Inland Barge Tow, Lock Delay, Fleet Utilization & Voyage Profitability Tool
Inland Barge Tow, Lock Delay, Fleet Utilization & Voyage Profitability Tool
Model cargo earnings against navigation time, lock queues, fuel burn and towing costs. Simulate competing tows across shared chambers, visualize delay accumulation and identify where the next voyage loses its margin.
Tow Dispatch & Cargo Register
Each tow is a planned round trip. Cargo revenue applies to the laden leg; return movement consumes time/fuel but has no backhaul revenue. Positions are relative route miles, not real river miles.
| Use | Tow / vessel | Barges | t / barge | Tow length ft | Width ft | Draft ft | Departure h | Route miles | Laden mph | Return mph | Transit gal/h | Idle gal/h | Operating $/day | Freight $/t | Remove |
|---|
Shared Lock & Navigation Constraint Register
Enter locks in increasing mileage along the laden route. Chamber fit and draft are review gates. Max barges per lockage governs illustrative break-up cycles, not authorized tow configurations.
| Use | Lock / site | Mile from origin | Chambers | Chamber L ft | Chamber W ft | Published/entered depth ft | Max barges / cut | Cycle h / cut | Extra queue allowance h | Remove |
|---|
Restriction & Lock-Closure Windows
Windows use hours from the project reference time (hour 0), not dates. Active closures block lockage; a tow already started is not interrupted. A draft restriction may override the lock depth entered above.
| Use | Related lock | Start hour | End hour | Restriction type | Temporary allowable draft ft | Remarks | Remove |
|---|
Revenue, Handling & Contract Adjustments
Revenue and charges are optional per-tow adjustments. Base revenue is tonnes × entered freight rate; these adjustments may be positive or negative but must be explicitly labeled.
| Use | Related tow | Adjustment label | Revenue credit USD (+) | Cost / penalty USD (+) | Status | Remove |
|---|
Navigation, Documentation & Operational Readiness
Unverified critical checks remain holds even when the voyage margin is positive. Confirm USCG requirements only where applicable; operator inputs do not establish compliance.
| Use | Readiness requirement | Priority | Status | Owner / evidence reference | Remove |
|---|