
🔔 Subscribe to ShipUniverse Weekly →
Singapore and Australia signed a legally binding bilateral agreement on November 24, 2026, in Canberra establishing a framework for transporting captured carbon dioxide from Singapore to permanent geological storage beneath the seabed in Australian jurisdiction. The agreement, signed by Singapore Minister Grace Fu and Australian Minister Don Farrell, establishes how both countries will handle permitting responsibilities, CO₂ measurement, emissions accounting and the transfer of responsibility when cargo is offloaded from a vessel in Australia. It was signed during the 11th Singapore–Australia Annual Leaders' Meeting. The treaty requires completion of domestic procedures before entering into force, and individual transport and storage projects remain subject to separate regulatory approvals. No CO₂ carrier contract, receiving terminal or operating shipping route was announced.
Singapore–Australia Treaty Opens a Legal Path for a New CO₂ Shipping Trade
The agreement goes beyond diplomatic cooperation. Its provisions explicitly anticipate vessel deliveries, offshore offloading infrastructure and cross-border transfer of emissions-accounting responsibilities.
November 24, 2026, Canberra
Chevron–MOL examined this potential annual volume
Annual CO₂-equivalent capture potential targeted for 2030
Under the new bilateral agreement
Articles 1, 4 and 5 contain operationally important provisions for the movement of captured CO₂ by sea.
| Treaty Provision | Defined Arrangement | Maritime Consequence |
|---|---|---|
| Handover Point | First offloading from a vessel within Australian jurisdiction. | Potential facilities include offshore buoys, floating storage-and-injection hubs, direct-injection docking points and terminals. |
| Emissions Accounting | Singapore is responsible before handover; Australia at and after handover. | Transport-related fugitive emissions must be accounted for across the jurisdictional boundary. |
| Cargo Measurement | Quantity and composition measured at Singapore export and Australian handover. | Creates requirements for cargo metering, sampling, documentation and verification. |
| Permitting | Each country retains responsibilities under domestic and international law. | Individual shipments and storage operations require applicable approvals. |
The treaty allocates national emissions-accounting responsibilities, not every element of private commercial liability. Cargo ownership, freight terms, insurance allocation and contractual risk transfer would still require commercial agreements.
In November 2022, Chevron and Mitsui O.S.K. Lines signed a joint feasibility-study agreement examining the movement of up to 2.5 million tonnes of liquefied CO₂ annually from Singapore to permanent offshore storage in Australia by 2030.
Singapore's Energy Market Authority has separately identified the S-Hub initiative, involving Shell and ExxonMobil, as a study targeting approximately 2.5 million tonnes of annual carbon capture and storage by 2030. Singapore's broader Jurong Island ambition is to develop at least 2 million tonnes of CO₂-equivalent annual capture potential by that year.
Feasibility target announced in 2022 for Singapore-to-Australia liquid CO₂ transport. No resulting carrier contract is established by the new treaty.
Projects at various stages as of September 2026, according to Geoscience Australia; two were operational at commercial scale.
Illustrative cargo arithmetic based on a hypothetical vessel lifting 20,000 tonnes of CO₂ per laden voyage. These are not committed trade volumes, operating schedules or forecasts.
| Annual CO₂ Transport | Laden Voyages Per Year | Interpretation |
|---|---|---|
| 500,000 tonnes | 25 | Illustrative small-volume commercial program. |
| 1 million tonnes | 50 | Approximately one laden departure per week. |
| 2 million tonnes | 100 | Approximately two laden departures per week. |
| 2.5 million tonnes | 125 | Illustrative volume comparable to the earlier Chevron–MOL study target. |
These calculations establish potential shipping frequency, not the number of vessels needed. Fleet requirements would depend on voyage distance, round-trip duration, port turnaround, weather allowances, utilization and actual net cargo capacity.
Large-carrier technology is advancing independently. In March 2025, DNV granted Approval in Principle to a Shell–Brevik Engineering concept for a 74,000-cubic-meter liquid CO₂ carrier designed for Asia-Pacific transport. Its low-pressure cargo system was designed to operate at approximately −50°C and 6–8 barg. Design approval is not a construction order, and no connection to this bilateral agreement has been established.
Discharge into onshore storage tanks, with subsequent compression or pumping into a pipeline and injection system.
Specialized offshore mooring, floating storage or docking facilities could connect receiving vessels to offshore storage infrastructure.
Potential demand spans cargo containment, refrigeration, transfer equipment, metering and dedicated vessel operating expertise.
The agreement's definition of a handover point expressly accommodates both shore-based and offshore receiving arrangements. Its Joint Management Committee, to be established when the treaty enters into force, will discuss handover locations and measurement standards.
Australia's Bonaparte Basin illustrates the potential scale of future storage developments. In October 2026, the government recognized the West Peron geological formation for INPEX's proposed Bonaparte CCS project, whose stated potential is up to 443 million tonnes of cumulative storage. The project is initially expected to handle emissions from Ichthys LNG, subject to approvals. It has not been designated as a Singapore CO₂ receiving site.
| Required Milestone | Present Position | Commercial Significance |
|---|---|---|
| Treaty Entry Into Force | Domestic procedures and diplomatic notifications remain necessary; entry follows 30 days after the final notification. | Framework becomes legally operative. |
| Storage and Environmental Permits | No individual project is approved by the treaty alone. | Establishes allowable injections and receiving arrangements. |
| Export and Receiving Facilities | No bilateral terminal or handover location announced. | Determines vessel interface, cargo handling and logistics. |
| Transport and Storage Contracts | No confirmed CO₂ carrier charter or binding bilateral cargo program. | Would establish freight volumes, pricing and vessel demand. |
The Singapore–Australia agreement provides a legal framework for a potentially new cross-border CO₂ shipping trade, including vessel handover arrangements and emissions accounting. Earlier commercial studies demonstrate interest in moving millions of tonnes annually, but the market remains pre-operational. The next measurable advances will be approved storage locations, receiving infrastructure, committed capture volumes and the first dedicated vessel contracts.
We welcome your feedback, suggestions, corrections, and ideas for enhancements.
Please click here to get in touch