Ro-Ro Vehicle Terminal Yard Capacity, PDI & Vessel Loading Flow Tool
Ro-Ro Vehicle Terminal Yard Capacity, PDI & Vessel Loading Flow Tool
Run vehicle arrivals through finite parking, inspection and preparation capacity, then test which units can make vessel cutoffs. Expose overloaded zones, processing queues, rollover exposure and the cost of vehicle-days on terminal.
1 · Vehicle Arrival & Preparation Lots
Each row can describe a truck, rail or opening-stock lot. PDI/prep/charging percentages are modeled as independent subgroups; an evidence hold stays blocked. Target vessel uses its current row number (1 = first). Zone code can be Auto or the exact code entered below.
| Use | Vehicle lot / OEM | Arrival | Day | Vehicles | PDI % | Prep % | Charge % | Hold % | Zone | Target vessel # | Priority | Remove |
|---|
2 · Parking Yard & Zone Allocation
Opening occupancy consumes spaces but is not included in booked vessel loads or charged again. Vehicle lots prefer their selected zone; the engine can use spare open zones before placing units in the outside queue.
| Use | Code | Yard / parking section | Spaces | Opening occupied | Operational status | Remove |
|---|
3 · PCTC / Ro-Ro Vessel Windows
Loading allocation happens at the entered cutoff. Vehicles must be processed and inside the terminal by that day. They leave the yard during the loading window, limited by vessel space, vehicle lanes and user-estimated per-lane daily flow.
| Use | Vessel / service | Cutoff day | Loading starts | Sails day | Vehicle spaces | Loading lanes | Units / lane-day | Acceptance | Remove |
|---|
4 · Closures, Weather & Equipment Interruptions
Day windows use inclusive start / exclusive end. Percentage is the remaining throughput, not the percentage lost. Multiple simultaneous restrictions use the tightest remaining percentage.
| Use | Cause / operating note | Function | From day | To day (exclusive) | Capacity remaining % | Remove |
|---|
5 · Service & Commercial Cost Adjustments
Optional incremental costs such as rework, overflow transfer, additional security or handling. Values are additive and should not duplicate the general unit-service rates above.
| Use | Cost work package | Units | Rate $/unit | Status | Remove |
|---|
6 · Documentation, Safety & Loading Readiness Checks
Critical unresolved items generate an award/loading hold. Status reflects entered evidence only; it does not automatically validate customs, cargo securing or electric-vehicle controls.
| Use | Review item | Discipline | Critical? | Status | Evidence reference | Remove |
|---|