Reducing Ship Emissions at Port in 2026

Reducing ship emissions at port in 2026 comes down to two levers: stop running auxiliary engines while alongside, and reduce time spent waiting at anchor. The biggest “hard tech” is still shore power (OPS / cold ironing), but a practical 2026 plan usually mixes shore power readiness with energy storage, cleaner auxiliary power options, and port call timing tools. Regulatory pressure is also trending toward more in-port controls, notably California’s at-berth rules phasing in by vessel type, and Europe’s push toward shore-side electricity in core ports later this decade.

Reducing Ship Emissions at Port in 2026 - Tech Pros and Cons
Focus: cutting auxiliary engine runtime at berth and reducing waiting time near port. This table compares the main 2026 options and tradeoffs.
Tech or measure What it reduces at port Reduction level Advantages Disadvantages / watch-outs Where it tends to fit best What to measure or ask
Core
Shore power (OPS / cold ironing / AMP)
Most berth emissions from auxiliary engines (NOx, SOx, PM, CO2), depending on grid mix. High Directly turns off onboard generators at berth. Big local air-quality impact when used consistently. Needs compatible shore connection, ship retrofit, port availability, and power quality. CO2 benefit depends on grid intensity. Frequent callers with long berth stays and predictable terminals. Ask: berth availability, connector standard, changeover time, power price, downtime policy. Measure: hotel load (kW) and typical hours plugged in.
Core
Approved emission control strategies at berth (where allowed)
Aux engine emissions while alongside using approved compliance pathways when OPS is limited. High Can achieve strong at-berth reductions if the strategy is accepted and executed correctly. Approval and verification are jurisdiction-specific. Documentation and audits can be heavy. Regulated ports where compliance is enforced and pathways are clearly defined. Ask: what strategies are accepted for your vessel type and terminals, and how compliance is documented per call.
Power
Battery energy storage for hotel load (hybrid retrofit)
Aux engine runtime at berth and during maneuvering, plus peak shaving. Medium Reduces generator hours even when OPS is not available. Helps stabilize loads and can reduce noise. Upfront cost, space, weight, safety engineering, class requirements, and lifecycle planning. Ferries, short-sea, and repetitive port-call patterns with consistent hotel loads. Measure: kWh needed for typical berth stay and peak loads. Ask: safety case, cooling, degradation assumptions, warranty terms.
Power
Fuel cells for auxiliary power (pilot to early rollout)
Local pollutants and CO2 at berth, depending on fuel and upstream supply. High Very low local emissions at point of use. Quiet operation. Pairs well with batteries for peaks. Fuel logistics and certification are often the gating items. Early-stage economics for many ship types. Early adopters and short-sea segments where fuel supply planning is realistic. Ask: fuel supply chain, bunkering plan, maintenance model, stack life assumptions, class approvals.
Fuel
Lower-carbon fuels for auxiliary engines (where available)
CO2 profile and some pollutant outcomes, depending on fuel and engine setup. Medium Can be deployed quickly as a procurement lever with minimal hardware change in many cases. Availability, price volatility, sustainability credentials, and quality consistency are the constraints. Operators needing a near-term lever while waiting for OPS or major retrofits. Ask: fuel spec, compatibility, storage stability, documentation for reporting and claims.
Aftertreatment
SCR on auxiliary engines (NOx control)
NOx at port and maneuvering. Low Strong NOx reductions when correctly operated with good urea management. Not a CO2 solution. Requires urea logistics, maintenance, and performance management. Low-load behavior matters. Vessels where NOx is a main driver and operations support correct operating windows. Ask: NOx reduction at low load, urea consumption, maintenance intervals, monitoring approach.
Aftertreatment
DPF or particulate control for auxiliary engines
PM and black carbon at port. Medium Can materially improve local air quality impact near terminals and communities. Backpressure, regeneration strategy, and maintenance are the main friction points. Not a CO2 solution. Harbor areas with strong PM focus and compliance monitoring. Ask: regeneration method, soot loading assumptions, maintenance burden, proof at similar duty cycles.
Tip: drag the top scrollbar to scan columns quickly.
Tech or measure What it reduces at port Reduction level Advantages Disadvantages / watch-outs Where it tends to fit best What to measure or ask
Ops
Port call optimization and just-in-time arrival
Emissions while waiting at anchor or drifting near port approaches. Medium Often high ROI. Cuts wasted steaming and idle waiting when scheduling and berth planning align. Needs coordination with terminal readiness and reliable port call data. Benefits drop if berth plans are unstable. Congested ports and trades with frequent queueing near approaches. Measure: anchor hours per call and speed profiles. Ask: data feeds, decision authority, and change communication ship to shore.
Ops
Aux engine load management and hotel load reduction
Fuel burn and emissions at berth by avoiding poor generator loading and unnecessary consumers. Low Lower cost than major retrofits. Captures steady savings through better generator dispatch and reduced demand. Requires discipline and monitoring. Savings can be modest if loads are fixed by cargo needs. Most ship types, especially when generators run lightly loaded for long periods. Do: a berth load survey. Ask: generator loading targets, automation options, KPI reporting for berth fuel use.
Interfaces
OPS readiness retrofit (cabling, switchboards, transformers)
Enables OPS usage, which reduces auxiliary engine emissions when a berth has power. High Future-proofs vessels for ports expanding OPS. Reduces compliance risk in tightening ports. Capex and shipyard time. Value depends on how often you actually berth at OPS-ready terminals. Frequent callers on routes where OPS is expanding and vessels with long remaining life. Ask: retrofit scope, downtime, compatibility standards, support for multiple voltage and frequency profiles.
Reality check
What good looks like in 2026
Lower berth and port-stay emissions with proof, not assumptions. Medium Best results usually come from stacking: OPS where available, load control always, and port-call timing to cut waiting. Without measurement, teams overestimate impact. Without coordination, ships still arrive early and idle. Fleets that can standardize procedures across vessels and routes. Track: berth hours on OPS, berth fuel use when not on OPS, anchor hours per call, aux engine run hours per port day.
Tip: A simple KPI that catches most issues is “aux fuel per berth-hour,” split by “OPS available” and “OPS used.”
Bottom-Line Effect

The biggest port-emissions win is simple: reduce auxiliary engine runtime while alongside. In 2026, the most reliable approach is a repeatable stack: use shore power where it exists, keep hotel loads under control everywhere, and reduce time spent waiting at anchor by tightening port-call timing and ETA discipline.

Owner Playbook
  • Map your top 10 ports and note shore power availability by berth and schedule reliability.
  • Measure hotel load at berth and average berth hours for each service loop or trade.
  • Set a clear target: “OPS used when available” and a backup rule when it is not available.
  • Decide whether you need a retrofit now or an OPS-ready design that avoids a second retrofit later.
  • Cut anchor hours using port-call optimization plus stable ETA and terminal alignment.
What to track monthly
OPS hours Total berth hours Aux fuel per berth-hour Anchor hours per call Aux run hours per port day Speed variance
Recommended split: track “aux fuel per berth-hour” separately for (1) OPS available and (2) OPS not available. That split quickly shows whether the issue is infrastructure access or onboard procedure.
At-Berth Savings Calculator
Estimate how much fuel, CO2, and cost you could avoid by running on shore power during port stays. Keep it simple: plug in berth hours, hotel load, and either fuel rate or generator efficiency.
Hotel load includes reefer load, HVAC, pumps, lighting, galleys, and cargo-related electrical demand.
Use your logs if you have them. If not, start with a conservative estimate and refine later.
This captures real-world limits: berth availability, delays, and changeover practice.
Default is a commonly used marine diesel style factor. Replace with your reporting factor if different.
If provided, the tool estimates net CO2 change (ship avoided minus grid emissions).
Output
Enter your inputs and click “Run calculator.”
Assumptions made simple
1) The tool treats “shore power use” as a percentage of total berth hours.
2) If you select SFOC, fuel burn is estimated as: kW × SFOC × hours.
3) If you enter kg/hour, the tool uses that directly for fuel avoided.
4) “Net CO2” is only shown when grid intensity is provided, because grid mixes vary by port and time.
We welcome your feedback, suggestions, corrections, and ideas for enhancements. Please click here to get in touch.