Shipyard Production Capacity, Critical Supplier Bottlenecks, Workforce Allocation & Newbuild Delay Cost Tool
Shipyard Production Capacity, Critical Supplier Bottlenecks, Workforce Allocation & Newbuild Delay Cost Tool
Screen delivery promises against real production capacity. Model hull-by-hull work packages, scarce skilled trades, dock slots and long-lead equipment; compare mitigation tenders on avoided delay cash exposure and five-to-ten-year investment economics.
What is and is not included
Simple is a screening lower-bound: a shared portfolio completion milestone is constrained by aggregate labor, berth-wave capacity and one critical supplier gate. It is not a hull-by-hull resource schedule. Advanced uses weekly allocation of trade hours and facility slots, ordered work packages and confirmed or provisional supplier arrival dates. Packages are sequential per hull; the model does not simulate crane lifts, detailed block spatial conflicts, weather or independent class approval. Cash carry and potential liquidated damages are kept separate; the LD schedule, grace periods and caps are user-entered, and enforceability requires contract review.
Glossary & modeling conventions
Productive capacity: available workers × productive hours × efficiency. Berth/dock slots: concurrent work-package positions at a facility. Resource constraint: a trade or facility that limits progress within a week. Supplier gate: work cannot start before its required confirmed or assumed arrival. Stage-weeks blocked: instances of incomplete work unable to progress because its gate is not ready, not the same as causal delivery delay. Carry cost: actual incremental financing, supervision and yard overhead per delay day. LD: contract-specific, potential liquidated damages with grace and a percentage cap. Work package: an ordered phase required on every hull in the Advanced example. Mitigation: one additive capacity / supplier-expedition tender evaluated on its own. NPV: discounted cash flows minus time-zero CAPEX. IRR: rate at which NPV is zero, if a meaningful root exists. Repeatable portfolio factor: assumption scaling one modeled portfolio's delay savings into annual repeat-cycle benefits; not a forecast of signed orders. Review cleared: a screening gate only, never contract or engineering authorization.
Internal model self-checks
Shipyard delivery & capacity decision intelligence
SIMPLE · LIVEDelivery timetable and delay exposure
Contract dates versus resource-constrained forecast, by hull in Advanced mode.
Cash exposure bridge
Incremental time-related carrying costs and potential contract LDs are distinct cash categories.
Utilization & bottleneck drivers
Trade availability, facilities and supplier gates constrain work progress.
Capacity investment / mitigation tender wall
Advanced mode compares each intervention separately to the same baseline. Positive NPV depends on assumed repeatability of delay savings.
Annual cash flow & discounted value
Week-by-week production progression
Completed production work-hours and modeled active hulls. The Advanced planner reserves at most one facility slot per active work package each week.
Critical supplier and stage analysis
25-scenario workforce × supplier-delay stress
Simple: total prospective cash delay exposure. Advanced: baseline financial exposure under workforce efficiency and supplier-arrival shocks. Select a cell to inspect it without changing stored assumptions.