SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…
SHIPUNIVERSE REPORTING

Reports, news and industry coverage

Full analysis in the ShipUniverse intelligence layout.

← Back to latest posts ShipUniverse / NAVAL

Six Contracts That Reveal The Navy’s Undersea Technology Spending and Their Top Priorities

🔔 Subscribe to ShipUniverse Weekly →

SHIPUNIVERSE / NAVAL PROCUREMENT · NOVEMBER 25, 2026

You can spend billions building submarines and still get held up by a valve, a software release or equipment that isn't ready when the boat needs it. The Navy's latest contract notices tell that story better than another concept drawing. Six recent awards cover advanced research, sonar hardware, combat-system security, reactor planning, specialized valves and the ships that keep listening at sea. This is where undersea money is moving—and where the supplier headaches will be.

$462.0MCombined announced value of six contract actions
$51.9MIdentified award-time obligations across five actions
5 + 1Surveillance ships plus separate missile-range instrumentation vessel
Nov 17–24Dates of the public contract announcements
Selected actions, not total U.S. undersea spending. Face values, exercised options and funds obligated at award are different financial measures.
01 / THE SPENDING PATTERN

Three Needs Behind the Six Awards

Keep listeningSonar hardware and ocean-surveillance ship operations. Acoustic sensing only delivers value when the systems and their platforms are ready.
Keep boats supportableReactor planning, mechanical components and cybersecure combat software. Existing submarines need continual engineering support.
Keep developingNew research to improve future submarine capabilities. The latest notice does not identify a finished new sensor or SSN(X) construction award.
02 / THE SIX CONTRACTS

Announced Value Versus Initial Obligation

The first figure is the action's announced value. The second is the amount expressly identified as obligated at the time of that action.

RecipientAnnouncedInitial obligationProcurement purpose
Crowley Government Services$270.43MNot statedSix surveillance/instrumentation vessel operations and maintenance
HII Newport News$87.24M$6.83MAdvanced submarine research and development
General Dynamics Electric Boat$42.62M$8.54MReactor plant planning and sustainment support
Lockheed Martin RMS$31.06M$31.06MSonar production hardware
General Dynamics Mission Systems$20.54M$3.95MAN/BYG-1 information-assurance software
HII Newport News$10.14M$1.50MNuclear submarine valve engineering and design
Funding reality: The five actions reporting initial obligations total $51.88 million. Crowley's notice does not specify its award-time obligation. That unknown amount cannot be treated as zero, and the $462.03 million combined announced value must not be described as cash spent.
03 / SIX CONTRACT ASSESSMENTS

What Each Award Actually Buys

Open each section for the award details, technical significance, restrictions and potential supplier involvement.

01$270.4M — Crowley Government Services
Keep five ocean-surveillance ships and a separate instrumentation ship operating.
Details
ContractA six-vessel operations-and-maintenance contract announced November 20. It covers USNS Victorious, Able, Effective, Loyal and Impeccable (T-AGOS), plus USNS Howard O. Lorenzen (T-AGM).
What the Navy needsThe five T-AGOS ships support acoustic surveillance using towed-array systems. The T-AGM ship performs missile-range instrumentation, not the same sonar-surveillance mission.
DurationA six-month firm period from December 1, 2026, with two possible six-month extensions through May 2028.
Supplier opportunityMarine engineering, maintenance, shipboard systems, spares and logistics through the operating contractor.
Contract N32205-27-C-1202. This is a vessel-support contract, not procurement of new sonar arrays. The notice does not specify the initial amount obligated.
02$87.2M — HII Newport News
Research for current and future nuclear submarine platforms.
Details
ContractA cost-plus-fixed-fee modification to existing submarine technology research work. Awarded November 20 and announced November 24; performance expected through September 2027.
Financial detail$6.83M in FY2027 Navy research funding obligated initially. With all options, the reported cumulative value of the contract change could reach $494.93M.
Technical importanceResearch is needed before new technologies can be tested, integrated, qualified and incorporated into operational submarine systems.
Supplier opportunityEngineering analysis, physics modeling, embedded systems, prototyping, advanced materials and specialized testing through approved channels.
Contract N00024-21-C-2104. The announcement does not identify a particular new sonar product, a completed technology or an SSN(X)-specific allocation.
03$42.6M — General Dynamics Electric Boat
Reactor-plant planning support for submarines and training ships.
Details
ContractEngineering support for nuclear submarine reactor planning and the Navy's moored training ships. Work is allocated to Groton, Connecticut, and Charleston, South Carolina.
Financial detailInitial obligations total $8.5425M, comprising $5M in operations and maintenance and $3.5425M in research funding.
Technical importanceConfiguration control, maintenance planning, technical documentation and lifecycle engineering help keep specialized nuclear-powered vessels supportable.
Supplier opportunityQualified equipment support, inspection, precision components and approved technical services.
Contract N00024-20-C-2114. This is planning and engineering support, not a contract to build a new naval reactor.
04$31.1M — Lockheed Martin RMS
Produce sonar-system hardware under an existing Navy program.
Details
ContractA $31,057,771 cost-plus-incentive-fee option exercised November 20 and publicly announced November 24. Work is expected through March 2034.
Production locationsManassas, Virginia (65%); Clearwater, Florida (32%); Syracuse, New York (2%); Marion, Florida (1%).
Financial detailAll $31,057,771 of FY2027 Navy other-procurement funding was obligated at award.
Supplier opportunityQualified acoustic electronics, ruggedized assemblies, cabling, specialized circuit boards and test equipment.
Contract N00024-20-C-6117. The public record does not identify a new sonar variant, unit quantities or individual hardware components. The confirmed work is production support.
05$20.5M — General Dynamics Mission Systems
Update information-assurance software for submarine combat control.
Details
ContractAn option supporting AN/BYG-1 information-assurance software builds, with work in Virginia and Rhode Island through December 2027.
Technical importanceAN/BYG-1 integrates submarine tactical, payload and weapons control with software security capabilities. Secure updates must coexist with approved combat-system configurations.
Financial detail$20.542M announced, with $3.947M obligated initially from several procurement, shipbuilding and research funding accounts.
Supplier opportunitySecure software development, testing, system integration, verification and documentation for qualified contractors.
Contract N00024-24-C-6210. The award is for information-assurance software, not a completely new combat system or an acquisition of $20.5M in cyber hardware.
06$10.1M — HII Newport News
Engineering and design support for submarine valves.
Details
ContractA $10.142M cost-plus-fixed-fee modification covering standard Navy valves installed in nuclear-powered submarines.
Technical importanceValve engineering involves configuration, materials, fit, inspection requirements and lifecycle support. Seemingly ordinary parts can require demanding qualification.
Financial detail$1.5M in FY2027 Navy operations and maintenance funding obligated at award.
Supplier opportunityPrecision machining, approved valve components, materials testing, inspection and technical documentation.
Contract N00024-22-C-2105. The award covers engineering and design work. It is not a $10.1M production order for finished valves.
04 / SUPPLIER OPPORTUNITIES

What Companies Could Actually Sell

Supplier capabilityPotential customerQualification hurdle
Sonar electronics and testingPrime acoustic-system manufacturersEnvironmental testing, configuration control and quality records
Specialized valves and machined partsShipbuilders and qualified component suppliersMaterial traceability, inspections and approved processes
Cybersecure naval softwareCombat-system development teamsSecurity restrictions, testing and accreditation
Research and simulationResearch programs and prime engineering teamsTechnical validation and proposal eligibility
Maintenance and marine servicesOperating contractors and approved service vendorsAvailability, marine safety and reliability
Procurement distinction: A prime contract already awarded to HII, Lockheed Martin, General Dynamics or Crowley does not automatically create an open competition for outside suppliers. New entrants generally need to qualify with the prime, respond to a valid subcontract solicitation or compete through a separate government opportunity.
Research Sources and Official Documentation

Research as of November 25, 2026. Contract announcements, funding obligations, future options and potential supplier opportunities are distinguished throughout. Procurement descriptions do not establish classified system performance or undisclosed technical specifications.

05 / INTERACTIVE SUPPLIER MODEL

Can a Supplier Clear the Production Backlog?

Test how output, quality and qualification delays affect the delivery of hypothetical sonar or precision-engineered components. These are user-set assumptions, not actual Navy production rates.

100 units Illustrative supplier backlog
12 units Before first-pass rejection
85% Rejected units excluded from accepted output
3 months Time before productive delivery starts
Accepted units / month 10.2
Production duration 10 mo
Backlog clear 13 mo
At these assumptions, 100 units require 10 production months plus 3 months of initial delay.

Calculation: accepted output = gross output × first-pass acceptance. Production months = backlog ÷ accepted output, rounded up; total includes initial delay. Assumes constant production, no recovery of rejected units, no overlap with qualification and no changes in funding, priority or equipment availability. This tool does not predict a real naval contract's delivery performance.

Feedback Welcome

We welcome your feedback, suggestions, corrections, and ideas for enhancements.

Please click here to get in touch
By the ShipUniverse Editorial Team — About Us | Contact


← Browse more ShipUniverse posts
MARITIME DECISION TOOLS

Practical tools for real vessel and commercial decisions

Browse the latest 24 tools or instantly search every published ShipUniverse maritime tool.

24 latest toolsView all 330 →
TOOL

Cruise Onboard Revenue, Beverage Packages, Casino, Specialty Dining & Guest Spending Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / CRUISE COMMERCIAL INTELLIGENCE…

Open →
TOOL

Ship Sale-Leaseback, JOLCO vs Bank Financing, Balloon Payments & Equity IRR Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / MARITIME FINANCE &…

Open →
TOOL

FPSO/FSO Shuttle Tanker Fleet, Offshore Loading Windows, Storage Capacity & Production Curtailment Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / OFFSHORE PRODUCTION &…

Open →
TOOL

Container Liner Service Design, Slot Charter vs Owned Ships, Empty Repositioning & Network Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / CONTAINER NETWORK COMMERCIAL…

Open →
TOOL

VLCC Floating Storage vs Trading, Oil Contango, Charter Rates & Tanker Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / TANKER ASSET &…

Open →
TOOL

PCTC Vehicle Cargo Mix, Deck Capacity, Port Rotation & Voyage Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / VEHICLE CARRIER COMMERCIAL…

Open →
TOOL

Shipyard Change Orders, Scope Growth, Subcontractor Claims & Newbuild Cost Recovery Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / NEWBUILD COMMERCIAL CONTROL…

Open →
TOOL

Alternative Fuel Bunkering Network, Port Availability, Fuel Supply Contracts & Voyage Deviation Economics Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / MARINE FUEL &…

Open →
TOOL

Maritime Cloud Service Outage, Backup Communications, Fleet Downtime & Business Continuity ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / FLEET DIGITAL RESILIENCE…

Open →
TOOL

Bulk Terminal Stockpile, Conveyor & Shiploader Capacity, Vessel Queues & Demurrage Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / BULK TERMINAL COMMERCIAL…

Open →
TOOL

Offshore Cable-Laying Vessel Fleet, Installation Scheduling, Weather Downtime & Project Delay Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / OFFSHORE CONSTRUCTION ECONOMICS…

Open →
TOOL

Port Electric RTG & Terminal Tractor Fleet, Charging Infrastructure, Grid Capacity & ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / TERMINAL ELECTRIFICATION INTELLIGENCE…

Open →
TOOL

Cruise Private Island Investment, Berth Capacity, Guest Spending & Destination Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / CRUISE DESTINATION INVESTMENT…

Open →
TOOL

FSRU Regasification Capacity, LNG Send-Out, Gas Offtake Contracts & Conversion ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / FLOATING LNG REGASIFICATION…

Open →
TOOL

Offshore CO₂ Shipping Supply Chain, LCO₂ Carrier Fleet Sizing, Terminal Slots & Transport Economics Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / OFFSHORE CARBON TRANSPORT…

Open →
TOOL

Shipyard Production Capacity, Critical Supplier Bottlenecks, Workforce Allocation & Newbuild Delay Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / SHIPBUILDING OPERATIONS &…

Open →
TOOL

Cruise Shore Excursion Capacity, Tour Operator Revenue Share, Cancellation Risk & Port-Day Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / CRUISE & DESTINATION…

Open →
TOOL

Maritime GNSS Jamming & Spoofing, Backup Navigation Readiness, Voyage Delay & Retrofit ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / BRIDGE RESILIENCE &…

Open →
TOOL

Fleet Vessel Deployment, Ballast Positioning, Charter Opportunities & TCE Optimization Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / COMMERCIAL FLEET DECISION…

Open →
TOOL

Port Terminal Operating System Upgrade, Automation Tender, Operational Downtime & CAPEX ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / PORT SYSTEMS &…

Open →
TOOL

Floating LNG Storage Unit Investment, Bunkering Slots, Open-Access Fees & Charter ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / LNG INFRASTRUCTURE &…

Open →
TOOL

Panama Canal Transit Slot Auction, Waiting Time, Draft Restrictions & Route Diversion Economics Tool

🔔 Subscribe to ShipUniverse Weekly → ShipUniverse / Canal Access &…

Open →
TOOL

Offshore Wind O&M Vessel Fleet, CTV/SOV Scheduling, Technician Transfers & Turbine Downtime Cost Tool

🔔 Subscribe to ShipUniverse Weekly → ShipUniverse / offshore wind operations…

Open →
TOOL

Vessel Sale & Purchase Closing, Escrow, Bunker ROB, Delivery Documents & Cash Settlement Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / VESSEL TRANSACTION INTELLIGENCE…

Open →