe to ShipUniverse Weekly → Vehicle terminals · PCTC &…

Open →
TOOL

Marine Hull & P&I Renewal, Premium Quote, Deductible & Coverage Comparison Tool

🔔 Subscribe to ShipUniverse Weekly → Marine Insurance · Renewal Tender…

Open →
TOOL

Offshore Support Vessel Charter Bid, Utilization & Campaign Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → Offshore commercial operations · PSV…

Open →
TOOL

Marine Repair Tender, Shipyard Bid Comparison & Contract Cost Risk Tool

🔔 Subscribe to ShipUniverse Weekly → Ship Repair Procurement · Yard…

Open →
TOOL

Container Transshipment, Missed Connection, Rollover & Recovery Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Container Liner Networks · Feeder-to-Mother…

Open →
TOOL

Vessel Pre-Purchase Technical Survey, Defect Valuation & Acquisition CAPEX Tool

🔔 Subscribe to ShipUniverse Weekly → Vessel S&P · Technical Due…

Open →
TOOL

Contract of Affreightment, Cargo Nomination, Fleet Allocation & Fulfilment Risk Tool

🔔 Subscribe to ShipUniverse Weekly → Dry Bulk Contracts · Cargo…

Open →
TOOL

Port Pilotage, Tug Dispatch, Berth Window & Marine Services Coordination Tool

🔔 Subscribe to ShipUniverse Weekly → Harbor Operations · Pilotage ·…

Open →
TOOL

Offshore Heavy Lift, Crane Spread, Weather Window & Installation Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Offshore Construction · Heavy Lifts…

Open →
TOOL

Cruise Embarkation, Terminal Security, Gangway Queue & Passenger Processing Tool

🔔 Subscribe to ShipUniverse Weekly → Cruise Operations · Terminal Security…

Open →
TOOL

Dangerous Goods Declaration, Booking Acceptance & Documentation Readiness Tool

🔔 Subscribe to ShipUniverse Weekly → IMDG Documentation · Dangerous Goods…

Open →
TOOL

Marine Salvage, Wreck Removal, Pollution Response & Casualty Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Marine Casualty · Emergency Salvage…

Open →
TOOL

Ferry Route Capacity, Timetable Reliability & Passenger Revenue Tool

🔔 Subscribe to ShipUniverse Weekly → Ferry Networks · Route Planning…

Open →
TOOL

Inland Barge Tow, Lock Delay, Fleet Utilization & Voyage Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → Inland Navigation • Towboat Economics…

Open →
TOOL

Marine Bunker Procurement, Supplier Quote Comparison & Delivered Fuel Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Bunker Procurement • Fuel Grades…

Open →
TOOL

Reefer Cargo Temperature Excursion, Cold Chain & Cargo Claim Exposure Tool

🔔 Subscribe to ShipUniverse Weekly → Reefer Cargo • Temperature Evidence…

Open →
TOOL

Electronic Bill of Lading, Cargo Release & Documentation Discrepancy Tool

🔔 Subscribe to ShipUniverse Weekly → Container Shipping • Digital Trade…

Open →
TOOL

Crew Change, Relief Logistics, Port Coordination & Cost Tool

🔔 Subscribe to ShipUniverse Weekly → Fleet Crewing • Seafarer Repatriation…

Open →