SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…
SHIPUNIVERSE REPORTING

Reports, news and industry coverage

Full analysis in the ShipUniverse intelligence layout.

← Back to latest posts ShipUniverse / NEWS

Long Beach’s $300 Million Terminal Project Faces $23 Million Change Order

🔔 Subscribe to ShipUniverse Weekly →

Port of Long Beach, California Pier G terminal construction and separate deep-draft navigation improvements
Markers show documented port reference locations, not dredging boundaries

The Port of Long Beach placed two major infrastructure authorizations on its November 23, 2026, Harbor Commission agenda. Item HD-26-577 requested authority for a $23.138 million ninth change order on the Berth G234 Wharf and Pier G South Slip Fill project, which is expanding the container terminal operated by International Transportation Service. A separate item, HD-26-561, sought a $25.5 million spending authorization and an amendment to the port's memorandum of understanding with the Department of the Army to advance construction-phase activities for the Long Beach Deep Draft Navigation Improvements project. The same agenda also included a proposed $970,000 net eighth change order for the Pier G work. The proposals concern separate infrastructure programs; the agenda itself does not establish final approvals, executed amendments or a construction budget overrun.

Pier G South Slip Fill ITS container terminal, Berth G234 wharf construction and proposed ninth change order
Deep-Draft Navigation Program Harbor channels, basins and approaches covered by the separate Army cooperation agreement
ShipUniverse | Port Infrastructure & Finance | November 24, 2026

Long Beach Weighs $23.1 Million Wharf Change Order as Deep-Draft Costs Climb

Two separate construction authorizations expose different financial questions: who ultimately pays for Pier G modifications, and how a more expensive harbor-deepening program moves into construction.

Pier G Change Order No. 9 $23.14M

Proposed November 23 authorization

Deep-Draft Spending Request $25.50M

Separate Army memorandum amendment

Pier G Audited Estimate $300M

FY2025 financial-report figure

Revised Deep-Draft First Cost $255.81M

USACE 2026 validation estimate

Three Agenda Actions, Two Separate Projects

The November 23 agenda requested executive authority. It does not, by itself, document final voting results or executed contracts.

Agenda ItemAmountProposed ActionProject
HD-26-551 $970,000 net Authorize Change Order No. 8, comprising $4.652 million of additions and $3.682 million of deductions. Pier G wharf and slip fill
HD-26-577 $23,138,000 Authorize execution of Change Order No. 9. Pier G wharf and slip fill
HD-26-561 $25,500,000 Authorize Amendment No. 1 to the Department of the Army memorandum and associated spending. Deep-Draft Navigation Improvements
The central distinction: The proposed $23.138 million wharf change order is not automatically a $23.138 million increase in the port's total project budget. The $25.5 million navigation authorization belongs to a different project and cannot be added to Pier G construction costs.
Pier G's Financing Terms Deserve Attention

The City of Long Beach's audited FY2025 financial statements identify an availability-payment arrangement with International Transportation Service, LLC (ITS).

Financial ProvisionDocumented Arrangement
Estimated Project Cost $300 million in the FY2025 audited statements.
ITS Responsibility Design, construction and financing of the estimated project cost.
Conditional Harbor Exposure The Harbor Department agrees to fund costs above the $300 million estimate, up to $50 million if needed.
Construction-Period Payments Monthly contributions equivalent to 5% annual simple interest on approved reimbursable costs.
Repayment Structure After substantial completion, approved reimbursable costs are repaid through monthly rent credits or cash payments at the Harbor Department's option, with a 5% simple-interest provision.
Timing Substantial completion anticipated in December 2028; repayments could extend through the agreement's August 2051 expiration.
Expenses at September 30, 2025 $45.2M

Cumulative project expenses reported in the FY2025 audit. This is a historical balance, not the current total construction cost.

Interest Provision 5% annually

Applied to approved reimbursable costs under the arrangement, with monthly contributions during construction and a post-completion repayment mechanism.

A separate July 2025 financing announcement described the Slip Fill development as a $365 million project supported in part by $424 million of new credit facilities. Those transaction figures should not be treated as directly comparable to the audit's $300 million estimate: the published descriptions do not reconcile their respective scopes, financing uses and measurement dates.

The unanswered question is whether Change Order No. 9 changes costs borne by ITS, costs qualifying for Harbor reimbursement, or both. The publicly accessible agenda identifies its value but does not establish that allocation.
The $23.138 Million Change Order Is the Critical Unknown

Change Order No. 8 has a documented net composition: $4.652 million in additive items offset by $3.682 million in deductions. The agenda identifies the amount of Change Order No. 9 but does not provide an independently verified breakdown of its underlying construction scope.

Size 7.7% of $300M

The ninth change order's stated amount equals approximately 7.7% of the historical audited project estimate. This is a scale comparison, not a calculated overrun.

Cost Responsibility Not Established

The accessible agenda does not determine whether the change affects ITS financing, Harbor reimbursements or another cost allocation.

Construction Schedule 2028 Target

December 2028 remains the completion target cited in the audited financial report. A revised date attributable to the ninth change order has not been established.

Deep-Draft Costs Have Already Been Reestimated

The Army Corps' 2026 validation listing identifies a substantial revision to the navigation project's estimated first cost, separate from Pier G.

Earlier Cost at FY2026 Prices $189.31M

The previous $175.787 million authorized-cost figure restated to fiscal-year 2026 price levels.

Revised Estimated First Cost $255.81M

An increase of $66.503 million, or approximately 35.1%, on a consistent FY2026 price basis.

What drove the revision: USACE primarily attributes the increase to a 2024 update of its Cost Engineering Dredge Estimating Program, which revised dredging productivity, contractor markups, labor-market conditions and fuel-pricing assumptions. The estimate revision does not establish that $66.5 million has already been spent.

The navigation program addresses constraints in the Approach Channel, Main Channel, West Basin and Pier J approaches, including deeper and wider navigation areas for large commercial ships. The proposed November 23 memorandum amendment would allow the port to advance construction-phase work with the Army, subject to authorization and agreement terms.

The requested $25.5 million spending authority is not the total deep-draft project cost, nor does the agenda establish that it represents new spending above the revised $255.811 million estimate. The precise construction activities funded under the amendment require confirmation from the underlying agreement.
The Next Financial Disclosures Will Determine the Real Exposure
Decision PointWhat Still Needs ConfirmationCommercial Consequence
Pier G Change Order Detailed scope, price justification, funding allocation and any schedule adjustment. Determines the actual effect on construction economics and Harbor reimbursement exposure.
Availability Payments Updated approved reimbursable balance and projected post-completion payment schedule. Clarifies the longer-term financial obligation beyond construction.
Army Memorandum Specific work packages, timing, funding credits and responsibility under Amendment No. 1. Shows how construction is being advanced and funded.
Board Disposition Recorded November 23 votes, final signed change orders and executed memorandum. Separates proposed authority from binding project commitments.

Long Beach's November 23 agenda places two different infrastructure financing decisions under scrutiny. The $23.138 million Pier G change order raises an unresolved question about cost allocation within a long-term reimbursement arrangement, while the deep-draft program is moving toward construction under a substantially higher revised estimate. The financial effects will depend on the final approvals, contract details and updated project budgets—not the agenda amounts alone.

Feedback Welcome

We welcome your feedback, suggestions, corrections, and ideas for enhancements.

Please click here to get in touch
By the ShipUniverse Editorial Team — About Us | Contact


← Browse more ShipUniverse posts
MARITIME DECISION TOOLS

Practical tools for real vessel and commercial decisions

Browse the latest 24 tools or instantly search every published ShipUniverse maritime tool.

24 latest toolsView all 328 →
TOOL

FPSO/FSO Shuttle Tanker Fleet, Offshore Loading Windows, Storage Capacity & Production Curtailment Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / OFFSHORE PRODUCTION &…

Open →
TOOL

Container Liner Service Design, Slot Charter vs Owned Ships, Empty Repositioning & Network Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / CONTAINER NETWORK COMMERCIAL…

Open →
TOOL

VLCC Floating Storage vs Trading, Oil Contango, Charter Rates & Tanker Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / TANKER ASSET &…

Open →
TOOL

PCTC Vehicle Cargo Mix, Deck Capacity, Port Rotation & Voyage Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / VEHICLE CARRIER COMMERCIAL…

Open →
TOOL

Shipyard Change Orders, Scope Growth, Subcontractor Claims & Newbuild Cost Recovery Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / NEWBUILD COMMERCIAL CONTROL…

Open →
TOOL

Alternative Fuel Bunkering Network, Port Availability, Fuel Supply Contracts & Voyage Deviation Economics Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / MARINE FUEL &…

Open →
TOOL

Maritime Cloud Service Outage, Backup Communications, Fleet Downtime & Business Continuity ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / FLEET DIGITAL RESILIENCE…

Open →
TOOL

Bulk Terminal Stockpile, Conveyor & Shiploader Capacity, Vessel Queues & Demurrage Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / BULK TERMINAL COMMERCIAL…

Open →
TOOL

Offshore Cable-Laying Vessel Fleet, Installation Scheduling, Weather Downtime & Project Delay Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / OFFSHORE CONSTRUCTION ECONOMICS…

Open →
TOOL

Port Electric RTG & Terminal Tractor Fleet, Charging Infrastructure, Grid Capacity & ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / TERMINAL ELECTRIFICATION INTELLIGENCE…

Open →
TOOL

Cruise Private Island Investment, Berth Capacity, Guest Spending & Destination Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / CRUISE DESTINATION INVESTMENT…

Open →
TOOL

FSRU Regasification Capacity, LNG Send-Out, Gas Offtake Contracts & Conversion ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / FLOATING LNG REGASIFICATION…

Open →
TOOL

Offshore CO₂ Shipping Supply Chain, LCO₂ Carrier Fleet Sizing, Terminal Slots & Transport Economics Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / OFFSHORE CARBON TRANSPORT…

Open →
TOOL

Shipyard Production Capacity, Critical Supplier Bottlenecks, Workforce Allocation & Newbuild Delay Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / SHIPBUILDING OPERATIONS &…

Open →
TOOL

Cruise Shore Excursion Capacity, Tour Operator Revenue Share, Cancellation Risk & Port-Day Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / CRUISE & DESTINATION…

Open →
TOOL

Maritime GNSS Jamming & Spoofing, Backup Navigation Readiness, Voyage Delay & Retrofit ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / BRIDGE RESILIENCE &…

Open →
TOOL

Fleet Vessel Deployment, Ballast Positioning, Charter Opportunities & TCE Optimization Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / COMMERCIAL FLEET DECISION…

Open →
TOOL

Port Terminal Operating System Upgrade, Automation Tender, Operational Downtime & CAPEX ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / PORT SYSTEMS &…

Open →
TOOL

Floating LNG Storage Unit Investment, Bunkering Slots, Open-Access Fees & Charter ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / LNG INFRASTRUCTURE &…

Open →
TOOL

Panama Canal Transit Slot Auction, Waiting Time, Draft Restrictions & Route Diversion Economics Tool

🔔 Subscribe to ShipUniverse Weekly → ShipUniverse / Canal Access &…

Open →
TOOL

Offshore Wind O&M Vessel Fleet, CTV/SOV Scheduling, Technician Transfers & Turbine Downtime Cost Tool

🔔 Subscribe to ShipUniverse Weekly → ShipUniverse / offshore wind operations…

Open →
TOOL

Vessel Sale & Purchase Closing, Escrow, Bunker ROB, Delivery Documents & Cash Settlement Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / VESSEL TRANSACTION INTELLIGENCE…

Open →
TOOL

Harbor Tug Fleet Contract Tender, Utilization, Standby Fees & Towage Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / PORT & TOWAGE…

Open →
TOOL

Marine General Average, Cargo Contribution, Security Deposits & Claims Settlement Exposure Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / MARITIME CLAIMS &…

Open →