Cruise Ship Elevator Capacity, Passenger Flow, Outage Risk & Modernization ROI Tool
Cruise Ship Elevator Capacity, Passenger Flow, Outage Risk & Modernization ROI Tool
Model passenger demand against lift-bank service rates, identify queue accumulation and outage vulnerability, and compare control upgrades or added capacity against their capital and operating consequences. Designed for operator planning, not certified lift traffic design.
Elevator Bank & Service Territory Register
Individual cars are aggregated by bank. Deck ranges must include the origin and destination decks assigned to that bank. Estimated cycle times are not guaranteed equipment performance.
| Bank | Low deck | High deck | Cars | Out of service | Car capacity (pax) | Usable load % | Round trip (s) | Remove |
|---|
Passenger Demand & Movement Waves
Peak is the estimated passengers per five minutes during the wave. Enter a demand shape, timing, origin and destination; these are simplified assigned-bank flows, not a full destination-dispatch simulation.
| Wave / occasion | Bank | Start min | End min | Peak pax / 5min | Shape | From deck | To deck | Priority | Remove |
|---|
Modernization & Lift Capacity Packages
Mark Apply to include an upgrade in the proposed plan. A bank may have only one applied upgrade. Savings and design performance are user-entered assumptions; only reviewed packages clear the tender gate.
| Apply | Package | Bank | Added cars | Cycle gain % | Usable load gain pts | CAPEX $ | Install days | Annual cash saving $ | Quote status | Remove |
|---|
Outage & Maintenance Window Register
Minutes are relative to the start of the peak period. An outage can apply to baseline only or to both cases, but cannot remove more than the installed bank cars. Enter observed or deliberately stressed outages.
| Cause | Bank | Start min | End min | Cars offline | Scenario | Remove |
|---|
Incremental Contract & Operating Costs
Only amounts incremental to this modernization decision. Recurring cash costs are annual; capital/startup charges occur once. Avoid entering a cost already included in package CAPEX.
| Scope / commercial item | Treatment | Amount $ | Evidence | Remove |
|---|
Safety, Accessibility & Contract Review Gates
A financial preference is not an authorization to alter lift control, fire-service behavior, accessible service or class-approved systems. Unresolved critical reviews must remain visible.
| Verification requirement | Bank | Critical? | Status | Evidence reference | Remove |
|---|