SHIPUNIVERSE
Maritime Intelligence, Tools & Live Industry Radars

One place for live maritime intelligence, practical decision tools, industry events and focused reporting.

17Live Radars 300Maritime Tools
24/7Intelligence Focus
GlobalIndustry Coverage
RADARS
TOOLS
All Tools
Latest 20
Open to load latest items…
NEWS
All News
Latest 20
Open to load latest items…
REPORTS
All Reports
Latest 20
Open to load latest items…
TECH
All Tech
Latest 20
Open to load latest items…
CRUISE
All Cruise
Latest 20
Open to load latest items…
NAVAL
All Naval
Latest 20
Open to load latest items…

Ballast Water Exchange & Treatment Planning Tool

BWM Convention • D-1 95% Exchange • 3× Pump-Through • 200 nm / 200 m • D-2 Treatment • BWMS Throughput • Tank Plan • Hold Time

Ballast Water Exchange & Treatment Planning Tool

Build a tank-by-tank ballast-water plan without mixing up D-1 exchange volume with D-2 treatment throughput. Simple mode estimates exchange or treatment time and checks the D-1 location criteria. Advanced combines D-1 pumping-through, D-1 sequential exchange and D-2 treatment in one tank register, then screens ballast-pump capacity, BWMS treatment capacity, operating envelope, hold time and voyage execution.

Figures represent
↑
Need multiple tanks, BWMS derating or mixed D-1/D-2 methods? Click Advanced above.The graphs on the right are deliberately stacked full-width so labels remain readable.
D-1 exchange95% / 3× volume screen
D-2 treatmentBWMS throughput & time
VoyageExchange-area screen

Management Method

m³.
m³/h.
× tank volume. Three times is deemed to meet D-1.
% of tank volume remaining before refill.
m³/h rated/effective capacity.

Exchange Area

nautical miles.
m.

Voyage / Exchange Area

nm.
m.
% of tank capacity.
Combined m³/h for the planned operation.

BWMS Operating Basis

°C.
PSU / practical salinity basis.
h. Enter 0 if not applicable to the approved BWMS.
h.

BWMS Unit Register

TRC/nameplate capacity and operational derating are vessel/system specific. Derating can represent fouling, filter limitations, lamp condition, electrolysis limits or other approved operating-envelope restrictions.

UseTechnologyRated capacity m³/hAvailable now?Operational derate %Power kW

Ballast Tank Plan Register

For D-1 pumping-through, volume basis is tank capacity and 3× capacity is the convention’s deemed-compliance benchmark. Sequential exchange uses the entered residual percentage. D-2 treatment uses the actual ballast volume to be treated.

UseTank capacity m³Ballast onboard m³Plan method

Ballast Water Management Checks

Regulatory / operational boundary: D-2 compliance is a biological discharge-performance standard and cannot be proven from flow rate or treatment time alone. This tool plans the hydraulic/operational side of a type-approved BWMS. Actual compliance depends on the approved system being operated within its certification and operating limits, required records, maintenance and any applicable sampling/port-State requirements.
By the ShipUniverse Editorial Team — About Us | Contact