SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

15Live Radars 251Maritime Tools
24/7Intelligence Focus
GlobalIndustry Coverage
NEW RADARS

Explore our latest intelligence radars

RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…
SHIPUNIVERSE REPORTING

Reports, news and industry coverage

Full analysis in the ShipUniverse intelligence layout.

← Back to latest posts ShipUniverse / REPORT

Top 10 Most Expensive Commercial Ships Being Built Right Now

πŸ”” Subscribe to ShipUniverse Weekly β†’

ShipUniverse Shipbuilding Cost Report

From $333 Million Containerships to $4 Billion FPSOs

A $333 million containership sounds expensive until it is parked beside a $2.2 billion floating LNG factory or a $4 billion FPSO. These are the commercial vessels and ship-shaped offshore assets absorbing some of the largest capital commitments in shipyards today.
October 15, 2026 snapshot FPSO / FLNG / Cruise / LNG / Offshore Public price anchors only Physical construction required
Highest public anchor
~$4.08B
Equal-share value of Petrobras's P-84 / P-85 contract.
Largest cruise value
~$3.1B
Financing-implied ceiling for Icon 5.
FLNG project
$2.2B
Golar Esperanza total conversion budget.
U.S. containership
~$333M
Equal-share value of Matson's $1B three-ship program.
Ranking methodology matters. Shipowners often do not disclose individual contract prices. Every value below is therefore identified as a direct contract, project budget, program average or financing-implied figure. This is a defensible public-data ranking, not a claim that every private shipbuilding contract worldwide is visible.

The modern shipbuilding market has split into two completely different capital worlds. A conventional VLCC can still be ordered for roughly $131 million and a very large containership for about $254 million. Offshore production units and the newest cruise ships can cost ten to thirty times as much.

The difference is not simply size. The expensive ships increasingly carry an industrial plant, resort, high-capacity crane system, LNG production train, cryogenic cargo system or country-specific construction requirement with them.

That makes the ranking more than a curiosity. It shows where maritime capital is actually being concentrated and which suppliers, yards, equipment makers and engineering disciplines sit behind the industry's largest individual build programs.

How the ranking works

Four different kinds of price evidence are used

Direct

Published vessel contract

A company or shipyard publicly states the price of the individual asset.

Program average

Multi-vessel contract divided by units

Useful where the exact allocation between sister vessels is not disclosed.

Financing implied

Contract value inferred from disclosed financing percentage

Used cautiously for Royal Caribbean's newest Icon-class ships.

Project budget

Complete vessel-development cost

Relevant for conversions such as FLNG where equipment and yard work extend far beyond hull cost.

The ranking

Ten extraordinary commercial shipbuilding investments

Rank 1
FPSO Β· Petrobras / Seatrium

P-84 Atapu

β‰ˆ$4.08B
equal-share program value
One half of the approximately $8.16 billion P-84/P-85 contract. The all-electric FPSO is designed for 225,000 barrels of oil per day plus 10 million mΒ³/day of gas processing.
Status Under construction
Deployment Atapu Β· Brazil
Target 2029
Rank 2
FPSO Β· Petrobras / Seatrium

P-85 SΓ©pia

β‰ˆ$4.08B
equal-share program value
Sister unit to P-84 with the same 225,000-bpd production rating and high-capacity gas-processing plant. Actual individual contract allocation has not been published.
Status Under construction
Deployment SΓ©pia Β· Brazil
Target 2030
Rank 3
Cruise Β· Royal Caribbean / Meyer Turku

Fifth Icon-Class Ship

Up to ~$3.13B
financing-implied ceiling
Royal Caribbean disclosed financing of up to about $2.5 billion, representing approximately 80% of contract price. Physical construction began with keel laying in September 2026.
Status Keel laid
Size ~5,600 berths
Delivery 2028
Rank 4
Cruise Β· Royal Caribbean / Meyer Turku

Hero of the Seas

Up to ~$3.0B
financing-implied ceiling
The fourth Icon-class ship floated out in September and is now undergoing approximately another year of outfitting before entering Miami service.
Status Outfitting afloat
GT ~250,800
Delivery 2027
Rank 5
FLNG Β· Golar / CIMC Raffles

FLNG Esperanza

$2.2B
total project budget
The former LNG carrier Fuji LNG is being transformed into a 3.5-mtpa floating liquefaction plant. The budget includes donor vessel, conversion, process equipment, commissioning preparation and delivery.
Status Conversion underway
Output 3.5 mtpa LNG
Delivery Q4 2027
Rank 6
Cruise Β· MSC / Chantiers de l'Atlantique

MSC World Asia

€1B+
program-average floor
MSC's third World-class vessel is in the final completion stage. The third- and fourth-ship contracts represented more than €2 billion combined.
Status Final outfitting
GT ~216,000
Delivery 2026
Rank 7
Cruise Β· MSC / Chantiers de l'Atlantique

MSC World Atlantic

€1B+
program-average floor
The fourth World-class vessel floated out in September 2026 and remains alongside at Saint-Nazaire for interior, public-area and technical completion.
Status Outfitting afloat
Fuel LNG dual fuel
Delivery 2027
Rank 8
Offshore Wind Β· Cadeler / COSCO

Wind Apex

~$400M
direct contract
A next-generation A-class installation vessel with more than 5,600 mΒ² of deck space and payload above 17,000 tonnes. It can switch between turbine and giant foundation installation work.
Status Under construction
Payload 17,000+ t
Delivery 2027
Rank 9
LNG Carrier Β· QatarEnergy / Hudong-Zhonghua

First QC-Max LNG Carrier

β‰ˆ$344.6M
24-ship program average
The first 271,000-mΒ³ QC-Max entered physical construction in June 2026. The 24-ship program is worth more than $8.27 billion and represents the largest LNG-carrier order of its kind.
Status Construction started
Capacity 271,000 mΒ³
Length 344 m
Rank 10
Containership Β· Matson / Hanwha Philly

New Aloha-Class Containership

β‰ˆ$333M
three-ship program average
Matson's three LNG-powered Jones Act Aloha-class ships represent approximately $1 billion of investment. All three are now in the construction sequence at Hanwha Philly Shipyard.
Status Under construction
Capacity 3,600 TEU
Speed 23+ knots
The strangest comparison in the ranking

A 3,600-TEU Matson ship costs more than today's global 24,000-TEU benchmark

Not a like-for-like comparison

U.S. construction economics versus global mega-containership economics

Matson Aloha-class program average
~$333M
3,600 TEU Β· U.S.-built Β· LNG dual fuel Β· 23+ knots.
Clarksons 22K–24K TEU benchmark
~$254M
Global newbuilding benchmark in August 2026.
The smaller ship costs roughly 31% more. The comparison reflects radically different construction environments and vessel missions rather than simple shipyard inefficiency. Matson's vessels are Jones Act-compliant, U.S.-built ships optimized around domestic service, high speed and a specialized LNG-capable design.
The opposite effect

The world's largest LNG carrier appears cheaper per cubic meter

QC-Max program average
~$345M
271,000 mΒ³ cargo capacity gives an approximate build cost of $1,272 per cubic meter.
Standard LNGC benchmark
$248.5M
174,000 mΒ³ gives approximately $1,428 per cubic meter.
Extra ship price
~39%
Approximate QC-Max premium over the current conventional LNGC benchmark.
Extra cargo volume
~56%
The larger ship gains substantially more cargo capacity than its price increases.
Approximate construction cost per cubic meter falls about 11%. That does not prove lower transportation cost because port compatibility, fuel, financing and utilization still matter. It does show the industrial logic behind moving LNG carriers toward unprecedented scale.
Why does a ship reach $1 billion?

Hull steel is rarely the thing creating the extraordinary price

FPSO Floating refinery
Topsides contain oil separation, compression, water treatment, injection, gas processing, power generation and export systems. The vessel is an industrial production plant sitting on a ship-shaped hull.
Cruise Floating city
Thousands of cabins, restaurants, pools, entertainment systems, HVAC, electrical capacity, wastewater treatment and hotel systems create an outfitting bill radically different from cargo ships.
FLNG Liquefaction plant
Gas pretreatment, compression, liquefaction trains, utilities, storage and offloading equipment transform a vessel into an offshore LNG export terminal.
Offshore wind Giant lifting system
Jack-up legs, enormous cranes, dynamic positioning and heavy deck structures are designed to manipulate turbine components and foundations that can weigh thousands of tonnes.
Jones Act Domestic build
U.S. construction, labor, supply-chain scale and a low-volume domestic shipbuilding environment can push the price of a comparatively small commercial vessel above much larger Asian-built ships.
The ship waiting to enter the ranking

One signed project would immediately jump into the Top 5

Excluded on construction-status grounds

Golar's fourth FLNG

Golar signed the EPC contract with CIMC Raffles in August 2026 and has secured the donor vessel and long-lead equipment. The fully delivered budget is approximately $2.45 billion. The public disclosures reviewed for this report did not yet provide the same clear physical-conversion milestone available for FLNG Esperanza, so it is held outside the strict β€œbeing built right now” ranking.
$2.45B project budget
Full comparison

Ten ships, five completely different capital models

ShipUniverse high-cost newbuild board Values reflect the strongest public price anchor available for each project
Vessel Type Price anchor Evidence Builder Status Delivery
P-84 FPSO β‰ˆ$4.08B Program average Seatrium network Construction 2029
P-85 FPSO β‰ˆ$4.08B Program average Seatrium network Construction 2030
Icon 5 Cruise Up to ~$3.13B Financing implied Meyer Turku Keel laid 2028
Hero of the Seas Cruise Up to ~$3.0B Financing implied Meyer Turku Outfitting 2027
FLNG Esperanza FLNG $2.2B Project budget CIMC Raffles Conversion Q4 2027
MSC World Asia Cruise €1B+ Program floor Chantiers de l'Atlantique Final completion 2026
MSC World Atlantic Cruise €1B+ Program floor Chantiers de l'Atlantique Outfitting 2027
Wind Apex Wind installation ~$400M Direct contract COSCO Construction 2027
QC-Max #1 LNG carrier β‰ˆ$344.6M Program average Hudong-Zhonghua Construction Future delivery
Matson Aloha-class Containership β‰ˆ$333M Program average Hanwha Philly Construction 2027–28
Research anchors

Price and construction-status sources

Seatrium / Petrobras
P-84 and P-85 two-FPSO contract, construction program, production capacity and 2029–30 deployment schedule.
Royal Caribbean SEC filings / Meyer Turku
Icon-class financing percentages, financing ceilings, Hero float-out and Icon 5 keel-laying status.
Golar LNG
$2.2 billion FLNG Esperanza conversion budget and construction status at CIMC Raffles.
Chantiers de l'Atlantique / MSC Cruises
World-class ship investment program, World Asia completion and World Atlantic float-out / outfitting milestones.
Cadeler
Approximately $400 million Wind Apex contract and 2027 delivery.
CSSC / Hudong-Zhonghua / QatarEnergy
24-vessel QC-Max program exceeding $8.27 billion and first physical construction milestone in June 2026.
Matson / Hanwha Philly Shipyard
Approximately $1 billion three-vessel Aloha-class program and current construction milestones.
Clarksons Research market benchmarks
August 2026 benchmark values of approximately $248.5 million for a 174,000-mΒ³ LNG carrier and $254 million for a 22,000–24,000-TEU containership.
Interactive capital model

Mega-Ship Capital Recovery Tool

Convert a multi-billion-dollar ship price into the annual and daily cash contribution required simply to recover capital over its economic life.

Asset economics
$4.08B
25 years
8.0%
365
Capital recovery hurdle
The asset must create roughly $1 million per operating day just to carry its capital
This is capital recovery only. Operating expense, tax, maintenance, fuel, insurance and project-specific costs sit on top.
$1.05M/day required capital recovery per operating day
Annual capital recovery
$382M
Annualized cost after selected life, return and residual value.
Capital recovery factor
9.37%
Annual fraction of present capital requiring recovery.
Present value of residual
$60M
Discounted value of the user-selected end-of-life residual.
Modeled annual net cash
$456M
Selected net cash contribution multiplied by operating days.
Capital coverage
1.19Γ—
Annual modeled cash divided by annualized capital recovery.
Simple payback
8.9 yrs
Initial cost divided by selected annual net cash contribution.
This tool isolates capital intensity and is not a complete vessel investment model. For FPSOs and FLNG units, project revenue structures differ fundamentally from conventional ship chartering. Cruise ships also generate passenger, onboard and destination revenue rather than a simple day rate. The model therefore treats daily cash contribution as a generic user-defined cash measure. Construction financing, construction-period interest, taxes, operating expense, drydocking, decommissioning and contract-specific risk are excluded.
Feedback Welcome

We welcome your feedback, suggestions, corrections, and ideas for enhancements.

Please click here to get in touch
By the ShipUniverse Editorial Team β€” About Us | Contact


← Browse more ShipUniverse posts
MARITIME DECISION TOOLS

Practical tools for real vessel and commercial decisions

Browse the latest 24 tools or instantly search every published ShipUniverse maritime tool.

24 latest toolsView all 251 β†’
TOOL

Fleet Class Survey, Statutory Certificate & Expiry Planning Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Fleet Compliance β€’ Class /…

Open β†’
TOOL

Drydock Project Critical Path, Work Package & Schedule Overrun Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Drydock β€’ Work Packages ‒…

Open β†’
TOOL

Container Demurrage, Detention, Free Time & Storage Cost Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Container Logistics β€’ Free Time…

Open β†’
TOOL

Naval Fleet Replenishment, Fuel Endurance & Sustainment Planning Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Naval Logistics β€’ Fuel /…

Open β†’
TOOL

Cruise Tender Operations, Passenger Throughput & Excursion Revenue Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Cruise Port Calls β€’ Tender…

Open β†’
TOOL

Ship Recycling IHM, Survey & Yard Readiness Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Ship Recycling β€’ IHM Part…

Open β†’
TOOL

Port Berth Productivity, Crane Deployment & Vessel Turnaround Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Container Terminals β€’ Berth Occupation…

Open β†’
TOOL

Offshore DP Capability, Thruster Failure & Station-Keeping Margin Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Offshore DP Operations β€’ Directional…

Open β†’
TOOL

Ship-to-Ship Transfer Fender, Mooring, Hose & Transfer Planning Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Marine Operations β€’ Fender Energy…

Open β†’
TOOL

Vessel Sanctions, AIS Anomaly & Counterparty Due Diligence Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Sanctions β€’ AIS Integrity ‒…

Open β†’
TOOL

Marine Biofuel Compatibility, Fuel Changeover & Engine Readiness Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Biofuel Grades β€’ FAME /…

Open β†’
TOOL

Charterparty Speed, Consumption, Weather & Performance Claim Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Time Charter β€’ Speed Warranty…

Open β†’
TOOL

Port State Control Inspection, Deficiency & Detention Risk Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Port State Control β€’ Vessel…

Open β†’
TOOL

Critical Spares Procurement, Lead Time, Inventory & Stockout Risk Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Criticality β€’ Minimum Spares ‒…

Open β†’
TOOL

Ship Cyber Exposure, Remote Access & OT Risk Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Satcom / Starlink β€’ IT…

Open β†’
TOOL

Newbuild vs Secondhand Vessel Acquisition, Financing & Fleet Renewal Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ NEWBUILD INSTALLMENTS β€’ DELIVERY DELAY…

Open β†’
TOOL

Laytime, Demurrage, Dispatch & Port Delay Cost Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ NOR β€’ Laytime Clock ‒…

Open β†’
TOOL

EU ETS, FuelEU Maritime, EUA Cost & Charterer Allocation Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ EU ETS Maritime β€’ CO₂…

Open β†’
TOOL

Marine Main Engine Lubricating Oil Pressure, Bearing Temperature & System Capacity Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ LO Supply Pressure β€’ Filter…

Open β†’
TOOL

Marine Main Engine Exhaust Valve Leakage, Exhaust Temperature & Cylinder Condition Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Cylinder EGT β€’ Temperature Spread…

Open β†’
TOOL

War Risk Premium, Route Diversion & Voyage Cost Impact Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ War Risk AP β€’ Hull…

Open β†’
TOOL

Vessel Off-Hire Revenue Loss, Charter Deduction & Recovery Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Time Charter Hire β€’ Off-Hire…

Open β†’
TOOL

Marine Equipment Repair vs Replace, NPV & Lifecycle Cost Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Repair Cost β€’ Replacement CAPEX…

Open β†’
TOOL

Drydock CAPEX, Special Survey Cost & Reserve Planning Tool

πŸ”” Subscribe to ShipUniverse Weekly β†’ Drydock CAPEX β€’ Special Survey…

Open β†’