SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

15Live Radars 251Maritime Tools
24/7Intelligence Focus
GlobalIndustry Coverage
NEW RADARS

Explore our latest intelligence radars

RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…

Drydock Project Critical Path, Work Package & Schedule Overrun Tool

Drydock • Work Packages • Critical Path • Contractors • Changes • Off-Hire

Drydock Project Critical Path, Work Package & Schedule Overrun Tool

Turn a docking specification into a dependency-based plan. Compare original work scope with current progress, yard workfront capacity, contractor availability, approved changes and downtime. See which work packages control redelivery and where realistic recovery measures can reduce cost exposure.

Interactive critical-path GanttResource-constrained forecastingContractor capacity & accessChange orders and interruptionsFixed-scale recovery sensitivities
Fast docking screen: 10 inputsHull preparation comes first. Steel/coatings and machinery work then proceed in parallel, with coatings dependent on steel and commissioning after both paths. This is a simplified project network, not a contractor-loaded schedule.

Docking Project Snapshot

Superintendent / shipyard planningBuild a resource-constrained schedule using the four registers beneath the charts. Baseline uses full contracted work. Forecast starts at the entered status day and schedules remaining work, known changes and interruptions. Partial completion is assumed measured in work completed, not elapsed days.
Scheduling and safety boundary: This is a planning model, not class approval, yard authorization, contractual liquidated-damages advice or a live safety permit. Class survey scope, docking constraints, hot work, confined-space controls, materials, trials and certification must be verified with the shipyard, flag/class and competent specialists. The Advanced scheduler permits quarter-day work segments and is not a full shift-by-shift enterprise scheduler.

Work Package & Dependency Register

Every active task requires a unique ID. List predecessor IDs separated by commas; cycles, unknown IDs and crew requirements exceeding trade capacity block Calculate. "Progress" represents physically completed work. Remaining work is simulated from the status day.

UseIDWork package / scopeTradeDuration daysPredecessor IDsCrew teamsComplete %Budget USDSafety gateBaseline endForecast end

Contractor / Trade Capacity Register

Crews are simultaneous work teams, not headcount. Crew mobilization is measured from project day zero. The scheduler prevents competing tasks from using more teams than available.

UseTradeAvailable teamsMobilize dayDaily team cost USDOwner / contractor

Change Order & Discovery Register

Approved change order days and costs are applied only to the selected work package in the forecast. Pending rows are visible in the dispute/scope board but are not automatically added as committed costs.

UseChange / discoveryWork package IDExtra daysCost USDDecisionResponsible

Dock Closure, Hold & Verification Register

Closure rows suspend all active work during the entered absolute day window. Verification rows may be flagged critical, which creates a separate handover hold. An unverified safety item is never treated as authorization to proceed.

UseHold / checkTypeFrom dayDuration daysCritical?StatusResponsible