The Gulf of Oman Has Hit Its Oil-Transfer Limit. What Happens if Another 20 VLCCs Arrive?

🔔 Subscribe to ShipUniverse Weekly →

ShipUniverse Maritime Logistics Stress Test

The VLCC Queue Building Outside Hormuz

The Gulf's emergency oil-export system has reached the point where adding tankers does not necessarily add capacity. Another 20 VLCCs would bring roughly 40 million barrels of nominal cargo space into a transfer network already constrained by STS slots, equipment, support crews and vessel cycle time.
Gulf of Oman VLCC STS Saudi export rerouting September 25, 2026
STS capacity pressure At practical limit
Available Tight Queueing Capacity limit
At saturation, the 21st arriving tanker is not automatically another 2 million barrels of export capacity. It may simply become another vessel waiting for a transfer slot.

Gulf producers have built a floating logistics system outside the Strait of Hormuz. Shuttle tankers load crude inside the Gulf, transit the strait and transfer cargo to other VLCCs in the Gulf of Oman. The receiving ships then continue toward refineries, while shuttle vessels return through Hormuz and repeat the cycle.

The system is now carrying volumes it was never originally designed to handle. Saudi exports through Hormuz are tracking around 3.6 million barrels per day in September, up from about 900,000 barrels per day in August. Iraq and the UAE are also using the same offshore transfer network.

Vessel availability is no longer the only constraint. Transfer support around Fujairah and Sohar is reported at or near maximum capacity. Tugboats, fenders, hoses, mooring support and personnel have become part of the throughput equation. The result is a tanker queue in which the next ship can add cost much faster than it adds exported barrels.

Current operating system

The transfer network is already running at record intensity

September liquid STS activity
7.2M bpd
Kpler September-to-date Gulf of Oman activity. Some barrels may be transferred more than once.
VLCC crude STS activity
~6M bpd
Vortexa estimate for crude loaded west of Hormuz since late August.
New STS pairs starting
~3/day
Roughly three VLCC pairs beginning transfer operations daily.
Current STS operation
~10 days
Up from approximately five to seven days previously.
Different datasets measure different parts of the system. Kpler's 7.2 million bpd figure measures liquids STS activity and may count barrels undergoing multiple transfers. Vortexa's roughly 6 million bpd figure refers specifically to crude loaded on VLCCs from ports west of Hormuz.
The 20-VLCC shock

Twenty more ships are much bigger than they sound

Additional VLCCs 20

They represent a second fleet inside the queue

A VLCC typically carries about 2 million barrels. Twenty arrivals therefore represent roughly 40 million barrels of nominal cargo capacity before any transfer begins.

Nominal cargo capacity
40M bbl
20 ships × 2 million barrels.
Versus current shuttle fleet
+37%
Kpler estimates about 54 current shuttle VLCCs.
Current start-slot equivalent
6.7 days
If all three daily STS starts were devoted to the newcomers.
Queue mechanics

At full utilization, more ships do not make the queue disappear

The key variable is spare STS start capacity, not the number of tankers waiting nearby.
STS starts
3/day
Existing demand
~3/day
Spare capacity
~0
The queue does not naturally clear when arrivals equal service capacity. If the existing flow already consumes roughly three daily STS starts, adding 20 vessels creates a backlog that must be removed through additional transfer capacity, diversion, reduced upstream loadings or direct voyages.
A useful queueing approximation

Ten-day operations create a surprisingly large vessel footprint

Starts per day
3 pairs
Current Vortexa-reported operating rate.
Operating cycle
~10 days
Current reported STS operation duration.
Implied simultaneous pairs
~30
Simple throughput × duration approximation.
Implied vessels involved
~60
Rough analytical occupancy, not a reported vessel count.
The release valves

The queue can move, but distance destroys tanker productivity

Round cycle 17 d

Gulf of Oman

0.12 mbd per VLCC Shortest shuttle Capacity constrained

The most productive location, but shore-side and marine support are now operating close to practical limits.

Round cycle 21 d

West Coast India

0.09 mbd per VLCC +4 days 25% lower productivity

Kutch, Mumbai and Vadinar offer the nearest major alternative lightering options outside the Gulf of Oman system.

Round cycle 38.5 d

Offshore Malaysia

0.05 mbd per VLCC +21.5 days 58% lower productivity

Linggi and Pelepas add transfer capacity but more than double the shuttle cycle compared with Gulf of Oman operations.

Fleet multiplication

Moving the transfer point requires more ships for the same barrels

STS location productivity Kpler round-trip and fleet-demand estimates
STS location Round voyage Capacity / vessel VLCCs for 3 mbd Relative productivity
Gulf of Oman 17 days 0.12 mbd ~25 Highest
West Coast India 21 days 0.09 mbd ~32 -25%
Offshore Malaysia 38.5 days 0.05 mbd ~58 -58%
Same transport work

Twenty Gulf of Oman shuttles become 27 in India or 48 in Malaysia

Based on Kpler's estimated monthly transport capacity per vessel.
Gulf of Oman
20
Theoretical 2.4 mbd transport capacity if STS support were available.
West Coast India equivalent
~27
About seven additional VLCCs for the same modeled transport capacity.
Malaysia equivalent
~48
More than twice the original vessel count for the same modeled capacity.
Vessel-day exposure

Waiting turns into nine-figure tanker capacity surprisingly fast

Illustrative time-charter-equivalent exposure using the record $1.27 million/day Middle East-to-China VLCC rate reported this week. These are not demurrage calculations.
5 days
$127M
7 days
$177.8M
10 days
$254M
14 days
$355.6M
These figures measure immobilized vessel economics, not invoices. Individual charter contracts, demurrage clauses and voyage terms vary. The calculation simply applies today's reported VLCC market rate to 20 ships for the stated number of days.
The actual bottleneck

More sea room does not automatically create another STS berth

Tugs
Marine support has to scale with vessel movements Reuters reports queues for equipment such as tugboats as STS activity intensifies.
Fenders
Two VLCCs require specialized separation equipment STS operations depend on correctly selected and maintained pneumatic fenders and associated rigging.
Hoses
Cargo-transfer equipment is finite Hose strings require inspection, handling, maintenance and safe installation between vessels.
People
Mooring and transfer operations require qualified personnel Reuters specifically identifies labour constraints, while current OCIMF guidance emphasizes human factors and service-provider competence.
Weather
Offshore transfers need safe environmental windows Mooring loads, vessel movement and hose integrity impose operating limits that cannot simply be ignored to raise throughput.
How the system could absorb more barrels

The next million barrels per day probably comes from reshuffling the network

GoO operational efficiency
+0.5 mbd
Kpler base-case assumption for additional local capacity.
Crude prioritization
+0.5 mbd
Potential capacity from moving more product STS activity elsewhere.
West Coast India
+0.5 mbd
Kpler base-case crude increment after weather restrictions ease.
Remaining barrels
Elsewhere
Malaysia, direct voyages or another operating solution.
The alternative to transferring

Some cargoes will simply skip the Gulf of Oman STS step

Saudi China

Direct long-haul delivery

The Bahri-operated VLCC Gold Shine loaded roughly 2 million barrels at Ras Tanura and was heading directly toward Quanzhou rather than transferring the cargo off Oman.

STS India

Vadinar diversion

Reuters reported that South Korean refiner S-Oil was sending two VLCCs to conduct transfers off Vadinar on India's west coast.

STS Malaysia

Linggi lightering

Tanker-market participants have reported increasing crude-transfer activity around Malaysia's established transshipment hubs.

Research anchors

Data behind the stress test

Reuters, September 25, 2026 Gulf of Oman STS capacity limits, Saudi export flows, three daily VLCC-pair starts, near-10-day STS operations, transfer queues and record VLCC freight.
Kpler, September 21, 2026 Gulf of Oman STS volume, regional capacity limits, 17-day Gulf shuttle cycle, West Coast India and Malaysia alternatives, per-vessel transport capacity and VLCC requirements.
Reuters, September 21, 2026 Development of the Hormuz shuttle system, Gulf of Oman STS growth and record freight economics.
OCIMF 2025 STS Transfer Guide Current industry guidance covering STS planning, fenders, cargo hoses, mooring equipment, human factors and safe execution.
Interactive congestion model

Gulf of Oman VLCC Queue Stress Tool

Add tankers to a saturated STS network, change transfer-start capacity or divert vessels to India or Malaysia and see how the queue, vessel-days and transport productivity change.

VLCC arrivals
20
0
0%
Gulf of Oman service rate
Diversion economics
GoO queue outcome
The additional queue does not naturally clear
Existing background demand is consuming all modeled STS start capacity, leaving no spare service rate for the new arrivals.
No clearance modeled queue-clear time
Cargo capacity represented
40M bbl
Nominal cargo capacity of the additional arriving VLCCs.
VLCCs remaining in GoO system
20
New arrivals not redirected to the selected alternative hub.
VLCCs diverted
0
New arrivals shifted to the alternative STS location.
Extra start-slot demand
6.7 d
Days of current GoO STS start capacity represented by remaining arrivals.
Waiting TCE-equivalent exposure
$177.8M
Assumed wait × GoO vessels × selected VLCC market rate.
Diversion vessel-days added
0
Additional vessel-days caused by the longer selected STS cycle.
Transport productivity comparison
GoO theoretical
2.40 mbd
West Coast India
1.80 mbd
Equivalent fleet
27 ships
This is a queue and fleet-productivity stress model, not a live vessel traffic forecast. The reported Gulf of Oman system is already experiencing queues, but the exact current queue length is not publicly established in the sources used here, so the default existing queue is zero and can be changed manually. The $1.27 million/day figure is used only as a time-charter-equivalent measure of vessel capacity and should not be interpreted as demurrage. Route productivity assumptions use Kpler's September 2026 estimates of 0.12 mbd per Gulf of Oman shuttle, 0.09 mbd for West Coast India and 0.05 mbd for Malaysia.
Feedback Welcome

We welcome your feedback, suggestions, corrections, and ideas for enhancements.

Please click here to get in touch
By the ShipUniverse Editorial Team — About Us | Contact