SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

17Live Radars 300Maritime Tools
24/7Intelligence Focus
GlobalIndustry Coverage
RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…

Ship Motor Starting Current, Voltage Dip & Generator Capacity Tool

Starting Current • Bus Voltage Dip • Locked-Rotor kVA • Generator Transient Strength • Start Sequencing • N-1 Capacity

Ship Motor Starting Current, Voltage Dip & Generator Capacity Tool

Screen shipboard motor starts against the actual generator bank instead of comparing motor kW with generator kW. Simple mode estimates starting current, locked-rotor kVA, initial bus-voltage dip and generator requirement. Advanced models multiple motors, start overlap, multiple generator sets, equivalent subtransient source strength, N-1 operation, voltage-squared torque retention and start-sequence risk.

Figures represent
↑
Eight inputs, focused on the start that stresses the bus.The allowable voltage dip is deliberately user-entered. Class, OEM, starter, contactor and vessel-specific requirements remain controlling.
MotorStarting amps & kVA
BusInitial voltage dip
GenerationCapacity & reserve

Motor Start

A at rated voltage.
V line-to-line, 3-phase.
Locked-rotor / limited-start current ÷ rated current.
Use motor/starter data where available.

Generator Bank

Total online generator kVA.
% on the online-bank base. Use OEM transient/subtransient data.
% of online kVA, modeled at 0.85 PF.
% user-entered project/class/OEM criterion.

System Limits & Starting Study

% user-entered.
% of online bank kVA.
% user-entered contingency screen.

Generator Register

Equivalent source strength is calculated from each online generator's kVA and entered Xdʺ. Pre-start load is shared in proportion to online kVA.

UseAvailable?NameRated kVAXdʺ %Pre-start load %

Motor Starting Sequence

Start time and acceleration duration allow overlapping starts. Enter the effective starting-current multiple produced by the actual starter. The method label is descriptive; the entered current multiple controls the calculation.

UseMotor / loadkWRated ARun PFMethodStart × FLAStart PFStart at sAccel sMin bus V %Essential?

Study / Protection Checks

Engineering boundary: the transient-voltage model is a planning/screening calculation using generator subtransient source impedance and starting loads represented as voltage-dependent impedance. It does not replace OEM dynamic generator/AVR simulation, class approval, short-circuit studies, protection coordination or a measured vessel starting test.