SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…
SHIPUNIVERSE REPORTING

Reports, news and industry coverage

Full analysis in the ShipUniverse intelligence layout.

← Back to latest posts ShipUniverse / NEWS

Seven Texas Ship Channels, One $134.7 Million Dredging Plan and a $135 Million Test for Bidders

🔔 Subscribe to ShipUniverse Weekly →

The U.S. Army Corps of Engineers issued an intent-to-consolidate notice on November 12, 2026, proposing to combine seven existing maintenance-dredging contracts covering major Texas navigation channels into one procurement. The identified projects are the Houston Ship Channel, Corpus Christi Ship Channel, Galveston Harbor and Channel, Texas City Ship Channel, Freeport Harbor, Matagorda Ship Channel, and Brazos Island Harbor. The Corps' Enterprise Dredge Delivery Center intends to solicit the work on an unrestricted basis using a firm-fixed-price, Scope-Dredge-to-Budget contracting approach. The official notice identifies solicitation W912PM27RA006 and anticipates its release on or around November 19, 2026. No contractor has been selected and no contract has been awarded.

Seven navigation projects named in the November 12 notice
01 Houston Ship Channel 02 Corpus Christi Ship Channel 03 Galveston Harbor & Channel 04 Texas City Ship Channel 05 Freeport Harbor 06 Matagorda Ship Channel 07 Brazos Island Harbor
Geographic reference: Texas Gulf Coast, United States. The map shows the regional locations, not surveyed channel limits, individual dredging reaches or placement sites.
ShipUniverse | Federal Maritime Procurement | November 2026

Seven Channels, One Contract, a $134.745 Million Draft Budget

The Army Corps plans to combine maintenance dredging across major Texas navigation projects. Its draft documents identify proposed allocations, technical requirements and a new approach to buying dredging performance within a fixed budget.

Existing Contracts to Consolidate 7

Projects named in the November 12 federal notice

Combined Draft Project Budgets $134.745M

Planning allocations, not an awarded value

Proposed Bidder Bonding Capacity $135M

Draft pass/fail qualification threshold

Expected Solicitation Release Nov 19

2026 target; final solicitation not yet issued

The Seven Projects and Their Draft Budgets

Extracted from the Corps' October deep-draft Scope-Dredge-to-Budget planning documents. Depths below refer to draft dredging-work specifications relative to mean lower low water (MLLW), not approved vessel drafts.

Texas Navigation Project Draft Budget Dredging Depth Proposed Equipment Placement / Logistics Maritime Activity Served
Houston Ship ChannelLargest Allocation $54.620M To -54.5 ft MLLW Hopper and pipeline/mechanical dredges Multiple upland placement areas and ocean disposal, with disposal travel up to approximately 38 miles in some cases. Energy, petrochemical, container, bulk and industrial shipping through the Houston complex.
Galveston Harbor & Channel $28.500M To -48 ft; limited advanced work to -51 ft MLLW Hopper dredges Ocean placement, with potential beneficial use on Galveston Island; transport up to approximately 24 miles. Commercial harbor access, cargo operations and cruise-vessel movements.
Corpus Christi Ship Channel $22.900M To -56 ft MLLW Hopper and pipeline/mechanical dredges Upland and open-water placement, ocean disposal and potential beneficial use on San José Island. Crude oil, refined products, LNG, dry bulk and energy-sector marine traffic.
Freeport Harbor $10.910M To -60 ft MLLW Hopper and pipeline/mechanical dredges Predominantly ocean disposal, with upland placement in an upper channel reach. Chemicals, energy exports, general cargo and industrial port activity.
Texas City Ship Channel $9.900M To -48 ft; limited advanced work to -51 ft MLLW Hopper or pipeline dredges Upland placement, beneficial-use sites and ocean disposal depending on the reach. Petroleum refining, chemical plants and related tanker and industrial shipping.
Brazos Island Harbor $5.805M To -58 ft MLLW Hopper and pipeline/mechanical dredges Upland, nearshore and beach placement; includes the southern Texas navigation corridor. Brownsville-area industrial shipping, shipyard activity and energy infrastructure.
Matagorda Ship Channel $2.110M To -40 ft MLLW Hopper and pipeline dredges Open-water, semi-confined, ocean and potential beneficial-use placement. Port Lavaca–Point Comfort industrial cargo and other Matagorda Bay navigation.
SEVEN-PROJECT TOTAL $134.745M Combined draft planning allocations. Final scope, pricing, quantities and award remain unconfirmed.
Financial distinction: These seven amounts are the Corps' draft FY2027 project allocations. They are not the verified historical awards for seven earlier contracts, nor are they the value of a new contract already awarded.
Nearly 79% of the Draft Budget Sits in Three Channels

Percentages calculated against the $134.745 million combined planning budget.

Houston Ship Channel 40.5%

$54.62 million in draft project allocation.

Galveston Harbor & Channel 21.2%

$28.5 million in draft project allocation.

Corpus Christi Ship Channel 17.0%

$22.9 million in draft project allocation.

Combined, these three channels account for $106.02 million, approximately 78.7% of the preliminary seven-project budget. This concentration is a budget observation, not evidence that the other channels will receive less dredging than required.
What Scope-Dredge-to-Budget Changes

The Corps is testing a procurement structure in which the contractor proposes what can be accomplished within a defined funding limit.

01 / BUDGET Defined Funding Ceiling

The government sets a budget limitation. Competing firms develop their dredging scope and execution plans around that financial limit.

02 / PRIORITIES Required Work Comes First

Draft evaluation materials prioritize required channel work before additional maintenance or proposed improvements.

03 / PERFORMANCE Depth and Durability

Earlier Corps notices identify channel maintenance over time, completion schedules and beneficial use as proposed performance considerations.

How Much Dredging Might Be Involved?

A September Corps industry presentation listed historical quantities for the individual projects. Summing those seven entries gives an approximate range of 16.9 to 21.0 million cubic yards.

Historical Quantity Indicators

Approximately 16.9–21.0 million cubic yards across the seven projects, based on the ranges in the earlier planning presentation. These are not guaranteed contract volumes.

Final Quantities Still Unknown

The successful contractor's proposed scope, updated surveys, priority reaches, placement arrangements and final award conditions will determine the actual commitment.

The Proposed Execution Window
19 NOVEMBER 2026 Solicitation Target

The formal request for proposals is anticipated on or around this date.

1 MAY 2027 Target Work Start

Draft scope identifies required early starts for Galveston Harbor and Houston's Bayport reach.

31 MAY 2028 Draft Completion Date

End of the preliminary deep-draft performance period, subject to the final contract.

Scope qualification: The November 12 consolidation notice confirms the seven projects and intended procurement. The budgets, dredging depths, historical quantities, production requirements and dates come from earlier draft Army Corps documents. They are subject to revision in the final solicitation.
ShipUniverse | Dredging Competition & Vessel Access

The $135 Million Test Behind the Seven-Channel Contract

The proposed consolidation has a second major dimension beyond dredging operations: who can qualify to compete. Draft conditions emphasize financial capacity, relevant experience, suitable dredging equipment and the ability to execute work across multiple Gulf Coast channels.

Four Numbers That Define the Proposed Competition

All qualification figures come from the draft procurement documents and remain subject to final solicitation changes.

Bonding Capacity $135M

Minimum proposed surety-backed capacity for a single project.

Relevant Past Work $50M

Minimum collective value of the three project examples.

Phase 2 Finalists Up to 5

Only shortlisted qualified offerors proceed to final proposals.

Intended Prime Awards 1

One best-value contract covering the seven named projects.

Important distinction: A $135 million bonding-capacity requirement is not a demand for bidders to deposit $135 million in cash. It is proposed evidence that a surety will support obligations on a project of that scale. It can still represent a substantial qualification hurdle.
How the Two-Phase Selection Would Work

The draft describes a qualification stage followed by a best-value technical and price competition.

Stage Draft Requirement What the Bidder Must Show Competition Implication Status
Phase 1 | Financial Capacity At least $135M bonding capacity for a single project. Signed, stamped certification from the bonding company. Smaller bidders may require teaming or substantial surety support. Draft Pass/Fail
Phase 1 | Past Performance Three relevant examples completed within six years, collectively at least $50M. Deep- and shallow-draft maintenance experience involving hopper and pipeline equipment. Established contractors or credible joint ventures may be better positioned. Draft Criterion
Phase 1 | Equipment Proposed dredging plants, availability, supporting equipment and redundancy. Capacity to handle dispersed harbors, deep-draft work and offshore disposal voyages. Fleet access and logistics become major parts of bid competitiveness. Draft Criterion
Phase 1 | Shortlisting No more than five qualified offerors advance. A complete and acceptable qualification submission. The broad initial competition may narrow sharply before pricing. Draft Process
Phase 2 | Required Work Priority 1 dredging work to be addressed before additional priorities. Credible work quantities, channel priorities, equipment deployment and schedule. More proposed optional maintenance may improve technical competitiveness. Proposed Evaluation
Phase 2 | Best Value Technical proposal, price, management, scheduling and other proposed factors. Ability to achieve the required scope within the budget and execution constraints. Lowest price is not necessarily the winning proposal. Proposed Evaluation
What the Corps May Reward Beyond Moving Sediment

The earlier industry-day materials identify a performance-oriented approach. These are proposed evaluation concepts, not confirmed final contract KPIs.

01 / CHANNEL PERFORMANCE More Time at Suitable Dimensions

Proposals may be evaluated on their ability to keep priority reaches at authorized dimensions for longer, rather than just the amount initially dredged.

02 / BENEFICIAL USE Productive Placement of Material

Dredged sediment may be directed toward approved beaches, islands, wetlands and other beneficial-use sites where technically and environmentally suitable.

03 / FLEET SCHEDULING Move Dredges Between Projects

A consolidated contractor can propose a coordinated schedule across channels with differing shoaling patterns, access requirements and disposal distances.

04 / OPERATIONAL RESILIENCE Equipment and Emergency Response

The draft approach considers maintenance reserves, equipment redundancy and an emergency shoal-response plan when assessing execution capability.

Do Not Confuse the Seven-Channel Package With the Separate Small-Business Contract

The Corps developed two related but distinct FY2027 Scope-Dredge-to-Budget procurement groups.

DEEP-DRAFT | W912PM27RA006 $134.745M Draft budget, unrestricted competition

Seven projects: Houston, Galveston, Texas City, Freeport, Matagorda, Corpus Christi and Brazos Island. The November 12 notice specifically consolidates these seven projects.

SHALLOW-DRAFT | W912PM27RA008 ~$26.2M Separate draft budget, small-business set-aside

Three other projects: Gulf Intracoastal Waterway, Channel to Victoria and Channel to Harlingen. The Corps issued a separate November 12 consolidation notice for this group.

Boundary of the story: Earlier planning documents also discussed the Sabine–Neches Waterway and other Texas projects. Those references do not make Sabine–Neches part of the specific seven-contract consolidation announced November 12. The $134.745M and $26.2M packages should remain separately identified.
Where the Commercial Effects Could Be Felt

Potential consequences are conditional. The procurement has not yet produced verified operating savings, delays or channel-depth improvements.

01 / LARGE DREDGE OPERATORS Broader Fleet Deployment

A successful contractor could coordinate hopper, pipeline and mechanical equipment across a larger geographic network. The benefit depends on utilization, material conditions and scheduling.

02 / SMALLER CONTRACTORS Teaming and Subcontracting

Financial and fleet requirements may encourage joint ventures, equipment commitments and specialist subcontracting rather than independent bids.

03 / SHIPOWNERS Reliability of Water Depth

Consistent maintenance can support more predictable voyage and draft planning. Outcomes depend on the dredging actually accomplished and subsequent shoaling.

04 / TERMINALS Maintenance Windows

Dredge work must be coordinated around berths, navigation traffic, industrial facilities and channel restrictions to avoid unnecessary disruption.

05 / COASTAL PROJECTS Material for Beneficial Use

Approved sediment placement could support beach or coastal restoration, subject to material suitability and environmental approvals.

06 / FEDERAL PROCUREMENT Scale Versus Competition

Consolidation may reduce repeated mobilization and administration while also narrowing the number of firms able to bid as primes. Actual results remain unproven.

Owner's Checklist – What to Verify Before Planning Deep-Draft Calls

A government dredging budget does not establish the water depth available to a vessel on a particular arrival or departure date.

01 / CURRENT SURVEYS Check Controlling Depths

Use the latest hydrographic surveys, not a draft contract's maximum dredging depth.

02 / REACH-SPECIFIC WORK Identify the Actual Channel Section

Determine which berth-access or transit reach is included in the active dredging schedule.

03 / PORT COORDINATION Confirm Navigation Windows

Check pilot, Coast Guard, Corps and terminal notices for dredging equipment and operating limitations.

04 / CARGO PLANNING Verify Approved Departure Draft

Do not assume channel maintenance automatically permits deeper loading or altered under-keel clearance.

05 / PROJECT STATUS Distinguish Award From Performance

A solicitation or award does not confirm that dredging has begun or that a reach has been restored.

06 / SURVEY FOLLOW-UP Watch Post-Dredging Conditions

Compare follow-up soundings against required dimensions and monitor any subsequent shoaling.

The Next Milestones

The dates below are government planning targets and may change when formal procurement documents are issued.

NOV 12, 2026 Consolidation Notice

Seven projects formally identified for the proposed unrestricted acquisition.

AROUND NOV 19, 2026 Final Solicitation

Watch for revised bonding, equipment, budget and performance terms.

SPRING 2027 Anticipated Award

Earlier industry materials target April, subject to evaluation and approvals.

MAY 2027 Proposed Dredging Start

Draft schedules identify early work at Galveston and Houston's Bayport reach.

Five Questions the Final Solicitation Must Resolve

These are the most useful details to compare with the preliminary procurement documents.

1. Will the $135 million bonding test remain unchanged?

The draft treats bonding capacity as a pass/fail gate. The final language will determine whether the threshold, documentary proof or teaming rules change.

2. How will the Corps measure channel maintenance performance?

Proposed evaluation material references required work, additional maintenance, channel dimensions over time and beneficial use. Final scoring, measurement dates and acceptance requirements are not yet established.

3. What is the actual value of the former seven contracts?

The available $134.745 million figure comes from FY2027 project planning. A verified comparison with previous awarded contract values would require matching the seven earlier awards, contract periods and modifications. No proven cost-saving percentage is available from these draft budgets.

4. Can smaller firms compete through partnerships?

Joint ventures and subcontractor participation appear in the draft procurement framework. Final responsibility, bonding, past performance and equipment rules will determine which arrangements are eligible and competitive.

5. Will the new approach improve navigable depths?

Only actual dredging completion, verified surveys and subsequent water-depth performance can establish this result. Neither the proposed budget nor the consolidation notice proves improvements have occurred.

The Army Corps is preparing to combine maintenance dredging for seven major Texas ship-channel projects into one unrestricted contract. Draft documents identify $134.745 million in planning budgets, a proposed $135 million bonding threshold and a two-phase selection process. The formal solicitation is expected around November 19, 2026. The eventual contractor, award value, dredging quantities, cost savings and effects on commercial navigation remain to be determined.

Feedback Welcome

We welcome your feedback, suggestions, corrections, and ideas for enhancements.

Please click here to get in touch
By the ShipUniverse Editorial Team — About Us | Contact


← Browse more ShipUniverse posts
MARITIME DECISION TOOLS

Practical tools for real vessel and commercial decisions

Browse the latest 24 tools or instantly search every published ShipUniverse maritime tool.

24 latest toolsView all 319 →
TOOL

Port Electric RTG & Terminal Tractor Fleet, Charging Infrastructure, Grid Capacity & ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / TERMINAL ELECTRIFICATION INTELLIGENCE…

Open →
TOOL

Cruise Private Island Investment, Berth Capacity, Guest Spending & Destination Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / CRUISE DESTINATION INVESTMENT…

Open →
TOOL

FSRU Regasification Capacity, LNG Send-Out, Gas Offtake Contracts & Conversion ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / FLOATING LNG REGASIFICATION…

Open →
TOOL

Offshore CO₂ Shipping Supply Chain, LCO₂ Carrier Fleet Sizing, Terminal Slots & Transport Economics Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / OFFSHORE CARBON TRANSPORT…

Open →
TOOL

Shipyard Production Capacity, Critical Supplier Bottlenecks, Workforce Allocation & Newbuild Delay Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / SHIPBUILDING OPERATIONS &…

Open →
TOOL

Cruise Shore Excursion Capacity, Tour Operator Revenue Share, Cancellation Risk & Port-Day Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / CRUISE & DESTINATION…

Open →
TOOL

Maritime GNSS Jamming & Spoofing, Backup Navigation Readiness, Voyage Delay & Retrofit ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / BRIDGE RESILIENCE &…

Open →
TOOL

Fleet Vessel Deployment, Ballast Positioning, Charter Opportunities & TCE Optimization Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / COMMERCIAL FLEET DECISION…

Open →
TOOL

Port Terminal Operating System Upgrade, Automation Tender, Operational Downtime & CAPEX ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / PORT SYSTEMS &…

Open →
TOOL

Floating LNG Storage Unit Investment, Bunkering Slots, Open-Access Fees & Charter ROI Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / LNG INFRASTRUCTURE &…

Open →
TOOL

Panama Canal Transit Slot Auction, Waiting Time, Draft Restrictions & Route Diversion Economics Tool

🔔 Subscribe to ShipUniverse Weekly → ShipUniverse / Canal Access &…

Open →
TOOL

Offshore Wind O&M Vessel Fleet, CTV/SOV Scheduling, Technician Transfers & Turbine Downtime Cost Tool

🔔 Subscribe to ShipUniverse Weekly → ShipUniverse / offshore wind operations…

Open →
TOOL

Vessel Sale & Purchase Closing, Escrow, Bunker ROB, Delivery Documents & Cash Settlement Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / VESSEL TRANSACTION INTELLIGENCE…

Open →
TOOL

Harbor Tug Fleet Contract Tender, Utilization, Standby Fees & Towage Profitability Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / PORT & TOWAGE…

Open →
TOOL

Marine General Average, Cargo Contribution, Security Deposits & Claims Settlement Exposure Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / MARITIME CLAIMS &…

Open →
TOOL

Chemical Tanker Cargo Parcel Allocation, Tank Compatibility, Cleaning Turnaround & Voyage Margin Tool

🔔 Subscribe to ShipUniverse Weekly → SHIP UNIVERSE / CHEMICAL TANKER…

Open →
TOOL

Marine Insurance Claims Portfolio, Hull & P&I Loss Runs, Reserves & Renewal Negotiation Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / FLEET INSURANCE &…

Open →
TOOL

Offshore Platform Decommissioning, Vessel Spread, Weather Windows & Removal Campaign Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / OFFSHORE ASSET RETIREMENT…

Open →
TOOL

Tanker & Bulker Commercial Pool, Fleet Earnings Distribution, Off-Hire & Pooling Economics Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / COMMERCIAL SHIPPING INTELLIGENCE…

Open →
TOOL

Port Terminal Concession Bid, Throughput Guarantees, Tariff Escalation & Investment NPV Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / PORT INFRASTRUCTURE INVESTMENT…

Open →
TOOL

Fleet Debt Covenant Headroom, Vessel Valuation Shock, Interest Rates & Refinancing Liquidity Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / FLEET FINANCING INTELLIGENCE…

Open →
TOOL

Maritime Freight FFA Hedging, Bunker Price Risk, Margin Calls & Cash-Flow Protection Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / FREIGHT DERIVATIVES &…

Open →
TOOL

Empty Container Repositioning, Depot Inventory, Leasing & Shortage Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / CONTAINER EQUIPMENT NETWORK…

Open →
TOOL

Subsea Cable Fault Repair, Vessel Spread, Restoration Timeline & Emergency Repair Cost Tool

🔔 Subscribe to ShipUniverse Weekly → SHIPUNIVERSE / SUBSEA EMERGENCY RECOVERY…

Open →